{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T15:28:45Z","timestamp":1729610925940,"version":"3.28.0"},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,9]]},"DOI":"10.1109\/ramech.2008.4681345","type":"proceedings-article","created":{"date-parts":[[2008,11,25]],"date-time":"2008-11-25T11:27:43Z","timestamp":1227612463000},"page":"922-925","source":"Crossref","is-referenced-by-count":0,"title":["AGV Dispatching Strategy Based on Theory of Constraints"],"prefix":"10.1109","author":[{"given":"Shigang","family":"Song","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Aiping","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liyun","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"13","first-page":"1146","article-title":"multiagent agv dispatching system using multilevel decision methods","volume":"36","author":"li","year":"2002","journal-title":"Journal of Shanghai Jiao Tong University"},{"key":"11","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1016\/S0360-8352(99)00158-8","article-title":"system reliability and congestion in a material handling system","volume":"36","author":"benita","year":"1999","journal-title":"Computer & Industrial engineering"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1109\/MCOM.2012.6211500"},{"key":"3","first-page":"1108","article-title":"management & control of manufacturing cells based on theory of constrains","volume":"12","author":"wang","year":"2006","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1108\/01443579810199720"},{"journal-title":"Modern production material handling and simulation","year":"1998","author":"zhang","key":"1"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1080\/07408178908966222"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1080\/00207548408942459"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1016\/0167-188X(91)90016-U"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-004-2439-2"},{"key":"4","first-page":"252","article-title":"integrated production planning & control system based on drum-buffer-rope theory","volume":"12","author":"guo","year":"2006","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1016\/0278-6125(87)90019-7"},{"key":"8","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1007\/s10696-005-5992-6","article-title":"vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first","volume":"17","author":"pyung","year":"2005","journal-title":"International Journal of Flexible Manufacturing Systems"}],"event":{"name":"2008 IEEE Conference on Robotics, Automation and Mechatronics (RAM)","start":{"date-parts":[[2008,9,21]]},"location":"Chengdu, China","end":{"date-parts":[[2008,9,24]]}},"container-title":["2008 IEEE Conference on Robotics, Automation and Mechatronics"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4664826\/4681306\/04681345.pdf?arnumber=4681345","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,18]],"date-time":"2017-06-18T09:59:45Z","timestamp":1497779985000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/4681345\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,9]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/ramech.2008.4681345","relation":{},"subject":[],"published":{"date-parts":[[2008,9]]}}}