{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T12:48:12Z","timestamp":1730292492143,"version":"3.28.0"},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,9]]},"DOI":"10.1109\/ramech.2011.6070454","type":"proceedings-article","created":{"date-parts":[[2011,11,7]],"date-time":"2011-11-07T20:24:24Z","timestamp":1320697464000},"page":"47-50","source":"Crossref","is-referenced-by-count":0,"title":["Track slab fine adjustment system based on 6-DOF parallel mechanism"],"prefix":"10.1109","author":[{"given":"Yan","family":"Hao","sequence":"first","affiliation":[]},{"given":"Li","family":"Changchun","sequence":"additional","affiliation":[]},{"given":"Liu","family":"Xiaodong","sequence":"additional","affiliation":[]},{"given":"Zhang","family":"Jinying","sequence":"additional","affiliation":[]},{"given":"Hu","family":"Huajun","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/ROBOT.1996.506836"},{"key":"ref11","first-page":"147","article-title":"Optimal measurement configurations for Gough platform calibration","volume":"5","author":"daney","year":"2002","journal-title":"IEEE International Conference on Robotics and Automation"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.3901\/JME.2004.12.048"},{"key":"ref13","article-title":"Robotics","volume":"9","author":"zixing","year":"2009"},{"key":"ref4","first-page":"60","article-title":"The application of the precisely-adjusting survey technique to the laying of the ballastless track of the Beijing-Tianjin Inter-municipal Railway","author":"wei","year":"2008","journal-title":"Traffic Engineering and Technology for National Defence"},{"key":"ref3","volume":"5","author":"xiaoming","year":"2008","journal-title":"GEDO CE track measurement system (software manual)"},{"key":"ref6","first-page":"13","article-title":"Key construction technology for CRT I double-block ballastless track in tunnel","volume":"11","author":"shaofa","year":"2009","journal-title":"Journal of Railway Engineering Society"},{"key":"ref5","first-page":"57","article-title":"Application of GEDO CE track detection system in slab track construction","volume":"3","author":"chengkuan","year":"2009","journal-title":"Journal of Railway Engineering Society"},{"key":"ref8","article-title":"Construction techniques of Borg Fine-tuning on Ballastless track","author":"xuexin","year":"0","journal-title":"Science and Technology of West China"},{"key":"ref7","first-page":"1","article-title":"Key techniques of Fine-tuning on Ballastless track in Wuhan-Guangzhou Passenger Railway Line","volume":"1","author":"zhijian","year":"2010","journal-title":"Railway Engineering"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/ICICTA.2010.591"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/ICIC.2010.331"},{"journal-title":"Geometry Dynamics and Control of Parallel Manipulators","year":"2002","author":"yiu","key":"ref9"}],"event":{"name":"2011 IEEE 5th International Conference on Robotics, Automation and Mechatronics (RAM)","start":{"date-parts":[[2011,9,17]]},"location":"Qingdao, China","end":{"date-parts":[[2011,9,19]]}},"container-title":["2011 IEEE 5th International Conference on Robotics, Automation and Mechatronics (RAM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6062351\/6070444\/06070454.pdf?arnumber=6070454","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,21]],"date-time":"2017-03-21T17:32:15Z","timestamp":1490117535000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6070454\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,9]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/ramech.2011.6070454","relation":{},"subject":[],"published":{"date-parts":[[2011,9]]}}}