{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T13:13:01Z","timestamp":1730293981581,"version":"3.28.0"},"reference-count":19,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"},{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,7]]},"DOI":"10.1109\/safeprocess45799.2019.9213265","type":"proceedings-article","created":{"date-parts":[[2020,10,6]],"date-time":"2020-10-06T19:53:50Z","timestamp":1602014030000},"page":"555-561","source":"Crossref","is-referenced-by-count":1,"title":["A Method of Dynamic Risk Analysis and Assessment for Metro Power Supply System Based on Fuzzy Reasoning"],"prefix":"10.1109","author":[{"given":"Lili","family":"Guo","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wei","family":"Dong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xinya","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xingquan","family":"Ji","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"doi-asserted-by":"publisher","key":"ref10","DOI":"10.1049\/iet-gtd.2012.0326"},{"key":"ref11","first-page":"6","article-title":"Reliability evaluation of power system operation based on real-time operation state","volume":"29","author":"sun","year":"2005","journal-title":"Power Grid Technology"},{"key":"ref12","first-page":"204","article-title":"Overview of Dynamic Risk Assessment Method","volume":"33","author":"wu","year":"2013","journal-title":"Science and Technology Information"},{"key":"ref13","article-title":"Vulnerability assessment of urban rail network considering passenger congestion","volume":"33","author":"ye","year":"2016","journal-title":"Computer Applied Research"},{"year":"0","author":"chen","journal-title":"Study on the Dynamic Distribution of Urban Rail Transit Passenger Flow under Uncertain Conditions","key":"ref14"},{"year":"2017","author":"wei","journal-title":"Modeling and Simulation of metro traction po-wer supply system","key":"ref15"},{"key":"ref16","first-page":"81","article-title":"Fault analysis and Countermeasures of DC feeder cable in rail transit","volume":"18","author":"liu","year":"2015","journal-title":"Communication World"},{"key":"ref17","article-title":"Relay protection of Metro DC traction system and application of bilateral tripping","volume":"7","author":"tang","year":"2014","journal-title":"Shanghai Electric Technology"},{"year":"2011","author":"shao","journal-title":"Fault Diagnosis of Key Structures of Traction Power Supply System for Metro Trains Based on Fuzzy Logic","key":"ref18"},{"year":"2014","author":"huang","journal-title":"Study on evaluation method of urban rail transit network operation safety","key":"ref19"},{"key":"ref4","first-page":"14","article-title":"Reliability Design of Metro Power Supply System","author":"sun","year":"2006","journal-title":"Modern Urban Rail Transit"},{"key":"ref3","first-page":"45","article-title":"Current status, development and selection of DC power cables in Metro","volume":"2","author":"wang","year":"2002","journal-title":"Electrified Railway"},{"doi-asserted-by":"publisher","key":"ref6","DOI":"10.1049\/ip-gtd:19990542"},{"doi-asserted-by":"publisher","key":"ref5","DOI":"10.1109\/59.736248"},{"doi-asserted-by":"publisher","key":"ref8","DOI":"10.1109\/MPER.2001.4311187"},{"doi-asserted-by":"publisher","key":"ref7","DOI":"10.1016\/j.ijepes.2005.08.011"},{"key":"ref2","first-page":"28","article-title":"Fault Analysis of DC Power Cable in Shanghai Rail Transit","volume":"9","author":"da","year":"2006","journal-title":"Urban Rail Transit Research"},{"key":"ref1","article-title":"Breakdown Fault Analysis and Preventive Measures of DC High Voltage Cable","author":"wan","year":"2016","journal-title":"Modern Urban Rail Transit"},{"doi-asserted-by":"publisher","key":"ref9","DOI":"10.1109\/TPWRS.2010.2089809"}],"event":{"name":"2019 CAA Symposium on Fault Detection, Supervision and Safety for Technical Processes (SAFEPROCESS)","start":{"date-parts":[[2019,7,5]]},"location":"Xiamen, China","end":{"date-parts":[[2019,7,7]]}},"container-title":["2019 CAA Symposium on Fault Detection, Supervision and Safety for Technical Processes (SAFEPROCESS)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9203788\/9213242\/09213265.pdf?arnumber=9213265","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,17]],"date-time":"2022-07-17T21:46:34Z","timestamp":1658094394000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9213265\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,7]]},"references-count":19,"URL":"https:\/\/doi.org\/10.1109\/safeprocess45799.2019.9213265","relation":{},"subject":[],"published":{"date-parts":[[2019,7]]}}}