{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T01:45:51Z","timestamp":1740102351799,"version":"3.37.3"},"reference-count":15,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,9,22]],"date-time":"2023-09-22T00:00:00Z","timestamp":1695340800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,9,22]],"date-time":"2023-09-22T00:00:00Z","timestamp":1695340800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"funder":[{"DOI":"10.13039\/100006190","name":"Research and Development","doi-asserted-by":"publisher","id":[{"id":"10.13039\/100006190","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,9,22]]},"DOI":"10.1109\/safeprocess58597.2023.10295780","type":"proceedings-article","created":{"date-parts":[[2023,11,3]],"date-time":"2023-11-03T17:47:19Z","timestamp":1699033639000},"page":"1-6","source":"Crossref","is-referenced-by-count":0,"title":["An Integrated Optimization Algorithm of Cutting Parameters and Scheduling for Flexible Job Shop"],"prefix":"10.1109","author":[{"given":"Yuying","family":"Huang","sequence":"first","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yajie","family":"Ma","sequence":"additional","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bin","family":"Jiang","sequence":"additional","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Li","family":"Guan","sequence":"additional","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jiangnan","family":"Zhou","sequence":"additional","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Haoyang","family":"Zhang","sequence":"additional","affiliation":[{"name":"Nanjing University of Aeronautics and Astronautics,College of Automation Engineering,Nanjing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/ICSAI53574.2021.9664124"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.neucom.2020.07.004"},{"key":"ref15","first-page":"233","article-title":"Study on flexible job-shop scheduling problem based on improved discrete particle swarm optimization algorithm","volume":"45","author":"ding","year":"2018","journal-title":"Computer Science"},{"key":"ref14","first-page":"19","article-title":"Jaya: A simple and new optimization algorithm for solving constrained and unconstrained optimization problems","volume":"7","author":"rao","year":"2016","journal-title":"International Journal of Industrial Engineering Computations"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/JIOT.2022.3182798"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2021.3062625"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.04.158"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1115\/1.4050551"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/ICNN.1995.488968"},{"key":"ref7","first-page":"3519","article-title":"Integrated modeling and optimization of cutting parameters and flexible job shop scheduling for high efficiency and low carbon","volume":"27","author":"zhan","year":"2021","journal-title":"Computer Integrated Manufacturing System"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TEVC.2021.3100056"},{"key":"ref4","doi-asserted-by":"crossref","first-page":"950","DOI":"10.1177\/0954405413508280","article-title":"An investigation on quantitative analysis of energy consumption and carbon footprint in the grinding process","volume":"228","author":"ding","year":"2013","journal-title":"Proceedings of the Institution of Mechanical Engineers Part B Journal of Engineering Manufacture"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1007\/BF02023073"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-021-06755-7"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.825740"}],"event":{"name":"2023 CAA Symposium on Fault Detection, Supervision and Safety for Technical Processes (SAFEPROCESS)","start":{"date-parts":[[2023,9,22]]},"location":"Yibin, China","end":{"date-parts":[[2023,9,24]]}},"container-title":["2023 CAA Symposium on Fault Detection, Supervision and Safety for Technical Processes (SAFEPROCESS)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10295546\/10295577\/10295780.pdf?arnumber=10295780","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,27]],"date-time":"2023-11-27T19:28:08Z","timestamp":1701113288000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10295780\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,9,22]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/safeprocess58597.2023.10295780","relation":{},"subject":[],"published":{"date-parts":[[2023,9,22]]}}}