{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,28]],"date-time":"2025-10-28T14:59:26Z","timestamp":1761663566603,"version":"3.28.0"},"reference-count":25,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,11]]},"DOI":"10.1109\/smartgridcomm.2016.7778823","type":"proceedings-article","created":{"date-parts":[[2016,12,12]],"date-time":"2016-12-12T20:32:10Z","timestamp":1481574730000},"page":"576-581","source":"Crossref","is-referenced-by-count":2,"title":["An ABC algorithm for optimization of restoration path in a power grid with HVDC connection"],"prefix":"10.1109","author":[{"family":"Ke Xu","sequence":"first","affiliation":[]},{"family":"Bin Xie","sequence":"additional","affiliation":[]},{"family":"Chenggen Wang","sequence":"additional","affiliation":[]},{"family":"Qian Zhou","sequence":"additional","affiliation":[]},{"family":"Yunyun Xie","sequence":"additional","affiliation":[]},{"family":"Xi Chen","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/LESCPE.2001.941649"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.05.049"},{"key":"ref12","first-page":"24","article-title":"Investigation on the Efficiencies of Power System Reconfiguration with Different Black-start Schemes","volume":"33","author":"liu","year":"2009","journal-title":"Automation of Electric Power Systems"},{"key":"ref13","first-page":"72","article-title":"Automatic Establishment of Initial Black Start Schemes for Power Systems","volume":"32","author":"lin","year":"2008","journal-title":"Automation of Electric Power Systems"},{"key":"ref14","first-page":"21","article-title":"Optimization of Restoration Paths Considering Units Start-up Time Requirements at Early Stage of Power System Restoration","author":"han","year":"2009","journal-title":"Proceedings of the CSEE"},{"key":"ref15","first-page":"14","article-title":"Multi-objective Optimization of Power System Restoration Based on NSGA-II","volume":"33","author":"wang","year":"2009","journal-title":"Automation of Electric Power Systems"},{"key":"ref16","first-page":"45","article-title":"EMTDC Simulation Based on Detailed Control Model of HVDC System","volume":"32","author":"huang","year":"2007","journal-title":"Automation of Electric Power System"},{"key":"ref17","first-page":"92","article-title":"Analysis on Start-up Conditions of HVDC System in Black-start","volume":"35","author":"zhou","year":"2011","journal-title":"Automation of Electric Power Systems"},{"key":"ref18","first-page":"48","article-title":"The Role of Yunnan Guangdong &#x00B1;800 kV DC Project in CSG Black-start and Recovery Process","volume":"4","author":"zhou","year":"2010","journal-title":"Southern Power System Technology"},{"key":"ref19","first-page":"2367","article-title":"Research on black-start technology of HVDC power transmission system","author":"chen","year":"0"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/59.387912"},{"key":"ref3","first-page":"25","article-title":"Extended Black-start Schemes of Power Systems","volume":"31","author":"gu","year":"2011","journal-title":"Proceedings of the CSEE"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2011.0609"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/59.466500"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2011.6039162"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2011.09.012"},{"key":"ref2","first-page":"1","article-title":"Analysis of Large-Scale Blackout in UCTE Power Grid and Lessons to be Drawn to Power Grid Operation in China","volume":"31","author":"ge","year":"2007","journal-title":"Power System Technology"},{"key":"ref9","first-page":"164","article-title":"Optimal Strategy for Units Start-up During Power System Restoration","volume":"24","author":"liu","year":"2009","journal-title":"Transactions of China Electro technical Society"},{"key":"ref1","first-page":"1","article-title":"Review of Blackout in Hainan on September 26th?Causes and Recommendations","volume":"30","author":"tang","year":"2006","journal-title":"Automation of Electric Power Systems"},{"key":"ref20","article-title":"Restoration Analysis of &#x00B1; 660kV Yin-Dong Direct Current Power Transmission System","author":"chen","year":"2012","journal-title":"Journal of Shandong University Shandong"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2009.03.090"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2007.05.007"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-007-9149-x"},{"article-title":"An idea based on honey bee swarm for numerical optimization","year":"2005","author":"karaboga","key":"ref23"},{"key":"ref25","first-page":"32","article-title":"Data Envelopment Analysis Based Relative Effectiveness Assessment of Power System Black-start Plans","volume":"26","author":"liu","year":"2006","journal-title":"Proceedings of the CSEE"}],"event":{"name":"2016 IEEE International Conference on Smart Grid Communications (SmartGridComm)","start":{"date-parts":[[2016,11,6]]},"location":"Sydney, Australia","end":{"date-parts":[[2016,11,9]]}},"container-title":["2016 IEEE International Conference on Smart Grid Communications (SmartGridComm)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7764633\/7778724\/07778823.pdf?arnumber=7778823","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,1,5]],"date-time":"2017-01-05T08:46:28Z","timestamp":1483605988000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7778823\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/smartgridcomm.2016.7778823","relation":{},"subject":[],"published":{"date-parts":[[2016,11]]}}}