{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T14:10:36Z","timestamp":1730297436935,"version":"3.28.0"},"reference-count":14,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,10,1]],"date-time":"2023-10-01T00:00:00Z","timestamp":1696118400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,10,1]],"date-time":"2023-10-01T00:00:00Z","timestamp":1696118400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["62133011,61973237"],"award-info":[{"award-number":["62133011,61973237"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100012166","name":"National Key R&D Program of China","doi-asserted-by":"publisher","award":["2022YFB3305902"],"award-info":[{"award-number":["2022YFB3305902"]}],"id":[{"id":"10.13039\/501100012166","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,10,1]]},"DOI":"10.1109\/smc53992.2023.10394036","type":"proceedings-article","created":{"date-parts":[[2024,1,29]],"date-time":"2024-01-29T18:32:04Z","timestamp":1706553124000},"page":"2701-2706","source":"Crossref","is-referenced-by-count":0,"title":["A Phased Scheduling Method with an Improved GA for Material Delivery Problem of Aircraft Pulsating Assembly Line*"],"prefix":"10.1109","author":[{"given":"Yiwen","family":"Fang","sequence":"first","affiliation":[{"name":"College of Electronics and Information Engineering, Tongji University,Shanghai,China,201804"}]},{"given":"Fei","family":"Qiao","sequence":"additional","affiliation":[{"name":"College of Electronics and Information Engineering, Tongji University,Shanghai,China,201804"}]},{"given":"Juan","family":"Liu","sequence":"additional","affiliation":[{"name":"College of Electronics and Information Engineering, Tongji University,Shanghai,China,201804"}]}],"member":"263","reference":[{"issue":"16","key":"ref1","first-page":"40","article-title":"Aircraft moving assembly line-pulsation and continuation[J]","volume":"64","author":"Fang","year":"2021","journal-title":"Aeronautical Manufacturing Technology"},{"key":"ref2","first-page":"1097","article-title":"Material delivery system for aircraft composite component manufacturing workshop [C]","volume-title":"Proceedings of The International Multi Conference of Engineers and Computer Scientists","author":"Mei","year":"2011"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2016.12.012"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1108\/AA-06-2020-0081"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2021.11.064"},{"issue":"1","key":"ref6","first-page":"136","article-title":"Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line[J]","volume":"47","author":"Lu","year":"2019","journal-title":"Journal of Tongji University (Natural Science)"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1554917"},{"issue":"3","key":"ref8","first-page":"1","article-title":"Research on model and algorithm for material delivery just in time of aircraft moving assembly line[J]","volume":"42","author":"Shen","year":"2020","journal-title":"Manufacturing Automation"},{"issue":"21","key":"ref9","first-page":"2534","article-title":"Aircraft Assembly Material Delivery Path Planning Based on Normal Fuzzy Time Window Constraints[J]","volume":"28","author":"Zhu","year":"2017","journal-title":"China Mechanical Engineering"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2018.10.001"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.495088"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1371\/journal.pone.0181747"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2019.105552"},{"issue":"10","key":"ref14","first-page":"2872","article-title":"Job shop scheduling considering multiple AGVs with charging[J]","volume":"27","author":"Li","year":"2021","journal-title":"Computer Integrated Manufacturing Systems"}],"event":{"name":"2023 IEEE International Conference on Systems, Man, and Cybernetics (SMC)","start":{"date-parts":[[2023,10,1]]},"location":"Honolulu, Oahu, HI, USA","end":{"date-parts":[[2023,10,4]]}},"container-title":["2023 IEEE International Conference on Systems, Man, and Cybernetics (SMC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10391856\/10393862\/10394036.pdf?arnumber=10394036","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,3]],"date-time":"2024-03-03T06:55:13Z","timestamp":1709448913000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10394036\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,1]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/smc53992.2023.10394036","relation":{},"subject":[],"published":{"date-parts":[[2023,10,1]]}}}