{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,1,9]],"date-time":"2024-01-09T23:25:16Z","timestamp":1704842716176},"reference-count":26,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"2","license":[{"start":{"date-parts":[[2015,4,1]],"date-time":"2015-04-01T00:00:00Z","timestamp":1427846400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"funder":[{"DOI":"10.13039\/100000001","name":"National Science Foundation under","doi-asserted-by":"crossref","award":["CMMI-1160968"],"award-info":[{"award-number":["CMMI-1160968"]}],"id":[{"id":"10.13039\/100000001","id-type":"DOI","asserted-by":"crossref"}]},{"DOI":"10.13039\/501100011434","name":"the State Key Laboratory for Manufacturing Systems Engineering, Xi'an Jiaotong University","doi-asserted-by":"crossref","id":[{"id":"10.13039\/501100011434","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Automat. Sci. Eng."],"published-print":{"date-parts":[[2015,4]]},"DOI":"10.1109\/tase.2014.2330793","type":"journal-article","created":{"date-parts":[[2014,7,11]],"date-time":"2014-07-11T18:57:05Z","timestamp":1405105025000},"page":"764-768","source":"Crossref","is-referenced-by-count":7,"title":["Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control"],"prefix":"10.1109","volume":"12","author":[{"given":"Semyon M.","family":"Meerkov","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chao-Bo","family":"Yan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","author":"curry","year":"2010","journal-title":"Manufacturing Systems Modeling and Analysis"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1080\/05695557708975141"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TR.1986.4335398"},{"key":"ref13","first-page":"209","article-title":"Calcul de la productivit\ufffd d'une ligne int\ufffdgr\ufffde de fabrication: CALIF, un logiciel industriel bas\ufffd sur une nouvelle heuristique","volume":"21","author":"ancelin","year":"1987","journal-title":"Automatique-Productique Informatique Industrielle"},{"key":"ref14","first-page":"1157","article-title":"The maximum production rate for an unbalances multiserver flow line system with finite buffer storage","volume":"25","author":"iyama","year":"1987","journal-title":"Int J Prod Res"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1080\/07408179908969842"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1080\/07408170108936854"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TAC.2004.835584"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TAC.2013.2240111"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.2307\/1427040"},{"key":"ref4","author":"askin","year":"1993","journal-title":"Modeling and Analysis of Manufacturing Systems"},{"key":"ref3","author":"viswanadham","year":"1992","journal-title":"Performance Modeling of Automated Manufacturing Systems"},{"key":"ref6","author":"papadopoulos","year":"1993","journal-title":"Queueing Theory in Manufacturing Systems Analysis and Design"},{"key":"ref5","author":"buzacott","year":"1993","journal-title":"Stochastic Models of Manufacturing Systems"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4612-1924-8"},{"key":"ref7","author":"gershwin","year":"1994","journal-title":"Manufacturing Systems Engineering"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2012.6464982"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-75579-3"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(83)90235-7"},{"key":"ref20","author":"burman","year":"0","journal-title":"New results in flow line analysis"},{"key":"ref22","first-page":"490","article-title":"Modeling and analysis of two-stage systems with parallel machines and limited repair capacity","author":"colledani","year":"2009","journal-title":"Preprints 13th IFAC Symp Inf Control Problems in Manufacturing"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/S0895-7177(00)00296-X"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.776191"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2008.05.022"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-58604-0"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1109\/CDC.2013.6760750"}],"container-title":["IEEE Transactions on Automation Science and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8856\/7079441\/06853412.pdf?arnumber=6853412","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T16:42:12Z","timestamp":1642005732000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/6853412\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,4]]},"references-count":26,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.1109\/tase.2014.2330793","relation":{},"ISSN":["1545-5955","1558-3783"],"issn-type":[{"value":"1545-5955","type":"print"},{"value":"1558-3783","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,4]]}}}