{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T17:18:17Z","timestamp":1771003097534,"version":"3.50.1"},"reference-count":103,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"4","license":[{"start":{"date-parts":[[2010,11,1]],"date-time":"2010-11-01T00:00:00Z","timestamp":1288569600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Eng. Manage."],"published-print":{"date-parts":[[2010,11]]},"DOI":"10.1109\/tem.2010.2040745","type":"journal-article","created":{"date-parts":[[2010,3,19]],"date-time":"2010-03-19T12:31:42Z","timestamp":1269001902000},"page":"689-701","source":"Crossref","is-referenced-by-count":45,"title":["Uncertainty in Through-Life Costing\u2013-Review and Perspectives"],"prefix":"10.1109","volume":"57","author":[{"given":"Yee Mey","family":"Goh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Linda B.","family":"Newnes","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Antony R.","family":"Mileham","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chris A.","family":"McMahon","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad E.","family":"Saravi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1021\/es020971+"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1065\/lca2004.09.178.1"},{"key":"ref33","author":"earl","year":"2005","journal-title":"Design Process ImprovementA Review of Current Practice"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/S0951-8320(96)00078-6"},{"key":"ref31","article-title":"statistical validation of engineering and scientific models: background","author":"hills","year":"1999","journal-title":"Sandia National Lab Memo"},{"key":"ref30","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/S0951-8320(02)00239-9","article-title":"models and model uncertainty in the context of risk analysis","volume":"79","author":"nilsen","year":"2003","journal-title":"Rel Eng Syst Saf"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1007\/BF02978849"},{"key":"ref36","article-title":"a review of approaches to treat uncertainty in lca","author":"heijungs","year":"2004","journal-title":"presented at the IEMSS"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1002\/ffej.20005"},{"key":"ref34","article-title":"a classification of uncertainty for early product and system design","author":"de weck","year":"0","journal-title":"presented at the ICED 2007"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.2514\/2.1125"},{"key":"ref27","author":"isukapalli","year":"1999","journal-title":"Uncertainty analysis of transporttransformation models Ph D dissertation State Univ New Jersey"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/3468.487959"},{"key":"ref20","year":"0","journal-title":"Golorath (2008) [Online] Available http \/\/www galorath com"},{"key":"ref22","year":"0","journal-title":"Relex Software Corp (2009) Relex Reliability Studio [Online] Available http \/\/www relexsoftware co uk"},{"key":"ref21","year":"0","journal-title":"Price Systems (2008) TruePlanning [Online] Available http \/\/www pricesystems com"},{"key":"ref24","year":"2009","journal-title":"CASA Cost analysis strategy assessment (CASA) total ownership cost model U S Army Logistics Support Activity"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1080\/09544820701803061","article-title":"Predicting the whole-life cost of a product at the conceptual design stage","volume":"19","author":"newnes","year":"2008","journal-title":"J Eng Des"},{"key":"ref101","author":"ben-haim","year":"2001","journal-title":"Information Gap Decision Theory"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1201\/9781420040906"},{"key":"ref100","author":"blanchard","year":"1990","journal-title":"Systems Engineering and Analysis"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00228-3"},{"key":"ref50","author":"arena","year":"2006","journal-title":"Impossible Certainty Cost Risk Analysis for Air Force Systems"},{"key":"ref51","article-title":"Life cycle costing&#x2014;A radical approach","author":"ferry","year":"1991","journal-title":"CIRIA"},{"key":"ref59","year":"2003","journal-title":"The Green Book Appraisal and Evaluation in Central Government"},{"key":"ref58","doi-asserted-by":"publisher","DOI":"10.1007\/s00163-003-0039-z"},{"key":"ref57","year":"2007","journal-title":"U S Government Accountability Office (GAO) Cost Assessment Guide Best Practices for Estimating and Managing Program Costs"},{"key":"ref56","year":"2007","journal-title":"North Atlantic Treaty Organization (NATO) Methods and models for life cycle costing NATO Res Tech Org Tech Rep TR-SAS-054"},{"key":"ref55","article-title":"EUROLIFEFORM: An integrated probabilistic whole life cycle cost and performance model for buildings and civil infrastructure","author":"kirkham","year":"2004","journal-title":"presented at the Int Constr Res Conf R Inst Chartered Surveyors"},{"key":"ref54","author":"fabrycky","year":"1991","journal-title":"Life-Cycle Cost and Economic Analysis"},{"key":"ref53","year":"1998","journal-title":"Australian National Audit Office (ANAO) Life-Cycle Costing in the Department of Defence"},{"key":"ref52","year":"0","journal-title":"National Audit Office (NAO) Through life management NAO London U K Rep HC 698 May 2003 Available http \/\/www nao org uk\/publications\/0203\/ministry_of_defence_through_l aspx"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1007\/BF02978818"},{"key":"ref4","author":"little","year":"1999","journal-title":"Total Cost Assessment Methodology"},{"key":"ref3","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1007\/BF02977849","article-title":"integrating life cycle cost analysis and lca","volume":"6","author":"norris","year":"2001","journal-title":"Int J LCA"},{"key":"ref6","year":"0"},{"key":"ref5","year":"2005","journal-title":"U S Department of Defense Performance Based Logistics A Program Manager's Product Support"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1080\/002075498193444"},{"key":"ref49","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.07.001"},{"key":"ref7","article-title":"life-cycle cost\/capability analysis for defence systems","author":"clark","year":"1999","journal-title":"presented at the Simul Tech Training Conf (SimTecT)"},{"key":"ref9","article-title":"Uncertainty challenges in service cost estimation for product&#x2013;service systems in the aerospace and defence industries","author":"erkoyuncu","year":"2009","journal-title":"presented at the CIRP IPS2 Conf"},{"key":"ref46","author":"boehm","year":"1981","journal-title":"Software Engineering Economics"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)61846-0"},{"key":"ref48","doi-asserted-by":"publisher","DOI":"10.1016\/0167-188X(90)90111-T"},{"key":"ref47","author":"mcconnell","year":"2006","journal-title":"Software Estimation Demystifying the Black Art"},{"key":"ref42","author":"de beaufort-langeveld","year":"2003","journal-title":"Code of Life Cycle Inventory Practice"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1162\/jiec.2007.1136"},{"key":"ref44","first-page":"23","article-title":"cost modelling for concurrent engineering","volume":"32","author":"creese","year":"1990","journal-title":"Cost Eng"},{"key":"ref43","author":"hosseini-nasab","year":"2002","journal-title":"Product cost estimating at the conceptual stage of design Ph D dissertation Dept Mech Eng Univ Bath"},{"key":"ref73","doi-asserted-by":"publisher","DOI":"10.1080\/09544829308914776"},{"key":"ref72","year":"1995","journal-title":"Parametric Cost Estimating Handbook Nat Aeronaut Space Admin"},{"key":"ref71","doi-asserted-by":"publisher","DOI":"10.1007\/s001700200058"},{"key":"ref70","doi-asserted-by":"publisher","DOI":"10.1007\/s001700170195"},{"key":"ref76","year":"2004","journal-title":"Department of Defense Affordability and lifecycle resource estimates in Defense Acquisition Guidebook"},{"key":"ref77","doi-asserted-by":"publisher","DOI":"10.1080\/09511920500324605"},{"key":"ref74","doi-asserted-by":"publisher","DOI":"10.1007\/s00163-007-0042-x"},{"key":"ref75","author":"book","year":"2001","journal-title":"Crosslink vol 2 Systems Engineering"},{"key":"ref78","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00045-X"},{"key":"ref79","year":"2008","journal-title":"DE&S A weapon system comes of age in Desider"},{"key":"ref60","article-title":"major weapon systems acquisition and life cycle cost estimation: a case study","author":"yoner","year":"2001","journal-title":"M S thesis Naval Postgraduate School"},{"key":"ref62","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2003.08.005"},{"key":"ref61","article-title":"why correlation matters in cost estimating","author":"book","year":"1999","journal-title":"presented at the 32nd Annu DOD Cost Anal Symp"},{"key":"ref63","doi-asserted-by":"publisher","DOI":"10.1115\/1.2137750"},{"key":"ref64","doi-asserted-by":"publisher","DOI":"10.1007\/s001700170195"},{"key":"ref65","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(02)00323-7"},{"key":"ref66","author":"roy","year":"2003","journal-title":"Cost Engineering Why What and How"},{"key":"ref67","doi-asserted-by":"publisher","DOI":"10.1109\/WCICA.2004.1342117"},{"key":"ref68","doi-asserted-by":"crossref","DOI":"10.7249\/TR410","author":"galway","year":"2007","journal-title":"Subjective Probability Distribution Elicitation in Cost Risk Analysis A Review"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1080\/096132100418519"},{"key":"ref69","article-title":"an approach to technology risk management","author":"valerdi","year":"2004","journal-title":"presented at the Eng Syst Div Symp"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1243\/09544054JEM1315"},{"key":"ref95","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/j.ress.2004.03.008","article-title":"Arithmetic with uncertain numbers: Rigorous and (often) best possible answers","volume":"85","author":"ferson","year":"2004","journal-title":"Rel Eng Syst Saf"},{"key":"ref94","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4899-3472-7"},{"key":"ref93","doi-asserted-by":"publisher","DOI":"10.1016\/S0951-8320(96)00071-3"},{"key":"ref92","doi-asserted-by":"publisher","DOI":"10.2514\/6.2001-1645"},{"key":"ref91","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2004.03.014"},{"key":"ref90","doi-asserted-by":"publisher","DOI":"10.1115\/1.2836465"},{"key":"ref103","doi-asserted-by":"publisher","DOI":"10.1109\/NAFIPS.2008.4531314"},{"key":"ref102","article-title":"information processing under imprecise risk with the hurwicz criterion","author":"jaffray","year":"2007","journal-title":"presented at the 5th Int Symp Imprecise Probability Theories Appl"},{"key":"ref98","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2009.5275882"},{"key":"ref99","doi-asserted-by":"publisher","DOI":"10.1016\/j.cad.2008.06.004"},{"key":"ref96","year":"0"},{"key":"ref97","doi-asserted-by":"publisher","DOI":"10.1115\/1.2204976"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(96)00089-0"},{"key":"ref11","article-title":"analysis of cost estimating processes used within a concurrent engineering environment throughout a product life cycle","author":"rush","year":"0","journal-title":"presented at the Int Conf Concurrent Eng 2000"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.2514\/6.1999-1612"},{"key":"ref13","author":"delaurentis","year":"1998","journal-title":"A probabilistic approach to aircraft design emphasizing stability and control uncertainties Ph D dissertation Georgia Tech"},{"key":"ref14","year":"0"},{"key":"ref15","year":"0"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1080\/01944360208976273"},{"key":"ref82","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1111\/1467-9884.00114","article-title":"eliciting expert beliefs in substantial practical applications","volume":"47","author":"o'hagan","year":"1998","journal-title":"Statistician"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.2514\/1.17362"},{"key":"ref81","year":"2008","journal-title":"NASA Cost Estimating Handbook NASA Cost Anal Div"},{"key":"ref18","year":"0"},{"key":"ref84","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(78)90029-5"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1108\/13552510210430017"},{"key":"ref83","doi-asserted-by":"publisher","DOI":"10.1080\/0144619042000176483"},{"key":"ref80","doi-asserted-by":"publisher","DOI":"10.1080\/00137910600695643"},{"key":"ref89","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-84628-935-4_81"},{"key":"ref85","doi-asserted-by":"publisher","DOI":"10.1023\/B:REOM.0000032115.22510.b5"},{"key":"ref86","doi-asserted-by":"publisher","DOI":"10.1016\/S0004-3702(03)00021-3"},{"key":"ref87","author":"moore","year":"1966","journal-title":"Interval Analysis"},{"key":"ref88","article-title":"computational methods for decision making based on imprecise information","author":"bruns","year":"2006","journal-title":"presented at the NFS Workshop Rel Eng Comput"}],"container-title":["IEEE Transactions on Engineering Management"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/17\/5595717\/05432980.pdf?arnumber=5432980","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,5,31]],"date-time":"2023-05-31T03:06:18Z","timestamp":1685502378000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5432980\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,11]]},"references-count":103,"journal-issue":{"issue":"4"},"URL":"https:\/\/doi.org\/10.1109\/tem.2010.2040745","relation":{},"ISSN":["0018-9391","1558-0040"],"issn-type":[{"value":"0018-9391","type":"print"},{"value":"1558-0040","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,11]]}}}