{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,5]],"date-time":"2026-03-05T16:16:15Z","timestamp":1772727375751,"version":"3.50.1"},"reference-count":37,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Ind. Inf."],"published-print":{"date-parts":[[2015]]},"DOI":"10.1109\/tii.2015.2396011","type":"journal-article","created":{"date-parts":[[2015,1,23]],"date-time":"2015-01-23T21:52:10Z","timestamp":1422049930000},"page":"1-1","source":"Crossref","is-referenced-by-count":73,"title":["A Novel Wind Power Forecast Model: Statistical Hybrid Wind Power Forecast Technique (SHWIP)"],"prefix":"10.1109","author":[{"given":"Mehmet","family":"Ozkan","sequence":"first","affiliation":[]},{"given":"Pinar","family":"Karagoz","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1002\/wics.101"},{"key":"ref32","year":"2014"},{"key":"ref31","year":"2015"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2014.03.033"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1016\/j.ymssp.2012.05.005"},{"key":"ref36","first-page":"283","article-title":"Design adaptive fuzzy inference sliding mode algorithm: Applied to robot arm","volume":"2","author":"piltan","year":"2011","journal-title":"Int J Robot Autom"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2013.11.015"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1093\/bioinformatics\/17.6.509"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1177\/0956247808096127"},{"key":"ref11","year":"2015"},{"key":"ref12","doi-asserted-by":"crossref","DOI":"10.2172\/968212","article-title":"Wind power forecasting: State-of-the-art 2009","author":"monteiro","year":"2009"},{"key":"ref13","article-title":"The state-of-the-art in short-term prediction of wind power: A literature overview","author":"giebel","year":"2011"},{"key":"ref14","article-title":"Analysis of the uncertainty of wind power predictions","author":"lange","year":"2003"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2011.05.033"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2013.12.054"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.3390\/en6094879"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/PSCE.2011.5772573"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2012.02.015"},{"key":"ref28","first-page":"137","article-title":"Determination of number of clusters in kmeans clustering and application in colour image segmentation","author":"ray","year":"0","journal-title":"Proc 4th Int Conf Adv Pattern Recog Digital Tech"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2012.2218253"},{"key":"ref27","first-page":"777","article-title":"The zephyr-project: The next generation prediction system","author":"giebel","year":"0","journal-title":"Proc Eur Wind Energy Conf (EWEC&#x2019;03)"},{"key":"ref3","first-page":"1","article-title":"Verification of a real time wind power monitoring and forecast system for Turkey","author":"ozkan","year":"0","journal-title":"Proc IET Renew Power Gen"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2012.2219063"},{"key":"ref29","doi-asserted-by":"crossref","DOI":"10.2172\/1008309","article-title":"A survey on wind power ramp forecasting","author":"ferreira","year":"2011"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2012.2234469"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2014.2359448"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2282366"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-40131-2_23"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2012.2190999"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2013.2294157"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1002\/we.295"},{"key":"ref22","first-page":"125","article-title":"Online-monitoring and prediction of wind power in german transmission system operation centres","author":"ernst","year":"0","journal-title":"Proc 1st IEA Joint Action Symp Wind Forecast Tech"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/NEUREL.2010.5644050"},{"key":"ref24","year":"2015"},{"key":"ref23","year":"2015"},{"key":"ref26","first-page":"16","article-title":"The casandra project: Results of wind power 72-h range daily operational forecasting in spain","author":"gaertner","year":"0","journal-title":"Proc Eur Wind Energy Conf (EWEC&#x2019;03)"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1007\/BF00712528"}],"container-title":["IEEE Transactions on Industrial Informatics"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9424\/7070852\/07018961.pdf?arnumber=7018961","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T16:50:54Z","timestamp":1642006254000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7018961\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"references-count":37,"URL":"https:\/\/doi.org\/10.1109\/tii.2015.2396011","relation":{},"ISSN":["1551-3203","1941-0050"],"issn-type":[{"value":"1551-3203","type":"print"},{"value":"1941-0050","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015]]}}}