{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,24]],"date-time":"2026-01-24T15:31:40Z","timestamp":1769268700404,"version":"3.49.0"},"reference-count":45,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"3","license":[{"start":{"date-parts":[[2014,3,1]],"date-time":"2014-03-01T00:00:00Z","timestamp":1393632000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Instrum. Meas."],"published-print":{"date-parts":[[2014,3]]},"DOI":"10.1109\/tim.2013.2281556","type":"journal-article","created":{"date-parts":[[2013,9,26]],"date-time":"2013-09-26T18:20:26Z","timestamp":1380219626000},"page":"566-582","source":"Crossref","is-referenced-by-count":51,"title":["Multipurpose Platform for Power System Monitoring and Analysis With Sample Grid Applications"],"prefix":"10.1109","volume":"63","author":[{"given":"Tevhid","family":"Atalik","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Isik","family":"Cadirci","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Turan","family":"Demirci","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Muammer","family":"Ermis","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tolga","family":"Inan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alper Sabri","family":"Kalaycioglu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ozgul","family":"Salor","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1109\/POWERCON.2010.5666448"},{"key":"ref38","first-page":"20","article-title":"Electrical interconnection between Turkey and Europe: Problems and solutions","author":"weber","year":"2009","journal-title":"Proc 13th MEPCON"},{"key":"ref33","year":"2013","journal-title":"Fluke 430 Series Power Quality Analyzer"},{"key":"ref32","year":"2013","journal-title":"Overview of Arbiter Products"},{"key":"ref31","year":"2013","journal-title":"National Physical Laboratory"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/SIU.2012.6204609"},{"key":"ref37","year":"2007","journal-title":"Complementary Studies for the Synchronization of the Turkish Power System with the UCTE Power System"},{"key":"ref36","year":"1999","journal-title":"Instrument Transformers-Part 7 Electronic Voltage Transformers"},{"key":"ref35","year":"1992","journal-title":"Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems"},{"key":"ref34","year":"2013","journal-title":"Dranetz 658-Power Quality Analyzer"},{"key":"ref10","year":"2012","journal-title":"National power quality project of Turkey"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/67.207465"},{"key":"ref40","year":"2009","journal-title":"Preventive measures for effective damping of inter area oscillations after synchronous interconnection of the Turkish power system with the UCTE power system"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/59.336093"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/61.660853"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/MPAE.2004.1338124"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2023272"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2002.805018"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2005.861960"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/59.910791"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2007.06.008"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2004.824503"},{"key":"ref28","year":"2013","journal-title":"Mini-ITX Mainboard Specification White Paper"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2008.2005075"},{"key":"ref27","year":"2005","journal-title":"IEEE Standard for Synchrophasors for Power System"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2008.4596413"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/IAS.2003.1257679"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2010.2058835"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2002.803300"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2004.825200"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.2005361"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2010.0483"},{"key":"ref1","first-page":"1","article-title":"Accurate fault-location technique based on distributed power-quality measurements","author":"tremblay","year":"2007","journal-title":"Proc 10th Int Conf Elect Distrib"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2005.857386"},{"key":"ref45","year":"2013","journal-title":"Trench Group Switzerland"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2044899"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2053855"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2012.2194160"},{"key":"ref24","year":"2003","journal-title":"Testing and Measurement Techniques?General Guide on Harmonics and Interharmonics Measurements and Instrumentation for Power Supply Systems and Equipment Connected Thereto"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2012.2190690"},{"key":"ref23","year":"2008","journal-title":"Electromagnetic Compatibility (EMC)?Part 4-30 Testing and Measurement Techniques?Power Quality Measurement Methods"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2009.2036547"},{"key":"ref26","year":"2002","journal-title":"IEEE Recommended Practice for the Transfer of Power Quality Data"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1109\/IAS.2011.6074408"},{"key":"ref25","year":"2002","journal-title":"Testing and Measurement Techniques?Flickermeter?Functional and Design Specifications"}],"container-title":["IEEE Transactions on Instrumentation and Measurement"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/19\/6732955\/06612635.pdf?arnumber=6612635","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T16:31:47Z","timestamp":1642005107000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6612635\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,3]]},"references-count":45,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.1109\/tim.2013.2281556","relation":{},"ISSN":["0018-9456","1557-9662"],"issn-type":[{"value":"0018-9456","type":"print"},{"value":"1557-9662","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,3]]}}}