{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,17]],"date-time":"2026-02-17T12:18:39Z","timestamp":1771330719849,"version":"3.50.1"},"reference-count":28,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"10","license":[{"start":{"date-parts":[[2018,10,1]],"date-time":"2018-10-01T00:00:00Z","timestamp":1538352000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Instrum. Meas."],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1109\/tim.2018.2816798","type":"journal-article","created":{"date-parts":[[2018,4,3]],"date-time":"2018-04-03T18:49:29Z","timestamp":1522781369000},"page":"2444-2452","source":"Crossref","is-referenced-by-count":11,"title":["Uncertainty Analysis of an Equivalent Synchronization Method for Phasor Measurements"],"prefix":"10.1109","volume":"67","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1739-1277","authenticated-orcid":false,"given":"Alessandro","family":"Mingotti","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3407-2056","authenticated-orcid":false,"given":"Lorenzo","family":"Peretto","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5377-2421","authenticated-orcid":false,"given":"Roberto","family":"Tinarelli","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.2002858"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/61.484009"},{"key":"ref12","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1109\/61.484009","article-title":"Unsynchronized two-terminal fault location estimation","volume":"11","author":"girgis","year":"1996","journal-title":"IEEE Trans Power Del"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2011.2159548"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2005.858778"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2008.4596638"},{"key":"ref16","first-page":"101","article-title":"An equivalent synchronization for phasor measurements in power networks","author":"mingotti","year":"2017","journal-title":"Proc IEEE AMPS"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2017.2779328"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2008.928872"},{"key":"ref19","first-page":"95","article-title":"Metrological characterization of a distributed measurement system to locate faults in power networks","author":"peretto","year":"2007","journal-title":"Proc IEEE Instrum Meas Technol Conf"},{"key":"ref28","year":"2011","journal-title":"Instrument Transformers - Part 3 Additional Requirements for Inductive Voltage Transformers"},{"key":"ref4","year":"2013"},{"key":"ref27","year":"2011","journal-title":"Instrument Transformers&#x2014;Part 2 Additional Requirements for Current Transformers"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/IEEESTD.2008.4579760"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2009.2019319"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2014.2323137"},{"key":"ref8","first-page":"1","article-title":"A novel equivalent power network impedance approach for assessing the time reference in asynchronous measurements","author":"mingotti","year":"2017","journal-title":"Proc IEEE IMTC"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2017.2657938"},{"key":"ref2","author":"monti","year":"2016","journal-title":"Phasor Measurement Units and Wide Area Monitoring Systems From the sensor to the systems"},{"key":"ref9","first-page":"1","article-title":"Distribution system state estimation using unsynchronized phasor measurements","author":"janssen","year":"2012","journal-title":"Proc IEEE ISGT Eur"},{"key":"ref1","year":"2018","journal-title":"International Electrotechnical Vocabulary"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2004.831462"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/MIM.2010.5585070"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2006.880954"},{"key":"ref24","year":"2016","journal-title":"Fault Detection and Power Meter&#x2014;Specifications and Test Methods"},{"key":"ref23","year":"2017","journal-title":"Instrument transformers - Part 10 Additional requirements for low-power passive current transformers"},{"key":"ref26","year":"2008","journal-title":"Evaluation of Measurement Data&#x2014;Supplement 1 to the &#x2018;Guide to the Expression of Uncertainty in Measurement&#x2019;&#x2014;Propagation of Distributions Using a Monte Carlo Method"},{"key":"ref25","year":"2008","journal-title":"Uncertainty of Measurementpart3 Guide to the Expression of Uncertainty Measurement (GUM 1995)"}],"container-title":["IEEE Transactions on Instrumentation and Measurement"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/19\/8467399\/08330059.pdf?arnumber=8330059","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T16:10:01Z","timestamp":1642003801000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8330059\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10]]},"references-count":28,"journal-issue":{"issue":"10"},"URL":"https:\/\/doi.org\/10.1109\/tim.2018.2816798","relation":{},"ISSN":["0018-9456","1557-9662"],"issn-type":[{"value":"0018-9456","type":"print"},{"value":"1557-9662","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,10]]}}}