{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T19:26:05Z","timestamp":1774466765009,"version":"3.50.1"},"reference-count":17,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"10","license":[{"start":{"date-parts":[[2018,10,1]],"date-time":"2018-10-01T00:00:00Z","timestamp":1538352000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"funder":[{"name":"European Metrology Programme for Innovation and Research co-financed by the Participating States"},{"name":"European Union\u2019s Horizon 2020 Research and Innovation Programme"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Instrum. Meas."],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1109\/tim.2018.2843098","type":"journal-article","created":{"date-parts":[[2018,6,21]],"date-time":"2018-06-21T18:48:04Z","timestamp":1529606884000},"page":"2453-2462","source":"Crossref","is-referenced-by-count":63,"title":["Utilization of PMU Measurements for Three-Phase Line Parameter Estimation in Power Systems"],"prefix":"10.1109","volume":"67","author":[{"given":"Vladimir","family":"Milojevic","sequence":"first","affiliation":[]},{"given":"Srdan","family":"Calija","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5239-4019","authenticated-orcid":false,"given":"Gert","family":"Rietveld","sequence":"additional","affiliation":[]},{"given":"Milos V.","family":"Acanski","sequence":"additional","affiliation":[]},{"given":"Daniele","family":"Colangelo","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1002\/0470010940"},{"key":"ref11","year":"2010","journal-title":"Electromagnetic Compatibility (EMC)&#x2014;Part 3-13 Limits-Assessment of Emission Limits for the Connection of Unbalanced Installations to MV HV and EHV Power Systems"},{"key":"ref12","year":"2014","journal-title":"Model 1133A Power Sentinel GPS&#x2013;Synchronized Power Quality Revenue Standard-Operation Manual"},{"key":"ref13","first-page":"1","article-title":"A robust synchrophasor-based method for determining three-phase line impedance","author":"milojevic","year":"2017","journal-title":"Proc IEEE Int Workshop Appl Meas Power Syst (AMPS)"},{"key":"ref14","article-title":"Evaluation results for PMUs tested in power grid conditions","author":"milojevic","year":"2013"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/PCT.2007.4538401"},{"key":"ref16","year":"2018","journal-title":"Map of the Swedish National Electricity Grid"},{"key":"ref17","year":"2018","journal-title":"On-Site Calibrations RISE"},{"key":"ref4","first-page":"1","article-title":"Identification of short transmission-line parameters from synchrophasor measurements","author":"shi","year":"2008","journal-title":"Proc North Am Power Symp (NAPS)"},{"key":"ref3","year":"0"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2016.2556920"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.2002875"},{"key":"ref8","first-page":"1","article-title":"Live line mesasurement of untransposed three phase transmission line parameters for relay settings","author":"kato","year":"2010","journal-title":"Proc IEEE Power Energy Soc Gen Meeting"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2016.0830"},{"key":"ref2","first-page":"406","article-title":"On three-phase state estimation in the presence of GPS-synchronized phasor measurements","author":"stefopoulos","year":"2007","journal-title":"Proc 39th North Amer Power Symp"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2299756"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1002\/etep.522"}],"container-title":["IEEE Transactions on Instrumentation and Measurement"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/19\/8467399\/08392432.pdf?arnumber=8392432","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T16:10:01Z","timestamp":1642003801000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8392432\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10]]},"references-count":17,"journal-issue":{"issue":"10"},"URL":"https:\/\/doi.org\/10.1109\/tim.2018.2843098","relation":{},"ISSN":["0018-9456","1557-9662"],"issn-type":[{"value":"0018-9456","type":"print"},{"value":"1557-9662","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,10]]}}}