{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,24]],"date-time":"2026-01-24T13:57:34Z","timestamp":1769263054920,"version":"3.49.0"},"reference-count":23,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"3","license":[{"start":{"date-parts":[[2013,9,1]],"date-time":"2013-09-01T00:00:00Z","timestamp":1377993600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Smart Grid"],"published-print":{"date-parts":[[2013,9]]},"DOI":"10.1109\/tsg.2013.2249597","type":"journal-article","created":{"date-parts":[[2013,4,12]],"date-time":"2013-04-12T18:02:38Z","timestamp":1365789758000},"page":"1656-1664","source":"Crossref","is-referenced-by-count":26,"title":["Power Flow Controlling Devices as a Smart and Independent Grid Investment for Flexible Grid Operations: Belgian Case Study"],"prefix":"10.1109","volume":"4","author":[{"given":"Dirk","family":"Van Hertem","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Johan","family":"Rimez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ronnie","family":"Belmans","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","article-title":"Grid implementation and operational use of large phase shifting transformers in the belgian hv grid to cope with international network challenges","author":"warichet","year":"2010","journal-title":"Proc Cigr Session"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2011.6019240"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/MPE.2012.2205318"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/IREP.2010.5563278"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2030423"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2007.913197"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/IREP.2010.5563276"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2012.6254746"},{"key":"ref18","year":"2012","journal-title":"?Influence of embedded HVDC on system security and AC network performance?"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2002.807068"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/FPS.2005.204217"},{"key":"ref3","author":"van hertem","year":"2009","journal-title":"The Use of Power Flow Controlling Devices in the Liberalized Market"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2010.0961"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/PCT.2007.4538303"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/PCT.2007.4538510"},{"key":"ref7","year":"2011","journal-title":"Federaal Ontwikkelingsplan 2010?2020 (Federal Development Plan 2010?2020)"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2011.01.012"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/FPS.2005.204232"},{"key":"ref9","article-title":"Grid implementation of a 400 MVA 220\/150 kV <formula formulatype=\"inline\"><tex Notation=\"TeX\">${-}15^\\circ\/+3^\\circ$<\/tex> <\/formula> phase shifting transformer for power flow control in the Belgian network: Specification and operational considerations","author":"rimez","year":"0","journal-title":"Proc Cigr\ufffd Sessions 2006"},{"key":"ref20","article-title":"Phase shifting transformers installed in the Netherlands in order to increase available international transmission capacity","author":"kling","year":"0","journal-title":"Proc CIGR 2004"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2009.5207176"},{"key":"ref21","author":"zhang","year":"2006","journal-title":"Flexible AC Transmission Systems Modelling and Control"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2011.6039693"}],"container-title":["IEEE Transactions on Smart Grid"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/5165411\/6584008\/06497544.pdf?arnumber=6497544","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,29]],"date-time":"2021-11-29T20:55:21Z","timestamp":1638219321000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6497544\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,9]]},"references-count":23,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.1109\/tsg.2013.2249597","relation":{},"ISSN":["1949-3053","1949-3061"],"issn-type":[{"value":"1949-3053","type":"print"},{"value":"1949-3061","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,9]]}}}