{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T16:25:39Z","timestamp":1778862339131,"version":"3.51.4"},"reference-count":30,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"2","license":[{"start":{"date-parts":[[2015,3,1]],"date-time":"2015-03-01T00:00:00Z","timestamp":1425168000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"},{"start":{"date-parts":[[2015,3,1]],"date-time":"2015-03-01T00:00:00Z","timestamp":1425168000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2015,3,1]],"date-time":"2015-03-01T00:00:00Z","timestamp":1425168000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"funder":[{"DOI":"10.13039\/100000001","name":"National Science Foundation","doi-asserted-by":"publisher","award":["CMMI-1434771"],"award-info":[{"award-number":["CMMI-1434771"]}],"id":[{"id":"10.13039\/100000001","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/100000001","name":"National Science Foundation","doi-asserted-by":"publisher","award":["CMMI-1434789"],"award-info":[{"award-number":["CMMI-1434789"]}],"id":[{"id":"10.13039\/100000001","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Electric Power Analytics Consortium"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Smart Grid"],"published-print":{"date-parts":[[2015,3]]},"DOI":"10.1109\/tsg.2015.2388736","type":"journal-article","created":{"date-parts":[[2015,1,26]],"date-time":"2015-01-26T19:34:13Z","timestamp":1422300853000},"page":"1046-1054","source":"Crossref","is-referenced-by-count":171,"title":["Stochastic Pre-hurricane Restoration Planning for Electric Power Systems Infrastructure"],"prefix":"10.1109","volume":"6","author":[{"given":"Ali","family":"Arab","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, University of Houston, Houston, TX, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Amin","family":"Khodaei","sequence":"additional","affiliation":[{"name":"Department of Electrical and Computer Engineering, University of Denver, Denver, CO, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Suresh K.","family":"Khator","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, University of Houston, Houston, TX, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kevin","family":"Ding","sequence":"additional","affiliation":[{"name":"CenterPoint Energy, Inc., Houston, TX, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Valentine A.","family":"Emesih","sequence":"additional","affiliation":[{"name":"CenterPoint Energy, Inc., Houston, TX, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhu","family":"Han","sequence":"additional","affiliation":[{"name":"Department of Electrical and Computer Engineering, University of Houston, Houston, TX, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref30","year":"2013","journal-title":"U S Energy Information Administration"},{"key":"ref10","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1109\/JSYST.2009.2017396","article-title":"Methodology for assessing the resilience of networked infrastructure","volume":"3","author":"dorothy","year":"2009","journal-title":"IEEE Syst J"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2007.907587"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1076-0342(2005)11:4(258)"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1111\/j.1539-6924.2010.01510.x"},{"key":"ref14","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1109\/17.658661","article-title":"Repair-unit location models for power failures","volume":"45","author":"yao","year":"1998","journal-title":"IEEE Trans Eng Manage"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2011.6039414"},{"key":"ref16","first-page":"308","article-title":"Service restoration with consideration of rush repair","author":"yongbo","year":"2011","journal-title":"Proc Power Eng Auto Conf (PEAM)"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00803-2"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2004.1372741"},{"key":"ref19","first-page":"1","article-title":"Post-hurricane transmission network outage management","author":"arab","year":"2013","journal-title":"Proc IEEE Great Lakes Symp Smart Grid New Energy Econ"},{"key":"ref28","author":"kalvelagen","year":"2013","journal-title":"Benders decomposition with GAMS"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2010.2047034"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1023\/A:1021805924152"},{"key":"ref3","first-page":"21","article-title":"Rebuilding electrical infrastructure along the Gulf Coast: A case study","volume":"36","author":"ball","year":"2006","journal-title":"Bridge Washington Nat Acad Eng"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2013.01.016"},{"key":"ref29","year":"2013","journal-title":"Estimating the Value of Lost Load Briefing Paper Prepared for the ERCOT by LEI"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1002\/eqe.623"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.apgeog.2011.08.001"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2012.09.009"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/59.630455"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/s11069-010-9672-9"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2009.11.002"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/SmartGridComm.2014.7007627"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/0167-6377(93)90002-X"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-7729-8"},{"key":"ref24","author":"birge","year":"1997","journal-title":"Introduction to Stochastic Programming"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.876672"},{"key":"ref26","doi-asserted-by":"crossref","DOI":"10.2172\/573301","article-title":"A users guide to LHS: Sandias Latin hypercube sampling software","author":"wyss","year":"1998"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.2307\/1268522"}],"container-title":["IEEE Transactions on Smart Grid"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/5165411\/7042857\/07021963.pdf?arnumber=7021963","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T17:55:34Z","timestamp":1725472534000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/7021963\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3]]},"references-count":30,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.1109\/tsg.2015.2388736","relation":{},"ISSN":["1949-3053","1949-3061"],"issn-type":[{"value":"1949-3053","type":"print"},{"value":"1949-3061","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3]]}}}