{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,5]],"date-time":"2026-04-05T20:42:53Z","timestamp":1775421773583,"version":"3.50.1"},"reference-count":41,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"5","license":[{"start":{"date-parts":[[2021,9,1]],"date-time":"2021-09-01T00:00:00Z","timestamp":1630454400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100000266","name":"Engineering and Physical Sciences Research Council (EPSRC), U.K","doi-asserted-by":"publisher","award":["EP\/N001974\/1 (MY-STORE)"],"award-info":[{"award-number":["EP\/N001974\/1 (MY-STORE)"]}],"id":[{"id":"10.13039\/501100000266","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/100009465","name":"Corporaci\u00f3n de Fomento de la Producci\u00f3n (CORFO), Chile","doi-asserted-by":"publisher","award":["14ENI2-26865"],"award-info":[{"award-number":["14ENI2-26865"]}],"id":[{"id":"10.13039\/100009465","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Smart Grid"],"published-print":{"date-parts":[[2021,9]]},"DOI":"10.1109\/tsg.2021.3081371","type":"journal-article","created":{"date-parts":[[2021,5,17]],"date-time":"2021-05-17T21:21:03Z","timestamp":1621286463000},"page":"3877-3888","source":"Crossref","is-referenced-by-count":106,"title":["Ensuring Distribution Network Integrity Using Dynamic Operating Limits for Prosumers"],"prefix":"10.1109","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1839-0065","authenticated-orcid":false,"given":"Kyriacos","family":"Petrou","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3807-7164","authenticated-orcid":false,"given":"Andreas T.","family":"Procopiou","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7605-9250","authenticated-orcid":false,"given":"Luis","family":"Gutierrez-Lagos","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9609-4544","authenticated-orcid":false,"given":"Michael Z.","family":"Liu","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7853-4286","authenticated-orcid":false,"given":"Luis F.","family":"Ochoa","sequence":"additional","affiliation":[]},{"given":"Tom","family":"Langstaff","sequence":"additional","affiliation":[]},{"given":"John M.","family":"Theunissen","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref39","author":"gonz\u00e1lez","year":"2017","journal-title":"D3 4&#x2013;Demonstration Results Evaluation and Opportunities"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1049\/iet-stg.2018.0291"},{"key":"ref33","author":"seneviratne","year":"2014","journal-title":"Information Electrical design information for distribution networks After diversity maximum demand"},{"key":"ref32","author":"seneviratne","year":"2013","journal-title":"Distribution Design Manual&#x2013;Underground Cable Distribution"},{"key":"ref31","article-title":"Distribution annual planning report 2017&#x2013;2021","author":"bridge","year":"2016"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2018.2889843"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2020.106705"},{"key":"ref36","year":"2018","journal-title":"Victoria Wholesale Prices"},{"key":"ref35","author":"jehad","year":"2012","journal-title":"Electrical Design Standard for Underground Distribution Cable Networks"},{"key":"ref34","year":"2009","journal-title":"Distribution Substation Manual (DSM) Section 1 - Customer Supply Arrangements"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2175254"},{"key":"ref40","year":"2020","journal-title":"Smart Meters"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2627139"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2019.2907128"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2019.2895527"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2018.2862149"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2710481"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.2172\/1476449"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2015.09.011"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2019.2894795"},{"key":"ref19","article-title":"Annual report 2018&#x2013;19","year":"2019"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2011.6039829"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2518084"},{"key":"ref27","year":"2015","journal-title":"Electricity Distribution Code"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2741920"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2017.7982021"},{"key":"ref29","year":"2018","journal-title":"Victoria Energy Pricing"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2016.7521296"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2359977"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2767632"},{"key":"ref2","author":"bridge","year":"2017","journal-title":"Export Limits for Embedded Generators up to 200 kVA Connected at Low Voltage"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2017.08.136"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2019.8810955"},{"key":"ref20","article-title":"Virtual power plant in South Australia&#x2014;Stage 1 & 2 reports","year":"2018"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/ISGT-LA.2019.8895008"},{"key":"ref21","article-title":"Simply energy VPPX ARENA stage 1 knowledge sharing report","year":"2019"},{"key":"ref24","year":"2019","journal-title":"AIMMS&#x2014;Language Reference"},{"key":"ref41","year":"2020","journal-title":"SA Virtual Power Plant&#x2014;FAQs"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2017.2665559"},{"key":"ref26","author":"kwon","year":"2006","journal-title":"Receding Horizon Control Model Predictive Control for State Models"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1109\/ISGT-LA.2019.8895319"}],"container-title":["IEEE Transactions on Smart Grid"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/5165411\/9519817\/09432974.pdf?arnumber=9432974","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T20:02:31Z","timestamp":1639771351000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9432974\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9]]},"references-count":41,"journal-issue":{"issue":"5"},"URL":"https:\/\/doi.org\/10.1109\/tsg.2021.3081371","relation":{},"ISSN":["1949-3053","1949-3061"],"issn-type":[{"value":"1949-3053","type":"print"},{"value":"1949-3061","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,9]]}}}