{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,10]],"date-time":"2025-12-10T08:34:49Z","timestamp":1765355689974},"reference-count":73,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"1","license":[{"start":{"date-parts":[[2013,1,1]],"date-time":"2013-01-01T00:00:00Z","timestamp":1356998400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Trans. Veh. Technol."],"published-print":{"date-parts":[[2013,1]]},"DOI":"10.1109\/tvt.2012.2207138","type":"journal-article","created":{"date-parts":[[2013,1,11]],"date-time":"2013-01-11T19:09:03Z","timestamp":1357931343000},"page":"182-191","source":"Crossref","is-referenced-by-count":57,"title":["Survey on the Future Aeronautical Communication System and Its Development for Continental Communications"],"prefix":"10.1109","volume":"62","author":[{"given":"Najett","family":"Neji","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Raul","family":"de Lacerda","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alain","family":"Azoulay","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Thierry","family":"Letertre","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Olivier","family":"Outtier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref73","year":"2010","journal-title":"Results of studies of the AM(R)S allocation in the band 960-1 164 MHz and of the AMS(R)S allocation in the band 5 030-5 091 MHz to support control and non-payload communications links for unmanned aircraft systems"},{"key":"ref72","author":"bastide","year":"2004","journal-title":"Analysis of the feasibility and interests of Galileo E5a\/E5b and GPS L5 signals for U se with civil aviation"},{"key":"ref71","year":"2007","journal-title":"Annex 10 to the Convention of International Civil Aviation Volume 4 Surveillance and Collision Avoidance Systems"},{"key":"ref70","year":"2007","journal-title":"Annex 10 to the Convention of International Civil Aviation Volume 3 Communication Systems"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1109\/TCOM.1981.1095089"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1016\/j.comnet.2006.12.009"},{"key":"ref33","author":"schnell","year":"2007","journal-title":"Future communications infrastructureStep 2 Technology assessment results"},{"key":"ref32","author":"schnell","year":"2006","journal-title":"Future communications infrastructureStep 1"},{"key":"ref31","author":"gilbert","year":"2006","journal-title":"FCS phase IIIdentification of technologies for provision of future aeronautical communications"},{"key":"ref30","author":"nagaoka","year":"2008","journal-title":"Long-term vision of ENRI's research and development"},{"key":"ref37","year":"2007","journal-title":"Use of the band 960-1164 MHz by the aeronautical mobile (R) service"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1109\/AERO.2011.5747378"},{"key":"ref35","article-title":"Aero Wimax","author":"barba","year":"2008","journal-title":"Selex CommunicationsAdvanced Solutions Technologies Department"},{"key":"ref34","author":"lommaert","year":"2009","journal-title":"IEEE802 16 System Profile Analysis for FCI's Airport Surface Operation"},{"key":"ref60","author":"yalin","year":"2009","journal-title":"Conception d'un outil d'analyse de compatibilit radiolectrique pour valuer la performance des systmes multi formes d'onde"},{"key":"ref62","doi-asserted-by":"publisher","DOI":"10.1109\/DASC.2008.4702777"},{"key":"ref61","author":"brandes","year":"2009","journal-title":"Suppression of mutual interference in OFDM based overlay systems"},{"key":"ref63","doi-asserted-by":"publisher","DOI":"10.1109\/DASC.2009.5347500"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/ICNSURV.2009.5172851"},{"key":"ref64","doi-asserted-by":"publisher","DOI":"10.1109\/GLOCOM.2009.5426056"},{"key":"ref27","year":"0","journal-title":"NEWSKY Project Website"},{"key":"ref65","year":"2007","journal-title":"Guidelines for AM(R)S sharing studies in the 960-1 164 MHz band"},{"key":"ref66","year":"2009","journal-title":"Manual on the Universal Access Transceiver"},{"key":"ref29","author":"sumiya","year":"2010","journal-title":"Agenda item 2 Future communication infrastructure progress update and recommendations status of air-ground datalink study in ENRI\/Japan"},{"key":"ref67","year":"2001","journal-title":"Integrity Monitor for TCAS Mutual Suppression"},{"key":"ref68","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C7 Assessment on the potential use of the onboard suppression bus for L-DACS operation"},{"key":"ref69","year":"2009","journal-title":"Annex 10 to the Convention of International Civil Aviation Volume 1 Radio Navigation Aids"},{"key":"ref2","year":"2006","journal-title":"Radiotlphonie"},{"key":"ref1","first-page":"1","year":"1948","journal-title":"Convention on International Civil AviationAnnexes 1 to 18"},{"key":"ref20","article-title":"Future aeronautical communications concepts and their impact on ATM procedures","author":"sajatovic","year":"2005","journal-title":"Proc ATCA Conf"},{"key":"ref22","author":"sajatovic","year":"2009","journal-title":"L-DACS1 system definition proposal Deliverable D3Design specifications for L-DACS1 prototype"},{"key":"ref21","year":"2007","journal-title":"Future communications infrastructureTechnology investigations Description of AMACS"},{"key":"ref24","year":"2010","journal-title":"AM(R)S sharing feasibility in the 960-1164 MHz bandPreliminary draft new report ITU-R M"},{"key":"ref23","author":"fistas","year":"2009","journal-title":"L-DACS2 transmitter and receiver prototype equipment specifications Deliverable D3"},{"key":"ref26","author":"schtz","year":"2003","journal-title":"Radio frequency spectrum requirement calculations for future aeronautical mobile (Route) system AM(R)S"},{"key":"ref25","article-title":"Spectral efficient COMmunications for future aeronautical services (SECOMAS)","author":"hakegard","year":"2007","journal-title":"Proc VERDIKT"},{"key":"ref50","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C6 and S6 Compatibility criteria (C6) and interference scenarios (S6) for RSBN"},{"key":"ref51","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C3 Compatibility Criteria and Test Specification for SSR Systems"},{"key":"ref59","doi-asserted-by":"publisher","DOI":"10.1109\/PIMRC.2009.5450049"},{"key":"ref58","first-page":"243","article-title":"Radioelectric compatibility of the future aeronautical communication system","author":"neji","year":"2009","journal-title":"Proc Int Conf ITS Telecommun"},{"key":"ref57","year":"1997","journal-title":"Report on Co-Frequency Co-Coverage Sharing Issues Between Two CDMA Systems"},{"key":"ref56","year":"2010","journal-title":"Report 42 Compatibility between UMTS and existing and planned aeronautical systems above 960 MHz"},{"key":"ref55","year":"2010","journal-title":"Report 41 Compatibility between LTE and WiMAX operating within the bands 880-915 MHz\/925-960 MHz and 1710-1785 MHz\/1805-1880 MHz (900\/1800 MHz bands) and systems operating in adjacent bands"},{"key":"ref54","year":"2010","journal-title":"Report 146 Compatibility studies between GSM MCBTS and other services (TRR RSBN\/PRMG HC-SDMA GSM-R DME MIDS DECT) operating in the 900 and 1800 MHz frequency bands"},{"key":"ref53","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverables S1-S7 L-band interference scenarios"},{"key":"ref52","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C2 Compatibility criteria and test specification for UAT"},{"key":"ref10","year":"2007","journal-title":"State of progress with the project to implement the new generation European Air Traffic Management System (SESAR)"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ICNSURV.2008.4559172"},{"key":"ref40","year":"2007","journal-title":"Methodology for assessing the maximum aggregate equivalent power flux-density at an aeronautical radionavigation service station from all radionavigation-satellite service systems operating in the 11641215 MHz band"},{"key":"ref12","first-page":"1","article-title":"Technology assessment results of the Eurocontrol\/FAA future communication study","author":"kerczewski","year":"2006","journal-title":"Proc IEEE Aerosp Conf"},{"key":"ref13","year":"2007","journal-title":"Future communications infrastructureStep 2 Technology assessment results"},{"key":"ref14","year":"2005","journal-title":"Technology assessment for the future aeronautical communications system"},{"key":"ref15","author":"schtz","year":"2007","journal-title":"Action plan 17Future communication study Final conclusions and recommendations report"},{"key":"ref16","author":"sajatovic","year":"2009","journal-title":"L-DACS1 system definition proposal Deliverable D2"},{"key":"ref17","year":"2007","journal-title":"B-AMC operating concept and deployment scenariosDeliverable 2 2"},{"key":"ref18","year":"2007","journal-title":"FCI technology investigationsP34 An overview"},{"key":"ref19","author":"fistas","year":"2009","journal-title":"L-DACS2 system definition proposal Deliverable D2"},{"key":"ref4","year":"2006","journal-title":"Future communications infrastructureTechnology investigations evaluation scenarios"},{"key":"ref3","year":"2011","journal-title":"Medium-term forecast IFR flight movements 20112017"},{"key":"ref6","author":"van den boogaard","year":"2003","journal-title":"Agenda Item 2 Future Air\/Ground Data Link SystemsThe IATA Position On the Use of 8 33 kHz"},{"key":"ref5","year":"2007","journal-title":"Communications Operating Concept and Requirements for the Future Radio System"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/DASC.2004.1391252"},{"key":"ref7","article-title":"B-VHF, A multi-carrier broadband communications concept for air traffic management in the VHF band","author":"haindl","year":"2004","journal-title":"Proc ICNS Conf"},{"key":"ref49","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C4 Compatibility criteria and test specification for GSM\/UMTS900"},{"key":"ref9","year":"2004","journal-title":"Next generation air transportation systemIntegrated plan"},{"key":"ref46","doi-asserted-by":"publisher","DOI":"10.1109\/VETECF.2010.5594447"},{"key":"ref45","first-page":"1","article-title":"How the aeronautical L-DACS2 radio-frequency signals modulation affects the DME system performance","author":"neji","year":"2010","journal-title":"Proc IEEE Veh Technol Conf"},{"key":"ref48","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C5 Compatibility criteria and test specification for GNSS"},{"key":"ref47","author":"micallef","year":"2009","journal-title":"FCI technology investigations L band compatibility criteria and interference scenarios studyDeliverable C1 Compatibility criteria and test specification for DME"},{"key":"ref42","year":"2011","journal-title":"Unwanted Emissions in the Spurious Domain"},{"key":"ref41","year":"2007","journal-title":"Reference radiation patterns of omnidirectional sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 GHz to about 70 GHz"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/ICNSURV.2010.5503324"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1109\/DASC.2010.5655355"}],"container-title":["IEEE Transactions on Vehicular Technology"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/25\/6410063\/06232469.pdf?arnumber=6232469","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,29]],"date-time":"2021-11-29T20:55:32Z","timestamp":1638219332000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6232469\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,1]]},"references-count":73,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.1109\/tvt.2012.2207138","relation":{},"ISSN":["0018-9545","1939-9359"],"issn-type":[{"value":"0018-9545","type":"print"},{"value":"1939-9359","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1]]}}}