{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T16:39:37Z","timestamp":1730306377714,"version":"3.28.0"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1109\/wsc.2002.1166370","type":"proceedings-article","created":{"date-parts":[[2003,6,25]],"date-time":"2003-06-25T21:03:42Z","timestamp":1056575022000},"page":"1138-1141","source":"Crossref","is-referenced-by-count":2,"title":["An approach and interface for building generic manufacturing Kanban-systems models"],"prefix":"10.1109","volume":"2","author":[{"given":"E.J.","family":"Williams","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"O.M.","family":"Ulgen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C.","family":"DeWitt","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"Modellierung Simulation und Optimierung","year":"2001","author":"krug","key":"ref10"},{"journal-title":"Ergonomics in Industrial Design","year":"2000","author":"konz","key":"ref11"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1145\/324138.324151"},{"key":"ref13","first-page":"9.63","author":"monden","year":"2001","journal-title":"Just-In-Time and Kanban Scheduling In Maynard'sIndustrial Engineering Handbook"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1145\/256562.256746"},{"journal-title":"Gesch&#x00E4;ftsprozesssimulation von Supply Chains","year":"2001","author":"von","key":"ref15"},{"key":"ref4","first-page":"30","article-title":"Facilities design for lean manufacturing","volume":"30","author":"duggan","year":"1998","journal-title":"IIE Solutions"},{"key":"ref3","first-page":"43","article-title":"Eleven-step recovery plan","volume":"34","author":"cary","year":"2002","journal-title":"IIE Solutions"},{"key":"ref6","first-page":"36","article-title":"Better mousetrap bites dog","volume":"6","author":"hartwig","year":"2001","journal-title":"Desktop Eng"},{"key":"ref5","first-page":"77","article-title":"Making safety a priority at the dock","volume":"55","author":"feare","year":"2000","journal-title":"Modern Materials Handling"},{"key":"ref8","first-page":"429","article-title":"Simulation in German industry-a survey","author":"hirschberg","year":"1997","journal-title":"Proceedings of the 9th European Simulation Symposium ESS97"},{"article-title":"Operations management","year":"2001","author":"heizer","key":"ref7"},{"key":"ref2","first-page":"17","article-title":"Effect of new technology in managing manufacturing","author":"banerjee","year":"2000","journal-title":"Proceedings of the Second International Conference on Simulation Gaming Training and Business Process Reengineering in Operations"},{"journal-title":"Design and Analysis of Lean Production Systems","year":"2002","author":"askin","key":"ref1"},{"journal-title":"Factory Physics","year":"2001","author":"hopp","key":"ref9"}],"event":{"name":"2002 Winter Simulation Conference","acronym":"WSC-02","location":"San Diego, CA, USA"},"container-title":["Proceedings of the Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/8343\/26292\/01166370.pdf?arnumber=1166370","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,13]],"date-time":"2017-03-13T18:28:28Z","timestamp":1489429708000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/1166370\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/wsc.2002.1166370","relation":{},"subject":[]}}