{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T22:34:03Z","timestamp":1777502043371,"version":"3.51.4"},"reference-count":29,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007,12]]},"DOI":"10.1109\/wsc.2007.4419850","type":"proceedings-article","created":{"date-parts":[[2008,1,4]],"date-time":"2008-01-04T21:05:18Z","timestamp":1199480718000},"page":"2159-2167","source":"Crossref","is-referenced-by-count":17,"title":["Flexible modeling of linear schedules for integrated mathematical analysis"],"prefix":"10.1109","author":[{"given":"Gunnar","family":"Lucko","sequence":"first","affiliation":[]}],"member":"263","reference":[{"key":"ref10","article-title":"Vorlesungen &#x00FC;ber Technische Mechanik. Dritter Band: Festigkeitslehre","author":"f\u00f6ppl","year":"1927"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(697)"},{"key":"ref12","first-page":"ps.08.1","article-title":"Let's scrap the precedence diagramming method","author":"glenwright","year":"2004","journal-title":"Transactions of the Association for the Advancement of Cost Engineering Annual Meeting"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:3(387)"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(263)"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(269)"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1984)110:2(222)"},{"key":"ref17","first-page":"58","article-title":"Computers and operations research in road building","author":"kelley","year":"1957","journal-title":"Operations Research"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1145\/1460299.1460318"},{"key":"ref19","article-title":"A Reconciliation between Two Competing Methods of CPM Calculations","author":"lucko","year":"2006","journal-title":"Proceedings of the 3rd Project Management Institute College of Scheduling Annual Conference"},{"key":"ref28","first-page":"32","article-title":"Linear scheduling and visualization","volume":"1351","author":"vorster","year":"1992","journal-title":"Transportation Research Record"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(99)00079-4"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:4(875)"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:3(411)"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1061\/JCCEAZ.0000905","article-title":"Construction planning &#x2013; beyond the critical path","volume":"106","author":"birrell","year":"1980","journal-title":"Journal of the Construction Division Proceedings of the American Society of Civil Engineers"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.2514\/3.2849"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:6(545)"},{"key":"ref8","article-title":"Construction project management","author":"clough","year":"1979"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:4(476)"},{"key":"ref2","article-title":"Optimizing the graphical arrangement of network construction schedules","author":"anton","year":"2007","journal-title":"Proceedings of the Construction Research Congress"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1080\/014461998372213"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1990)116:4(689)"},{"key":"ref20","first-page":"129","article-title":"Note on the deflection of beams","volume":"48","author":"macaulay","year":"1919","journal-title":"Messenger of Mathematics"},{"key":"ref22","article-title":"Construction project scheduling and control","author":"mubarak","year":"2005"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:1(56)"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1988)114:1(36)"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(316)"},{"key":"ref26","first-page":"445","article-title":"Time space scheduling method","volume":"108","author":"stradal","year":"1982","journal-title":"Journal of Construction Engineering and Management"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1061\/JCCEAZ.0000877","article-title":"Construction planning for linear projects","volume":"106","author":"selinger","year":"1980","journal-title":"Journal of the Construction Division Proceedings of the American Society of Civil Engineers"}],"event":{"name":"2007 Winter Simulation Conference","location":"Washington, DC, USA","start":{"date-parts":[[2007,12,9]]},"end":{"date-parts":[[2007,12,12]]}},"container-title":["2007 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4419575\/4419576\/04419850.pdf?arnumber=4419850","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,9,1]],"date-time":"2021-09-01T01:54:30Z","timestamp":1630461270000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/4419850\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,12]]},"references-count":29,"URL":"https:\/\/doi.org\/10.1109\/wsc.2007.4419850","relation":{},"subject":[],"published":{"date-parts":[[2007,12]]}}}