{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,9]],"date-time":"2026-03-09T21:39:06Z","timestamp":1773092346318,"version":"3.50.1"},"reference-count":28,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1109\/wsc.2008.4736259","type":"proceedings-article","created":{"date-parts":[[2009,1,14]],"date-time":"2009-01-14T13:48:38Z","timestamp":1231940918000},"page":"1727-1735","source":"Crossref","is-referenced-by-count":39,"title":["A methodology for input data management in discrete event simulation projects"],"prefix":"10.1109","author":[{"given":"Anders","family":"Skoogh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bjorn","family":"Johansson","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","author":"pidd","year":"1995","journal-title":"Computer Simulation in Management Science"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1016\/S0928-4869(99)00020-8"},{"key":"18","article-title":"time to failure and time to repair profiles identification","author":"perrica","year":"2008","journal-title":"Proceedings of the 5thFOODSIM conference"},{"key":"15","year":"1973","journal-title":"Methods-Time Measurement"},{"key":"16","author":"pegden","year":"1995","journal-title":"Introduction to Simulation Using SIMAN"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2004.1371299"},{"key":"14","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1108\/09576069710188760","article-title":"a methodology for data gathering and analysis in a logistics simulation project","volume":"8","author":"lehtonen","year":"1997","journal-title":"Integrated Manufacturing Systems"},{"key":"11","author":"law","year":"2007","journal-title":"Simulation Modeling & Analysis"},{"key":"12","article-title":"a pilot implementation of the core manufacturing simulation data information model","author":"lee","year":"2007","journal-title":"Proceedings of the Simulation Interoperability Standards Organization 2007 Fall Simulation Interoperability Workshop"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2001.977402"},{"key":"20","author":"pidd","year":"2003","journal-title":"Tools for Thinking Modelling in Management Science"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.1016\/S0928-4869(01)00055-6"},{"key":"23","author":"robinson","year":"2004","journal-title":"Simulation The Practice of Model Development and Use"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1995.478706"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574246"},{"key":"26","article-title":"time-consumption analysis of input data activities in discrete event simulation projects","author":"skoogh","year":"2007","journal-title":"Proceedings of the 2007 Swedish Production Symposium"},{"key":"27","year":"0"},{"key":"28","doi-asserted-by":"publisher","DOI":"10.1145\/256563.257080"},{"key":"3","author":"denscombe","year":"1998","journal-title":"The good research guide For smallscale social research projects"},{"key":"2","author":"boothroyd","year":"1989","journal-title":"Product Design for Assembly"},{"key":"10","author":"landsberger","year":"1958","journal-title":"Hawthorne Revisited"},{"key":"1","author":"banks","year":"2004","journal-title":"Discrete-Event System Simulation"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1016\/S0928-4869(01)00028-3"},{"key":"6","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1108\/02635570410525780","article-title":"strategies for the adaptation of erp systems","volume":"104","author":"ho","year":"2004","journal-title":"Industrial Management & Data Systems"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1990.129589"},{"key":"4","author":"ericsson","year":"2005","journal-title":"Diffusion of Discrete Event Simulation in Swedish Industry"},{"key":"9","author":"johansson","year":"2004","journal-title":"Produktivitetsfo?rba? ttring av manuella monteringsoperationer"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2003.1261564"}],"event":{"name":"2008 Winter Simulation Conference (WSC)","location":"Miami, FL, USA","start":{"date-parts":[[2008,12,7]]},"end":{"date-parts":[[2008,12,10]]}},"container-title":["2008 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4712635\/4736042\/04736259.pdf?arnumber=4736259","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,4]],"date-time":"2019-04-04T22:28:04Z","timestamp":1554416884000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/4736259\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/wsc.2008.4736259","relation":{},"subject":[],"published":{"date-parts":[[2008,12]]}}}