{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,30]],"date-time":"2026-06-30T23:36:32Z","timestamp":1782862592877,"version":"3.54.5"},"reference-count":40,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1109\/wsc.2008.4736263","type":"proceedings-article","created":{"date-parts":[[2009,1,14]],"date-time":"2009-01-14T18:48:38Z","timestamp":1231958918000},"page":"1752-1760","source":"Crossref","is-referenced-by-count":5,"title":["Mixed model assembly line balancing problem with fuzzy operation times and drifting operations"],"prefix":"10.1109","author":[{"family":"Weida Xu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"family":"Tianyuan Xiao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.1016\/S0020-0255(98)10015-4"},{"key":"35","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.30.1.85"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.2.3.261"},{"key":"36","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.41.3.485"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1111\/j.1540-5915.1994.tb01861.x"},{"key":"33","author":"scholl","year":"2007","journal-title":"Homepage for assembly line optimization research"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(86)90032-8"},{"key":"34","doi-asserted-by":"publisher","DOI":"10.1080\/00207549408957042"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.07.029"},{"key":"39","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1016\/S0377-2217(99)00198-8","article-title":"properties of a sequencing problem for a mixed model assembly line with conveyor stoppages","volume":"124","author":"zhao","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"13","first-page":"1369","article-title":"line balancing problems using a hopfield network","author":"hashimoto","year":"1994","journal-title":"Pro-ceeding of the 1994 Japan-US Symposium on Flexible Automation"},{"key":"14","first-page":"394","article-title":"assembly line balancing using the ranked positional weight technique","volume":"12","author":"helgeson","year":"1961","journal-title":"Journal of Industrial Engineering"},{"key":"37","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(95)00131-J"},{"key":"11","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1007\/s00170-004-2373-3","article-title":"a hybrid genetic algorithm approach to mixed-model assembly line balancing","volume":"28","author":"haq","year":"2006","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"38","doi-asserted-by":"publisher","DOI":"10.1002\/nav.20241"},{"key":"12","year":"0"},{"key":"21","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-7908-1781-2","author":"liu","year":"2002","journal-title":"Theory and Practice of Uncertain Programming"},{"key":"20","author":"liu","year":"1999","journal-title":"Uncertain Programming"},{"key":"40","doi-asserted-by":"publisher","DOI":"10.1002\/nav.10116"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-73165-8_5"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(96)00236-9"},{"key":"24","year":"0"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1080\/07408170108936804"},{"key":"26","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(97)00048-0"},{"key":"27","doi-asserted-by":"publisher","DOI":"10.1080\/002075498192454"},{"key":"28","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2005.07.003"},{"key":"29","doi-asserted-by":"publisher","DOI":"10.1080\/002075499190545"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2006.08.019"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1080\/00207546508919982"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(96)00277-X"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.6.2.161"},{"key":"30","first-page":"23","article-title":"a heuristic method of assembly line balancing for assumptions of constant or variable work element times","volume":"16","author":"moodie","year":"1965","journal-title":"Journal of Industrial Engineering"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(02)00145-4"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.35.4.459"},{"key":"32","doi-asserted-by":"publisher","DOI":"10.1080\/05695557308974905"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.01.055"},{"key":"31","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-006-0655-7"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.10.010"},{"key":"9","author":"gaither","year":"1999","journal-title":"Production and Operations Management"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.6.1.73"}],"event":{"name":"2008 Winter Simulation Conference (WSC)","location":"Miami, FL, USA","start":{"date-parts":[[2008,12,7]]},"end":{"date-parts":[[2008,12,10]]}},"container-title":["2008 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4712635\/4736042\/04736263.pdf?arnumber=4736263","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,5]],"date-time":"2019-04-05T02:29:35Z","timestamp":1554431375000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/4736263\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":40,"URL":"https:\/\/doi.org\/10.1109\/wsc.2008.4736263","relation":{},"subject":[],"published":{"date-parts":[[2008,12]]}}}