{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T16:45:45Z","timestamp":1730306745694,"version":"3.28.0"},"reference-count":28,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1109\/wsc.2008.4736265","type":"proceedings-article","created":{"date-parts":[[2009,1,14]],"date-time":"2009-01-14T13:48:38Z","timestamp":1231940918000},"page":"1768-1776","source":"Crossref","is-referenced-by-count":1,"title":["Advanced modeling of networked print production by use of XML-based job definition and job messaging communication"],"prefix":"10.1109","author":[{"given":"Wolfgang","family":"Kuehn","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"JDF Process Integration Technology Product Description","year":"2005","author":"ku?hn","key":"19"},{"key":"17","first-page":"45","article-title":"the logistics bench: scalable logistics simulation from the supply chain to the production process","volume":"34","author":"kapp","year":"2005","journal-title":"CIRP Journal of Manufacturing Systems"},{"key":"18","first-page":"393","article-title":"java-sim-an advanced discrete event simulation library","author":"ku?hn","year":"2002","journal-title":"Proceedings SCSC 2002 Summer Computer Simulation Conference"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(03)00034-4"},{"journal-title":"Print Shop Planning Optimizing Business Processes Through Simulation","year":"2008","author":"heidelberger druckmaschinen","key":"16"},{"key":"13","first-page":"50","article-title":"event simulation of supply chain networks dynamic detailing in the material flow simulator d3fact insight","author":"dangelmaier","year":"2006","journal-title":"Proceedings ESM European Simulation and Modelling Conference"},{"key":"14","article-title":"planning data preparation key requirement for automated simulation modeling","author":"fritz","year":"2006","journal-title":"CIRP International Seminar on Manufacturing Systems"},{"journal-title":"CIP4 2005d ICS Registry","year":"0","key":"11"},{"year":"0","key":"12"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1007\/1-4020-4617-0_29"},{"key":"20","doi-asserted-by":"publisher","DOI":"10.1016\/j.conengprac.2006.05.010"},{"key":"22","first-page":"299","article-title":"simulation of newspaper production processes-decision and management support tools","author":"nordqvist","year":"1996","journal-title":"TAGA 1996 Conference Proceedings"},{"key":"23","first-page":"187","article-title":"bringing the digital factory into reality-virtual manufacturing with real automation data","author":"schloegl","year":"2005","journal-title":"CARV International Conference on Changeable Agile Reconfigurable and Virtual Production"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)60720-3"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2004.1371434"},{"key":"26","doi-asserted-by":"publisher","DOI":"10.1016\/j.compind.2005.01.006"},{"key":"27","first-page":"391","article-title":"migration of the digital and virtual factory to reality","volume":"34","author":"westka?mper","year":"2005","journal-title":"CIRP Journal of Manufacturing Systems"},{"key":"28","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.cie.2004.07.010","article-title":"an object-oriented simulation framework for real-time control of automated flexible manufacturing systems","volume":"48","author":"yalcin","year":"2004","journal-title":"Computers & Industrial Engineering"},{"year":"0","key":"3"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/ISATP.2005.1511443"},{"year":"0","key":"10"},{"key":"1","first-page":"177","article-title":"evaluation of printing production in networks by means of computer simulation models","volume":"24","author":"ba?ck","year":"1997","journal-title":"Advances in Printing Science and Technology"},{"key":"7","first-page":"83","article-title":"a tool for testing compliance with cip4's interoperability conformance specifications","author":"buckwalter","year":"2005","journal-title":"Proceedings of 2005 International Conference on Digital Production Printing and Industrial Applications"},{"key":"6","first-page":"271","article-title":"a jdf-enabled workflow simulation tool","author":"buckwalter","year":"2005","journal-title":"Proceedings TAGA 2005 57th Annual Technical Conference"},{"year":"0","key":"5"},{"key":"4","first-page":"187","article-title":"handling of process and resource variants in the digital factory","volume":"34","author":"bley","year":"2005","journal-title":"CIRP Journal of Manufacturing Systems"},{"year":"0","key":"9"},{"year":"0","key":"8"}],"event":{"name":"2008 Winter Simulation Conference (WSC)","start":{"date-parts":[[2008,12,7]]},"location":"Miami, FL, USA","end":{"date-parts":[[2008,12,10]]}},"container-title":["2008 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4712635\/4736042\/04736265.pdf?arnumber=4736265","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,4]],"date-time":"2019-04-04T22:29:42Z","timestamp":1554416982000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/4736265\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/wsc.2008.4736265","relation":{},"subject":[],"published":{"date-parts":[[2008,12]]}}}