{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,7,8]],"date-time":"2025-07-08T05:12:14Z","timestamp":1751951534011,"version":"3.28.0"},"reference-count":11,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1109\/wsc.2008.4736300","type":"proceedings-article","created":{"date-parts":[[2009,1,14]],"date-time":"2009-01-14T13:48:38Z","timestamp":1231940918000},"page":"2041-2049","source":"Crossref","is-referenced-by-count":22,"title":["Simulations-based and solver-based optimization approaches for batch processes in semiconductor manufacturing"],"prefix":"10.1109","author":[{"given":"Andreas","family":"Klemmt","sequence":"first","affiliation":[]},{"given":"Sven","family":"Horn","sequence":"additional","affiliation":[]},{"given":"Gerald","family":"Weigert","sequence":"additional","affiliation":[]},{"given":"Thomas","family":"Hielscher","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"doi-asserted-by":"publisher","key":"3","DOI":"10.1007\/s00170-004-2296-z"},{"doi-asserted-by":"publisher","key":"2","DOI":"10.1109\/TEPM.2006.887355"},{"key":"10","article-title":"performance of a serial-batch processor system with incompatible job families under simple control policies","author":"tajan","year":"2006","journal-title":"Innovation in Manufacturing Systems and Technology (IMST)"},{"doi-asserted-by":"publisher","key":"1","DOI":"10.1109\/WSC.2000.899121"},{"key":"7","doi-asserted-by":"crossref","first-page":"2100","DOI":"10.1016\/j.ejor.2005.12.020","article-title":"genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops","volume":"177","author":"mo?nch","year":"2007","journal-title":"European Journal of Operation Research"},{"key":"6","article-title":"scheduling of batch processors in semiconductor manufacturing a review","author":"mathirajan","year":"2003","journal-title":"Innovation in Manufacturing Systems and Technology (IMST)"},{"key":"5","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.ijpe.2004.10.001","article-title":"scheduling a single batch processing machine with arbitrary job sizes and incompatible job families","volume":"98","author":"koh","year":"2005","journal-title":"International Journal of Production Economics"},{"doi-asserted-by":"publisher","key":"4","DOI":"10.1109\/ISSE.2007.4432815"},{"doi-asserted-by":"publisher","key":"9","DOI":"10.1109\/WSC.2002.1166479"},{"year":"2005","author":"mo?nch","journal-title":"Ablaufplanung fu?r Batchmaschinen in der Halbleiterproduktion Modellierung und Lo?sungsverfahren","key":"8"},{"year":"2007","author":"werner","journal-title":"Entwi?cklung und Bewertung von Methoden zur Optimierung ausgewa?hlter Ferti?gungsprozesse in der Halbleiterindustrie","key":"11"}],"event":{"name":"2008 Winter Simulation Conference (WSC)","start":{"date-parts":[[2008,12,7]]},"location":"Miami, FL, USA","end":{"date-parts":[[2008,12,10]]}},"container-title":["2008 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4712635\/4736042\/04736300.pdf?arnumber=4736300","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,4]],"date-time":"2019-04-04T22:29:12Z","timestamp":1554416952000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/4736300\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":11,"URL":"https:\/\/doi.org\/10.1109\/wsc.2008.4736300","relation":{},"subject":[],"published":{"date-parts":[[2008,12]]}}}