{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,9]],"date-time":"2025-05-09T06:26:56Z","timestamp":1746772016514,"version":"3.28.0"},"reference-count":51,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1109\/wsc.2008.4736357","type":"proceedings-article","created":{"date-parts":[[2009,1,14]],"date-time":"2009-01-14T13:48:38Z","timestamp":1231940918000},"page":"2479-2487","source":"Crossref","is-referenced-by-count":10,"title":["Harnessing the power of simulation in the project management \/ decision support aspects of the construction industry"],"prefix":"10.1109","author":[{"given":"Gunnar","family":"Lucko","sequence":"first","affiliation":[]},{"given":"Perakath C.","family":"Benjamin","sequence":"additional","affiliation":[]},{"given":"Michael G.","family":"Madden","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"year":"0","key":"35"},{"key":"36","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1145\/256563.256606","article-title":"activity cycle diagrams and the three phase method","author":"paul","year":"1993","journal-title":"Proceedings of the Winter Simulation Conference"},{"year":"0","key":"33"},{"journal-title":"CIPROS Knowledge-based construction integrated project and process planning simulation System","year":"1992","author":"odeh","key":"34"},{"journal-title":"Simulation-based planning for construction","year":"1994","author":"sawhney","key":"39"},{"key":"37","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1987.122"},{"key":"38","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2007.4419833"},{"journal-title":"Simulation Based Shop Floor Control Automatic Model Generation and Control Interface","year":"2000","author":"son","key":"43"},{"key":"42","doi-asserted-by":"publisher","DOI":"10.1145\/268437.268749"},{"journal-title":"Automated modeling and optimization for construction simulation","year":"1995","author":"shi","key":"41"},{"key":"40","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2001.977480"},{"journal-title":"A generic construction process modelling method A model based approach for process description","year":"2001","author":"karhu","key":"22"},{"key":"23","first-page":"7","article-title":"the origins of cpm: a personal history","volume":"3","author":"kelley","year":"1989","journal-title":"PM Network"},{"journal-title":"Simulation With Arena","year":"2007","author":"kelton","key":"24"},{"journal-title":"A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry","year":"2004","author":"lee","key":"25"},{"year":"0","key":"26"},{"journal-title":"COOPS - construction object-oriented process simulation system","year":"1991","author":"liu","key":"27"},{"key":"28","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574384"},{"journal-title":"STROBOSCOPE State and resource based simulation of construction processes","year":"1996","author":"martinez","key":"29"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2000.899185"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1166454"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1139\/l97-123"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1172958"},{"key":"30","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1998.745006"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1998.745002"},{"key":"5","first-page":"72","article-title":"death by uml fever: are you (or your developers) sick? acm queue","volume":"2","author":"bell","year":"2004"},{"year":"0","key":"32"},{"key":"4","article-title":"visualization of construction graphics in outdoor augmented reality","author":"behzadan","year":"1914","journal-title":"Proceedings of the Winter Simulation Conference"},{"key":"31","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2000.899188"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2006.323206"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574526"},{"key":"19","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1996.873442"},{"key":"17","first-page":"956","article-title":"real world applications of construction process simulation","author":"halpin","year":"1999","journal-title":"Proceedings of the Winter Simulation Conference"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:1(2)"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(697)"},{"journal-title":"An investigation of the use of simulation networks for modeling construction operations","year":"1973","author":"halpin","key":"16"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2004.1371324"},{"key":"14","first-page":"45","article-title":"the last word on simulation","volume":"31","author":"garnett","year":"1999","journal-title":"HE Solutions"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574385"},{"journal-title":"RESQUE A resource based simulation system for construction process planning","year":"1986","author":"chang","key":"12"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2000.899191"},{"journal-title":"VITASCOPE Extensible and scalable 3D visualization of simulated construction operations","year":"2003","author":"kamat","key":"20"},{"key":"49","doi-asserted-by":"publisher","DOI":"10.2307\/2343076"},{"key":"48","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(93)90005-I"},{"key":"45","doi-asserted-by":"publisher","DOI":"10.2307\/2984128"},{"key":"44","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(01)00086-0"},{"key":"47","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1109\/WSC.2002.1172924","article-title":"experiencing virtual factories of the future","author":"waller","year":"2002","journal-title":"Proceedings of the Winter Simulation Conference"},{"key":"46","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:4(796)"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2007.4419707"},{"key":"51","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:3(394)"},{"key":"50","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2001)127:2(132)"}],"event":{"name":"2008 Winter Simulation Conference (WSC)","start":{"date-parts":[[2008,12,7]]},"location":"Miami, FL, USA","end":{"date-parts":[[2008,12,10]]}},"container-title":["2008 Winter Simulation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4712635\/4736042\/04736357.pdf?arnumber=4736357","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,4]],"date-time":"2019-04-04T22:29:53Z","timestamp":1554416993000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/4736357\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,12]]},"references-count":51,"URL":"https:\/\/doi.org\/10.1109\/wsc.2008.4736357","relation":{},"subject":[],"published":{"date-parts":[[2008,12]]}}}