{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T05:17:34Z","timestamp":1729660654360,"version":"3.28.0"},"reference-count":45,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009,12]]},"DOI":"10.1109\/wsc.2009.5429255","type":"proceedings-article","created":{"date-parts":[[2010,3,12]],"date-time":"2010-03-12T21:11:55Z","timestamp":1268428315000},"page":"2733-2744","source":"Crossref","is-referenced-by-count":3,"title":["Rapid deployment of simulation models for building construction applications"],"prefix":"10.1109","author":[{"given":"Gunnar","family":"Lucko","sequence":"first","affiliation":[]},{"given":"Kannan","family":"Swaminathan","sequence":"additional","affiliation":[]},{"given":"Perakath C.","family":"Benjamin","sequence":"additional","affiliation":[]},{"given":"Michael G.","family":"Madden","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1988)114:3(344)"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(01)00086-0"},{"article-title":"CIPROS: Knowledge-based Construction Integrated Project and Process Planning Simulation System","year":"1992","author":"odeh","key":"ref33"},{"key":"ref32","article-title":"IDEF family of methods for concurrent engineering and business re-engineering applications","author":"mayer","year":"1992","journal-title":"Report Knowledge Based Systems College Station Texas 77 p Available via <"},{"article-title":"STROBOSCOPE: State and resource based simulation of construction processes","year":"1996","author":"mart\u00ednez","key":"ref31"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574384"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1172956"},{"key":"ref36","article-title":"Enabling dynamic state control of discrete-event simulation models to enhance model validation","author":"rekapalli","year":"2007","journal-title":"Proceedings of the 2007 Construction Research Congress"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1987.122"},{"key":"ref34","article-title":"Programming by questionnaire: How to construction a program generator","author":"oldfather","year":"1966","journal-title":"Rand Report RM-5129-PR"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1172957"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1172924"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574385"},{"article-title":"RESQUE: A resource based simulation system for construction process planning","year":"1986","author":"chang","key":"ref12"},{"key":"ref13","article-title":"Product model & 4D CAD &#x2013; final report","author":"fischer","year":"2002","journal-title":"CIFE Technical Report #143"},{"key":"ref14","article-title":"A non-computer approach to the critical path method for the construction industry","author":"fondahl","year":"1962","journal-title":"Technical Report No 9 Revised 1962 Prepared under Research Contract NBy-17798 Bureau of Yards and Docks U S Navy"},{"article-title":"Integrated computer-aided project management through standard object-oriented models","year":"1992","author":"froese","key":"ref15"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(712)"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:7(697)"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1996.873442"},{"article-title":"An investigation of the use of simulation networks for modeling construction operations","year":"1973","author":"halpin","key":"ref19"},{"article-title":"COOPS &#x2013;construction object-oriented process simulation system","year":"1991","author":"liu","key":"ref28"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(94)90063-9"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1995.478766"},{"article-title":"Geometry-based modeling and simulation of construction processes","year":"2003","author":"akba?","key":"ref3"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2006.323206"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2008.4736357"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1998.745002"},{"year":"0","key":"ref8","article-title":"Industry economic accounts: Gross-domestic-product-by-industry-accounts: Custom data selection"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1177\/875697280203300104","article-title":"The life cycle of technical projects","volume":"33","author":"bonnal","year":"2002","journal-title":"Project Management Journal"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1992)118:3(525)"},{"journal-title":"U S Department of Labor Washington District of Columbia","article-title":"Career Guide to Industries: Construction. 2008&#x2013;09 Edition","year":"2008","key":"ref9"},{"article-title":"Using construction method models to generate 4D production models","year":"1998","author":"aalami","key":"ref1"},{"year":"1982","author":"haney","key":"ref20"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:3(394)"},{"article-title":"VITASCOPE: Extensible and scalable 3D visualization of simulated construction operations","year":"2003","author":"kamat","key":"ref22"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:1(2)"},{"key":"ref42","first-page":"12","article-title":"Use of critical path method on contract claims &#x2013; 2000","volume":"19","author":"wickwire","year":"1999","journal-title":"Construct Lawyer"},{"article-title":"A generic construction process modelling method: A model based approach for process description","year":"2001","author":"karhu","key":"ref24"},{"key":"ref41","first-page":"10","article-title":"A brief history of scheduling: Back to the future","author":"weaver","year":"2006"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2007)21:5(303)"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2001)127:2(132)"},{"article-title":"A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry","year":"2004","author":"lee","key":"ref26"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(93)90005-I"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1145\/1460299.1460318"}],"event":{"name":"2009 Winter Simulation Conference - (WSC 2009)","start":{"date-parts":[[2009,12,13]]},"location":"Austin, TX, USA","end":{"date-parts":[[2009,12,16]]}},"container-title":["Proceedings of the 2009 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5423773\/5429163\/05429255.pdf?arnumber=5429255","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,26]],"date-time":"2019-05-26T23:51:32Z","timestamp":1558914692000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5429255\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,12]]},"references-count":45,"URL":"https:\/\/doi.org\/10.1109\/wsc.2009.5429255","relation":{},"subject":[],"published":{"date-parts":[[2009,12]]}}}