{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T15:02:55Z","timestamp":1729609375440,"version":"3.28.0"},"reference-count":26,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1109\/wsc.2011.6148039","type":"proceedings-article","created":{"date-parts":[[2012,2,9]],"date-time":"2012-02-09T22:20:26Z","timestamp":1328826026000},"page":"3431-3442","source":"Crossref","is-referenced-by-count":0,"title":["Using simulation to study the impact of improving Lookahead planning on the reliability of production planning"],"prefix":"10.1109","author":[{"given":"Farook","family":"Hamzeh","sequence":"first","affiliation":[]},{"given":"Brandon","family":"Langerud","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","article-title":"The Evaluation of Alternative Production System Designs with Discrete Event Simulation","author":"draper","year":"2002","journal-title":"The 10th international group for lean construction conference"},{"key":"ref11","first-page":"379","article-title":"The Lean Journey: Implementing the Last Planner System in Construction","author":"f r","year":"2011","journal-title":"Proceedings of the 19th Annual Conference of the International Group for Lean Construction (IGLC 19)"},{"article-title":"Improving Construction Workflow - The Role of Production Planning and Control","year":"2009","author":"f r","key":"ref12"},{"key":"ref13","first-page":"635","article-title":"Improving Construction Workflow&#x2013;The Connective Role of Lookahead Planning","author":"hamzeh","year":"0","journal-title":"Proceedings of the 16th Annual Conference of the International Group for Lean Construction (IGLC 16)"},{"key":"ref14","first-page":"181","article-title":"Logistics Centers to Support Project&#x2013;based Production in the Construction Industry","author":"hamzeh","year":"0","journal-title":"Proceedings of the 15th Annual Conference of the International Group for Lean Construction (IGLC 15)"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.05.001"},{"key":"ref16","first-page":"523","article-title":"Simulation&#x2013;based Scheduling Model for Multiple Design Projects","author":"liu","year":"2009","journal-title":"Proceedings of the 17th Annual Conference of the International Group for Lean Construction"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:4(265)"},{"key":"ref18","first-page":"131","article-title":"Using Discrete&#x2013;Event Simulation to Support Decision&#x2013;Makers in Production System Design and Operations","author":"schramm","year":"2007","journal-title":"Proceedings of the 15th Annual Conference of the International Group for Lean Construction"},{"journal-title":"Event Graph Modeling using SIGMA","year":"2005","author":"schruben","key":"ref19"},{"key":"ref4","first-page":"90","article-title":"Advancing the Art of Simulation in the Social Sciences","author":"axelrod","year":"2006","journal-title":"Handbook of Research on Nature Inspired Computing for Economy and Management"},{"key":"ref3","first-page":"341","article-title":"Simulation as a Tool for Production System Design in Construction","author":"t d c l","year":"2006","journal-title":"Proceedings of the 14th Annual Conference of the International Group for Lean Construction"},{"article-title":"The Last Planner System of Production Control","year":"2000","author":"g","key":"ref6"},{"key":"ref5","first-page":"13","article-title":"Lookahead Planning: The Missing Link in Production Control","author":"g","year":"1997","journal-title":"Proc 5th Annual Conf Int'l Group for Lean Constr IGLC 5"},{"key":"ref8","article-title":"An Update on Last Planner","author":"ballard","year":"2003","journal-title":"11th Annu Conf Int Group Lean Constr"},{"journal-title":"The Last Planner Production Workbook&#x2013;Improving Reliability in Planning and Workflow","year":"2007","author":"ballard","key":"ref7"},{"key":"ref2","first-page":"263","article-title":"Playing Games: Evaluating the Impact of Lean production Strategies on Project Cost and Schedule","author":"alarcon","year":"1999","journal-title":"Proceeding of the 7th Annual Conference of the International Group for Lean Construction"},{"key":"ref9","first-page":"829","article-title":"Simulation Research Methods","author":"k","year":"2002","journal-title":"Companion to Organizations"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1993)119:2(355)"},{"key":"ref20","article-title":"Computer Simulation in AEC and its Future Development","author":"j j","year":"1999","journal-title":"Stanford Construction Engineering and Management Workshop"},{"key":"ref22","first-page":"121","article-title":"Discrete&#x2013;Event Simulation of Lean Construction Processes","author":"i d","year":"1997","journal-title":"Proceedings of the 5th Annual Conference of the International Group for Lean Construction"},{"key":"ref21","first-page":"580","article-title":"The Investigation of lead&#x2013;Time Buffering Under Uncertainty using Simulation and Cost Optimization","author":"srisuwanrat","year":"2007","journal-title":"Proceedings of the 15th Annual Conference of the International Group for Lean Construction"},{"key":"ref24","article-title":"Look&#x2013;ahead Planning: Screening and Pulling","author":"i d","year":"1997","journal-title":"Technical Report No 97&#x2013;9 Construction Engineering and Management Program Civil and Environmental Engineering Department"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(279)","article-title":"Pull&#x2013;driven Scheduling for Pipe&#x2013;spool installation: Simulation of a Lean Construction Technique","volume":"124","author":"i d","year":"1998","journal-title":"Journal of Construction Engineering and Managemen"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/0928-4869(95)00018-6"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1993)119:2(336)"}],"event":{"name":"2011 Winter Simulation Conference - (WSC 2011)","start":{"date-parts":[[2011,12,11]]},"location":"Phoenix, AZ, USA","end":{"date-parts":[[2011,12,14]]}},"container-title":["Proceedings of the 2011 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6135535\/6147014\/06148039.pdf?arnumber=6148039","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,20]],"date-time":"2017-06-20T14:01:18Z","timestamp":1497967278000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6148039\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,12]]},"references-count":26,"URL":"https:\/\/doi.org\/10.1109\/wsc.2011.6148039","relation":{},"subject":[],"published":{"date-parts":[[2011,12]]}}}