{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T14:49:55Z","timestamp":1729608595412,"version":"3.28.0"},"reference-count":16,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,12]]},"DOI":"10.1109\/wsc.2012.6464982","type":"proceedings-article","created":{"date-parts":[[2013,3,1]],"date-time":"2013-03-01T08:24:26Z","timestamp":1362126266000},"page":"1-12","source":"Crossref","is-referenced-by-count":2,"title":["Simulation-based distributed fuzzy control for WIP in a multi-variety and small-batch discrete production system with one tightly coupled cell"],"prefix":"10.1109","author":[{"given":"Run","family":"Zhao","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Soemon","family":"Takakuwa","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"15","doi-asserted-by":"publisher","DOI":"10.1016\/j.neucom.2009.06.020"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2006.02.014"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2008.4736287"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1016\/S0020-0255(00)00030-X"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2009.01.007"},{"key":"12","doi-asserted-by":"crossref","first-page":"1371","DOI":"10.1016\/j.simpat.2011.02.002","article-title":"Multi-objective supervisory flow control based on fuzzy interval arithmetic: Application for scheduling of manufacturing systems","volume":"19","author":"tamani","year":"2011","journal-title":"Simulation Modeling Practice and Theory"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2005.04.004"},{"key":"2","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1080\/07408179508936775","article-title":"Scheduling manufacturing systems with work-in-process inventory control: Single-part-type system","volume":"27","author":"bai","year":"1994","journal-title":"IIE Transaction"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1080\/00207549408956938"},{"key":"10","doi-asserted-by":"crossref","first-page":"8328","DOI":"10.1016\/j.amc.2011.03.023","article-title":"Effects of imperfect products on lot sizing with work- in-process inventory","volume":"217","author":"morteza","year":"2011","journal-title":"Applied Mathematics and Computation"},{"key":"7","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.ijpe.2008.08.043","article-title":"Restricted work-in-process: A study of differences between Kanban and CONWIP","volume":"118","author":"jan","year":"2009","journal-title":"International Journal of Production Economics"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/TRA.2004.825518"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1080\/07408170008967448"},{"key":"4","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/0959-1524(94)80052-9","article-title":"An introduction to fuzzy control","volume":"4","author":"driankov","year":"1994","journal-title":"Journal of Process Control"},{"key":"9","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1016\/j.ijpe.2011.01.014","article-title":"Determining the optimal dimension of a work-in-process storage area","volume":"131","author":"luca","year":"2011","journal-title":"International Journal of Production Economics"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1016\/0278-6125(92)90031-A"}],"event":{"name":"2012 Winter Simulation Conference - (WSC 2012)","start":{"date-parts":[[2012,12,9]]},"location":"Berlin, Germany","end":{"date-parts":[[2012,12,12]]}},"container-title":["Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6451330\/6464965\/06464982.pdf?arnumber=6464982","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T04:29:50Z","timestamp":1498019390000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6464982\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,12]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/wsc.2012.6464982","relation":{},"subject":[],"published":{"date-parts":[[2012,12]]}}}