{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,28]],"date-time":"2025-05-28T05:10:30Z","timestamp":1748409030425},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,12]]},"DOI":"10.1109\/wsc.2012.6465305","type":"proceedings-article","created":{"date-parts":[[2013,3,1]],"date-time":"2013-03-01T08:24:26Z","timestamp":1362126266000},"page":"1-9","source":"Crossref","is-referenced-by-count":4,"title":["A mathematical model for estimating defect inspection capacity with a dynamic control strategy"],"prefix":"10.1109","author":[{"given":"Gloria Luz","family":"Rodriguez-Verjan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stephane","family":"Dauzere-Peres","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jacques","family":"Pinaton","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2009.2031779"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2011.6147905"},{"key":"12","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1109\/ISSM.2003.1243290","article-title":"A capacity-dependence dynamic sampling strategy","author":"song-bor","year":"2003","journal-title":"Semiconductor Manufacturing 2003 IEEE International Symposium on"},{"journal-title":"Advanced Process Control and Optimal Sampling in Semiconductor Manufacturing","year":"2008","author":"hyung joo lee","key":"3"},{"journal-title":"Inspection and metrology capacity allocation in the full production and ramp phases of semiconductor manufacturing","year":"2005","author":"gudmundsson","key":"2"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/ASMC.2010.5551470"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/ISSM.2005.1513299"},{"key":"7","first-page":"9","article-title":"A mathematical programming approach for determining control plans in semiconductor manufacturing","author":"nduhura munga","year":"2011","journal-title":"Proceedings of the International Conference on Industrial Engineering and Systems Management"},{"key":"6","first-page":"18","article-title":"Dynamic management of controls in semiconductor manufacturing","author":"nduhura munga","year":"2011","journal-title":"Proc 12th Annu IEEE\/SEMI Advanced Semiconductor Manufacturing Conf"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1002\/0471790281"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2010.490022"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/ISSM.1994.729441"},{"journal-title":"Literature Review on Sampling Techniques in Semiconductor Manufacturing","year":"2012","author":"nduhura munga","key":"8"}],"event":{"name":"2012 Winter Simulation Conference - (WSC 2012)","start":{"date-parts":[[2012,12,9]]},"location":"Berlin, Germany","end":{"date-parts":[[2012,12,12]]}},"container-title":["Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6451330\/6464965\/06465305.pdf?arnumber=6465305","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T04:29:51Z","timestamp":1498019391000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6465305\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,12]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/wsc.2012.6465305","relation":{},"subject":[],"published":{"date-parts":[[2012,12]]}}}