{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T21:49:11Z","timestamp":1729633751812,"version":"3.28.0"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1109\/wsc.2013.6721564","type":"proceedings-article","created":{"date-parts":[[2014,1,31]],"date-time":"2014-01-31T17:35:58Z","timestamp":1391189758000},"page":"1835-1846","source":"Crossref","is-referenced-by-count":0,"title":["Upsizing manufacturing line in vietnamese industrial plants: A simulation approach"],"prefix":"10.1109","author":[{"given":"Nguyen","family":"Dang Minh","sequence":"first","affiliation":[]},{"given":"Nguyen","family":"Dang Toan","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"15","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/S0736-5845(02)00016-9","article-title":"Equipment replacement decisions and lean manufacturing","volume":"18","author":"thomas","year":"2002","journal-title":"Journal of Robotics and Computer Integrated Manufacturing"},{"journal-title":"Optimization Modeling with LINDO","year":"1997","author":"schrage","key":"13"},{"key":"14","first-page":"973","article-title":"Simulation and production planning for manufacturing cells","author":"cochran","year":"1998","journal-title":"Proc 1998 Winter Simulation Conf"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.12.003"},{"key":"12","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1108\/01443579910244241","article-title":"Downsizing production\/operations with multi-objective programming","volume":"19","author":"hoffman","year":"1999","journal-title":"International Journal of Operations and Production Management"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(93)90110-7"},{"key":"2","first-page":"1633","article-title":"Measuring manufacturing throughput using takt time analysis and simulation","author":"taaffe","year":"2007","journal-title":"Proc of the 2007 Winter Simulation Conference"},{"key":"1","first-page":"616","article-title":"Transforming a traditional manufacturing system into a just-in-time system with kanban","author":"johnson","year":"1988","journal-title":"1988 Winter Simulation Conference Proceedings"},{"key":"10","first-page":"949","article-title":"A practical bottleneck detection method","author":"nakano","year":"2001","journal-title":"Proceedings of the 2001 Winter Simulation Conference"},{"journal-title":"Simulation With Arena","year":"2007","author":"sadowski","key":"7"},{"key":"6","first-page":"1213","article-title":"Production capacity analysis of a shock absorber assembly line using simulation","author":"ogale","year":"2004","journal-title":"Proceedingsof the 2004 Winter Simulation Conference"},{"key":"5","first-page":"1386","article-title":"Validation of the Re-design of a manufacturing work cell using simulation","author":"marvel","year":"2005","journal-title":"Proceedings of the Winter Simulation Conference 2005"},{"key":"4","doi-asserted-by":"crossref","first-page":"5","DOI":"10.2507\/IJSIMM06(1)1.068","article-title":"Simulation of manufacturing cells with unreliable machines","volume":"6","author":"masmoudi","year":"2007","journal-title":"International Journal of Simulation Modelling"},{"journal-title":"Toyota Production System An Integrated Approach to Just-In-Time","year":"1998","author":"monden","key":"9"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.2507\/IJSIMM05(2)1.054"}],"event":{"name":"2013 Winter Simulation Conference - (WSC 2013)","start":{"date-parts":[[2013,12,8]]},"location":"Washington, DC, USA","end":{"date-parts":[[2013,12,11]]}},"container-title":["2013 Winter Simulations Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6709837\/6721384\/06721564.pdf?arnumber=6721564","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,22]],"date-time":"2017-06-22T03:04:29Z","timestamp":1498100669000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6721564\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/wsc.2013.6721564","relation":{},"subject":[],"published":{"date-parts":[[2013,12]]}}}