{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T07:12:39Z","timestamp":1770966759182,"version":"3.50.1"},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1109\/wsc.2013.6721685","type":"proceedings-article","created":{"date-parts":[[2014,1,31]],"date-time":"2014-01-31T17:35:58Z","timestamp":1391189758000},"page":"3191-3202","source":"Crossref","is-referenced-by-count":3,"title":["Integration of simulation and Pareto-based optimization for space planning in the finishing phase"],"prefix":"10.1109","author":[{"given":"Trang","family":"Dang","sequence":"first","affiliation":[]},{"given":"Hans-Joachim","family":"Bargstadt","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"13","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:5(473)"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2006.07.009"},{"key":"11","article-title":"Vom bauwerksinformationsmodell zur terminplanung","author":"tauscher","year":"2011","journal-title":"Ein Modell Zur Generierung Von Bauablaufpla?nen"},{"key":"12","author":"tulke","year":"2010","journal-title":"Kollaborative Terminplanung Auf Basis Von Bauwerksinformationsmodellen"},{"key":"3","article-title":"Generating workspace requirements in a finishing execution phase","author":"dang","year":"2012","journal-title":"4th International Conference on Construction Application of Virtual Reality"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000075"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2002)16:2(124)"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-008-0490-3"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.08.005"},{"key":"6","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.autcon.2006.04.001","article-title":"A method for planning of work-flow by combined use of location-based scheduling and 4D CAD","volume":"16","author":"jongeling","year":"2007","journal-title":"Automation in Construction No"},{"key":"5","first-page":"75","article-title":"Stacking of trades","author":"hana","year":"2008","journal-title":"Construction Productivity A Practical Guide for Building and Electrical Contractors"},{"key":"4","article-title":"4D Grid-based simulation framework for facilitating workspace management","author":"elmahdi","year":"2011","journal-title":"Conference on Construction Applications of Virtual Reality"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1007\/1-84628-137-7_4"},{"key":"8","article-title":"Assessing space criticality in sequencing and identifying execution patterns for construction activities using VR visualisations","author":"mallasi","year":"2001","journal-title":"ARCOM Doctoral Research Workshop Simulation and Modelling in Construction"}],"event":{"name":"2013 Winter Simulation Conference - (WSC 2013)","location":"Washington, DC, USA","start":{"date-parts":[[2013,12,8]]},"end":{"date-parts":[[2013,12,11]]}},"container-title":["2013 Winter Simulations Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6709837\/6721384\/06721685.pdf?arnumber=6721685","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,22]],"date-time":"2017-06-22T03:04:43Z","timestamp":1498100683000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6721685\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/wsc.2013.6721685","relation":{},"subject":[],"published":{"date-parts":[[2013,12]]}}}