{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T15:01:32Z","timestamp":1729609292823,"version":"3.28.0"},"reference-count":9,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1109\/wsc.2013.6721744","type":"proceedings-article","created":{"date-parts":[[2014,1,31]],"date-time":"2014-01-31T22:35:58Z","timestamp":1391207758000},"page":"3850-3857","source":"Crossref","is-referenced-by-count":0,"title":["A simulation study on line management policies with special focus on bottleneck machines"],"prefix":"10.1109","author":[{"given":"Lixin","family":"Wang","sequence":"first","affiliation":[]},{"given":"Vinoth","family":"Chandrasekaran","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"3","first-page":"1","article-title":"Advanced predictive scheduling technology can improve litho cell productivity","volume":"6","author":"hanny","year":"2011","journal-title":"Nanochip Fab Solutions"},{"key":"2","first-page":"151","article-title":"Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing","author":"david","year":"1996","journal-title":"Proc 1996 IEEE\/SEMI Advanced Semiconductor Manufacturing Conf Workshop"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/ASMC.2006.1638740"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-010-0222-9"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1287\/inte.32.1.61.15"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2010.5678943"},{"key":"4","first-page":"2067","article-title":"A queueing network based system to model capacity and cycle time for semiconductor fabrication","author":"horst","year":"2008","journal-title":"Proceedings of the 2008 Winter Simulation Conference"},{"journal-title":"Optimal and Approximate Algorithms for the Multiple-Lots-per-Carrier Scheduling and Integrated Automated Material Handling and Lots Scheduling Problems in 300mm Wafer Fabs","year":"2008","author":"wang","key":"9"},{"key":"8","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1080\/09537287.2010.490014","article-title":"A survey of dispatching rules for operations control in wafer fabrication","volume":"22","author":"subhash","year":"2011","journal-title":"Production Planning and Control"}],"event":{"name":"2013 Winter Simulation Conference - (WSC 2013)","start":{"date-parts":[[2013,12,8]]},"location":"Washington, DC, USA","end":{"date-parts":[[2013,12,11]]}},"container-title":["2013 Winter Simulations Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6709837\/6721384\/06721744.pdf?arnumber=6721744","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,22]],"date-time":"2017-06-22T07:04:36Z","timestamp":1498115076000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6721744\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,12]]},"references-count":9,"URL":"https:\/\/doi.org\/10.1109\/wsc.2013.6721744","relation":{},"subject":[],"published":{"date-parts":[[2013,12]]}}}