{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T17:00:32Z","timestamp":1729616432762,"version":"3.28.0"},"reference-count":32,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1109\/wsc.2014.7020062","type":"proceedings-article","created":{"date-parts":[[2015,1,27]],"date-time":"2015-01-27T15:30:56Z","timestamp":1422372656000},"page":"2180-2191","source":"Crossref","is-referenced-by-count":2,"title":["Planning hybrid U-shaped assembly systems using heuristics and simulation"],"prefix":"10.1109","author":[{"given":"Gert","family":"Zulch","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Michael","family":"Zulch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref32","first-page":"543","article-title":"2014. &#x201C;Extending Precedence Graphs, Capacity Graphs and Staff Assignment Graphs to Model-mix Production Systems","volume":"1","author":"z\u00fclch","year":"2014","journal-title":"Eighteenth International Working Seminar on Production Economics Congress Innsbruck"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-12494-5_5"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(99)00132-2"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-81756-4"},{"key":"ref11","first-page":"360","article-title":"Clothing Assembly Line Design Using Simulation and Heuristic Line Balancing Techniques","volume":"22","author":"ery\u00fcr\u00fck","year":"2014","journal-title":"Tekstil ve konfeksiyon Izmir"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.832489"},{"journal-title":"Computers and Intractability A Guide to the Theory of NP-Completeness","year":"1979","author":"garey","key":"ref13"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.2.3.261"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1080\/00207540801905486"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1080\/00207540110119081"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.40.10.1378"},{"journal-title":"Planung hybrider Montagesysteme auf Basis mehrschichtiger Vorranggraphen","year":"2002","author":"m\u00fcller","key":"ref18"},{"key":"ref19","first-page":"209","article-title":"The Precedence Diagram: A Tool for Analysis in Assembly Line Balancing","volume":"15","author":"prenting","year":"1964","journal-title":"Journal of Industrial Eneineering"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(95)00078-X"},{"key":"ref4","first-page":"75","article-title":"Investigation the Behaviour of a Balanced Stochastic U-type Assembly Line Using Simulation","volume":"3","author":"baykoc","year":"2008","journal-title":"International Journal of Science & Technology"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(02)00326-2"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2012.10.020"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.02.026"},{"key":"ref29","first-page":"157","article-title":"The Staff Assignment Graph - Planning, Evaluating and Improving Personnel Deployment in Assembly Systems","author":"z\u00fclch","year":"2011","journal-title":"Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.10.010"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.20.6.1010"},{"journal-title":"Beitrag zur Festlegung der Arbeitsteilung in manuellen Arbeitssystemen","year":"1995","author":"braun","key":"ref7"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1080\/00207546508919982"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.15807\/jorsj.51.1","article-title":"Heuristic for Balancing U-shaped Assembly Lines with Parallel Stations","volume":"51","author":"chen","year":"2008","journal-title":"Journal of the Operations Research Society of Japan"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00148-6"},{"journal-title":"Arbeitssystem- und Prozessgestaltung\/Work System and Process Design Produktionsdaten-Management\/Production Data Management Planung und Steuerung\/Planning and Controlling","year":"2002","key":"ref20"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2012.01.004"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.4186\/ej.2010.14.2.53"},{"journal-title":"Simulation von Logistik- Materialfluss- und Produktionssystemen - Abbildung des Personals in Simulationsmodellen","year":"2001","key":"ref24"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.44.5.738"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)60964-0"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2009.12.001"}],"event":{"name":"2014 Winter Simulation Conference - (WSC 2014)","start":{"date-parts":[[2014,12,7]]},"location":"Savanah, GA, USA","end":{"date-parts":[[2014,12,10]]}},"container-title":["Proceedings of the Winter Simulation Conference 2014"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7002492\/7019868\/07020062.pdf?arnumber=7020062","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,20]],"date-time":"2019-08-20T05:13:04Z","timestamp":1566277984000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7020062\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":32,"URL":"https:\/\/doi.org\/10.1109\/wsc.2014.7020062","relation":{},"subject":[],"published":{"date-parts":[[2014,12]]}}}