{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T02:09:50Z","timestamp":1729649390407,"version":"3.28.0"},"reference-count":35,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1109\/wsc.2014.7020091","type":"proceedings-article","created":{"date-parts":[[2015,1,27]],"date-time":"2015-01-27T15:30:56Z","timestamp":1422372656000},"page":"2478-2489","source":"Crossref","is-referenced-by-count":9,"title":["Flexible job-shop scheduling with extended route flexibility for semiconductor manufacturing"],"prefix":"10.1109","author":[{"given":"Sebastian","family":"Knopp","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stephane","family":"Dauzere-Peres","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Claude","family":"Yugma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/66.4384"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1287\/opre.40.1.113"},{"journal-title":"Generalized Job Shop Scheduling Complexity and Local Search","year":"1995","author":"vaessens","key":"ref31"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.8.3.302"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.575090"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1016\/0166-218X(93)E0127-K"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2007.01.001"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1287\/moor.1.2.117"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/S0278-6125(97)85674-9"},{"key":"ref13","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: a survey","volume":"5","author":"graham","year":"1977","journal-title":"Annals of Discrete Mathematics"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.594816"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1007\/BF01719451"},{"journal-title":"Scheduling Jobs in Shops with Multi-Purpose Machines","year":"1992","author":"jurisch","key":"ref16"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00828-7"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2008.4736310"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.3.CO;2-P"},{"key":"ref28","article-title":"Les problemes d'ordonnancement avec contraintes disjonctives","author":"roy","year":"1964","journal-title":"Note ds"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956766"},{"key":"ref27","article-title":"Enhanced Operation Scheduling within Railcar Maintenance Centers","author":"ramond","year":"2006","journal-title":"Proceedings of the 7th World Congress on Railway Research"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1007\/BF02238804"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TSMCC.2003.814036"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-40627-0_47"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1023\/A:1018930406487"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2006.879414"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(97)00341-X"},{"key":"ref2","article-title":"Test Instances for the Flexible Job Shop Scheduling Problem with Work Centers","author":"behnke","year":"2012","journal-title":"Technical Report"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/0890-5401(92)90041-D"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.34.3.391"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2011.01.046"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.04.001"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1137\/S009753970037727X"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.42.6.797"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-010-0222-9"},{"key":"ref26","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-2361-4","author":"pinedo","year":"2012","journal-title":"Scheduling Theory Algorithms and Systems"},{"key":"ref25","first-page":"1997","article-title":"Large neighborhood search and adaptive randomized decompositions for flexible jobshop scheduling","volume":"3","author":"pacino","year":"2011","journal-title":"Proceedings of the 22nd International Joint Conference on Artificial Intelligence"}],"event":{"name":"2014 Winter Simulation Conference - (WSC 2014)","start":{"date-parts":[[2014,12,7]]},"location":"Savanah, GA, USA","end":{"date-parts":[[2014,12,10]]}},"container-title":["Proceedings of the Winter Simulation Conference 2014"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7002492\/7019868\/07020091.pdf?arnumber=7020091","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,1]],"date-time":"2023-08-01T17:58:28Z","timestamp":1690912708000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7020091\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":35,"URL":"https:\/\/doi.org\/10.1109\/wsc.2014.7020091","relation":{},"subject":[],"published":{"date-parts":[[2014,12]]}}}