{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,6]],"date-time":"2025-08-06T12:38:49Z","timestamp":1754483929270,"version":"3.28.0"},"reference-count":27,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1109\/wsc.2014.7020173","type":"proceedings-article","created":{"date-parts":[[2015,1,27]],"date-time":"2015-01-27T10:30:56Z","timestamp":1422354656000},"page":"3399-3410","source":"Crossref","is-referenced-by-count":10,"title":["BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication"],"prefix":"10.1109","author":[{"family":"Xiaolin Hu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ming","family":"Lu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Simaan","family":"AbouRizk","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"841","article-title":"Application of Neural Networks in Earthmoving Equipment Production Estimating","author":"karshenas","year":"1992","journal-title":"Computing in Civil Engineering and Geographic Information Systems Symposium"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.5345\/JKIBC.2013.13.5.506"},{"article-title":"Productivity Studies Using Advanced ANN Models","year":"2001","author":"lu","key":"ref12"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.05.005"},{"journal-title":"National BIM Standard - United States","article-title":"What Is a BIM?","year":"2014","key":"ref14"},{"key":"ref15","article-title":"Sequential Minimal Optimization: A Fast Algorithm for Training Support Vector Machines","author":"platt","year":"1998","journal-title":"Technical Report MSR-TR-98&#x2013;14 Microsoft Research"},{"article-title":"Estimating Concrete Formwork Productivity","year":"1996","author":"portas","key":"ref16"},{"key":"ref17","first-page":"564","article-title":"Estimating with BIM: A Survey of US Construction Companies","author":"sattineni","year":"2011","journal-title":"Proc Intl Symposium on Automation & Robotics in Construction"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/72.870050"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(133)"},{"journal-title":"Model Selection and Multimodel Inference A Practical Information-theoretic Approach","year":"2002","author":"burnham","key":"ref4"},{"year":"2004","key":"ref27","article-title":"Automating the Takeoff and Estimating Process"},{"article-title":"WEKA Manual for Version 3&#x2013;6&#x2013;11","year":"2014","author":"bouckaert","key":"ref3"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:7(517)"},{"journal-title":"Productivity in Construction","year":"1993","author":"dozzi","key":"ref5"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:8(938)"},{"key":"ref7","first-page":"401","article-title":"Condition Prediction Models for Oil and Gas Pipelines Using Regression Analysis","volume":"0","author":"e1-abbasy","year":"2014","journal-title":"Journal of Construction Engineering and Management"},{"journal-title":"Building Information Model","year":"2003","key":"ref2"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.4017\/gt.2012.11.02.318.00"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1108\/17538370910971063"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1023\/B:STCO.0000035301.49549.88"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:6(498)"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2008)134:10(786)"},{"journal-title":"Tekla","article-title":"Tekla","year":"2014","key":"ref24"},{"journal-title":"Steelconstruction info","article-title":"The Case for Steel","year":"2014","key":"ref23"},{"key":"ref26","article-title":"Model Based Estimating to Inform Target Value Design","author":"tiwari","year":"2009","journal-title":"AECbytes &#x201C;Building the Future&#x201D; Article"},{"journal-title":"WEKA","article-title":"Weka 3 - Data Mining with Open Source Machine Learning Software in Java","year":"2014","key":"ref25"}],"event":{"name":"2014 Winter Simulation Conference - (WSC 2014)","start":{"date-parts":[[2014,12,7]]},"location":"Savanah, GA, USA","end":{"date-parts":[[2014,12,10]]}},"container-title":["Proceedings of the Winter Simulation Conference 2014"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7002492\/7019868\/07020173.pdf?arnumber=7020173","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,24]],"date-time":"2017-03-24T01:51:23Z","timestamp":1490320283000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7020173\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":27,"URL":"https:\/\/doi.org\/10.1109\/wsc.2014.7020173","relation":{},"subject":[],"published":{"date-parts":[[2014,12]]}}}