{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,13]],"date-time":"2026-05-13T08:53:37Z","timestamp":1778662417700,"version":"3.51.4"},"reference-count":25,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1109\/wsc.2015.7408392","type":"proceedings-article","created":{"date-parts":[[2016,5,7]],"date-time":"2016-05-07T09:42:38Z","timestamp":1462614158000},"page":"2884-2895","source":"Crossref","is-referenced-by-count":18,"title":["Simulation-based performance assessment of production planning formulations for semiconductor wafer fabrication"],"prefix":"10.1109","author":[{"given":"Timm","family":"Ziarnetzky","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"N. Baris","family":"Kacar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lars","family":"Monch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Reha","family":"Uzsoy","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2011.2176560"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2013.2283038"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721733"},{"key":"ref13","first-page":"51","article-title":"Focusing Maintenance Improvement Efforts in a Wafer Fabrication Facility Operating Under the Theory of Constraints","volume":"8","author":"kayton","year":"1997","journal-title":"Production and Inventory Management"},{"key":"ref14","first-page":"746","article-title":"Semiconductor Production Planning","author":"leachman","year":"2001","journal-title":"Handbook of Applied Optimization"},{"key":"ref15","author":"lin","year":"2014","journal-title":"Managing Release Changes in Rolling Horizon Production Planning"},{"key":"ref16","first-page":"437","article-title":"Optimization Models for Production Planning","author":"missbauer","year":"2010","journal-title":"Planning Production and Inventories in the Extended Enterprise A State of the Art Hand book"},{"key":"ref17","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-4472-5","author":"m\u00f6nch","year":"2013","journal-title":"Production Planning and Control for Semiconductor Wafer Fabrication Facilities Modeling Analysis and Systems"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1080\/0740817X.2013.803637"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-8191-2_3"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.1080.0983"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2005.863214"},{"key":"ref6","author":"h\u00e4ussler","year":"2014","journal-title":"Comparison of Two Optimization based Order Release Models with Fixed and Variable Lead Times and an Empirical Validation of Metamodels of Work Centres in Order Release Planning"},{"key":"ref5","author":"conover","year":"1980","journal-title":"Practical Nonparametric Statistics"},{"key":"ref8","author":"hopp","year":"2008","journal-title":"Factory Physics Foundations of Manufacturing Management"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1080\/07408179408966604"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1002\/nav.20335"},{"key":"ref9","author":"johnson","year":"1974","journal-title":"Operations Research in Production Planning Scheduling and Inventory Control"},{"key":"ref1","author":"albey","year":"2014","journal-title":"Technical Report Fitts Department of Industrial and Systems Engineering North Carolina State University"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-007-0173-5"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.775523"},{"key":"ref21","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1016\/j.omega.2014.01.005","article-title":"Simulation-based Performance Assessment of Master Planning Approaches in Semiconductor Manufacturing","volume":"46","author":"ponsignon","year":"2014","journal-title":"Omega"},{"key":"ref24","author":"spitter","year":"2005","journal-title":"Rolling Schedule Approaches for Supply Chain Operations Planning"},{"key":"ref23","article-title":"The Impact of Foreknowledge of Demand in Case of Optimization-based Order Release Mechanism in Workload Control: A Simulation Study based on a Make-to-order Manufacturer","author":"stampfer","year":"2013","journal-title":"Technical Report Department of Information Systems Production and Logistics Management"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-24764-7"}],"event":{"name":"2015 Winter Simulation Conference (WSC)","location":"Huntington Beach, CA, USA","start":{"date-parts":[[2015,12,6]]},"end":{"date-parts":[[2015,12,9]]}},"container-title":["2015 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7399125\/7408148\/07408392.pdf?arnumber=7408392","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,24]],"date-time":"2017-06-24T13:02:07Z","timestamp":1498309327000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7408392\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,12]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/wsc.2015.7408392","relation":{},"subject":[],"published":{"date-parts":[[2015,12]]}}}