{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T15:39:04Z","timestamp":1774453144402,"version":"3.50.1"},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1109\/wsc.2017.8248040","type":"proceedings-article","created":{"date-parts":[[2018,1,8]],"date-time":"2018-01-08T17:43:13Z","timestamp":1515433393000},"page":"3218-3229","source":"Crossref","is-referenced-by-count":12,"title":["A heuristic simulation-based framework to improve the scheduling of blocks assembly and the production process in shipbuilding"],"prefix":"10.1109","author":[{"given":"Natalia P.","family":"Basan","sequence":"first","affiliation":[]},{"given":"Victoria G.","family":"Achkar","sequence":"additional","affiliation":[]},{"given":"Carlos A.","family":"Mendez","sequence":"additional","affiliation":[]},{"given":"Alejandro","family":"Garcia-del-Valle","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","article-title":"Spatial Scheduling Optimization Algorithm for Block Assembly in Shipbuilding","author":"shang","year":"2013","journal-title":"Mathematical Problems in Engineering"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2005.11.013"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.07.004"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.12989\/sem.2015.54.5.999"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.639816"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.2202\/1556-3758.1565"},{"key":"ref3","first-page":"197","article-title":"Improving Planning and Resource Utilization of a Shipbuilding Process Based on Simulation","author":"cebral fernandez","year":"2016","journal-title":"European Modeling and Simulation Symposium"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/ICICIC.2008.146"},{"key":"ref5","first-page":"119","article-title":"Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem","volume":"7","author":"kim","year":"2002","journal-title":"Asia Pacific Management Review"},{"key":"ref8","doi-asserted-by":"crossref","first-page":"3","DOI":"10.32738\/JEPPM.201107.0002","article-title":"A Simulation Model for Spatial Scheduling of Dynamic Block Assembly in Shipbuilding","volume":"1","author":"liu","year":"2011","journal-title":"Journal of Engineering Project and Production Management"},{"key":"ref7","author":"law","year":"2007","journal-title":"Simulation Modeling and Analysis"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)62865-0"},{"key":"ref1","author":"banks","year":"2005","journal-title":"Discrete-Event System Simulation"},{"key":"ref9","author":"pedgen","year":"2009","journal-title":"An Introduction to SIMIO for Beginners"}],"event":{"name":"2017 Winter Simulation Conference (WSC)","location":"Las Vegas, NV","start":{"date-parts":[[2017,12,3]]},"end":{"date-parts":[[2017,12,6]]}},"container-title":["2017 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8232982\/8247314\/08248040.pdf?arnumber=8248040","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,9]],"date-time":"2019-10-09T00:13:45Z","timestamp":1570580025000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8248040\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/wsc.2017.8248040","relation":{},"subject":[],"published":{"date-parts":[[2017,12]]}}}