{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T16:52:29Z","timestamp":1729615949101,"version":"3.28.0"},"reference-count":39,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1109\/wsc.2017.8248069","type":"proceedings-article","created":{"date-parts":[[2018,1,8]],"date-time":"2018-01-08T17:43:13Z","timestamp":1515433393000},"page":"3555-3564","source":"Crossref","is-referenced-by-count":0,"title":["Two boundary based dispatching rule for on-time delivery and throughput of wafer fabs with dedication constraints"],"prefix":"10.1109","author":[{"given":"Kang H.","family":"Cho","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong H.","family":"Chung","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"You I.","family":"Choung","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sang C.","family":"Park","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Byung H.","family":"Kim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1109\/66.857950","article-title":"A Control Method to Reduce Standard Deviation of Flow Time in Wafer Fabrication","volume":"13","author":"yoon","year":"2000","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2014.11.012"},{"journal-title":"Reduction of average cycle time at a wafer fabrication facility","year":"2001","author":"subhash","key":"ref33"},{"key":"ref32","first-page":"379","article-title":"Load Balancing Among Photolithography Machines in the Semiconductor Manufacturing System","volume":"24","author":"shr","year":"2008","journal-title":"Journal of Information Science and Engineering"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-36594-7_36"},{"key":"ref30","first-page":"170","article-title":"A Load Balancing Scheduling Approach for Dedicated Machine Constraint","author":"shr","year":"2006","journal-title":"Proceedings of the 8th International Conference on Enterprise Information Systems ICEIS 2006"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.04.008"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1080\/00207540601085919"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-004-2431-x"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/IEMT.1992.639903"},{"journal-title":"Impact of Lot Dedication on the Performance of the FAB","year":"2001","author":"kidambi","key":"ref10"},{"key":"ref11","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1109\/70.964660","article-title":"Production Scheduling in a Semiconductor Wafer Fabrication Facility Producing Multiple Product Types with Distinct Due Dates","volume":"17","author":"kim","year":"2001","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/66.661295"},{"key":"ref13","first-page":"4103","article-title":"Simulation Based Planning & Scheduling System: MOZART&#x00AE;","author":"ko","year":"2013","journal-title":"Proceedings of the Winter Simulation Conference"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/66.4384"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1080\/00207540701369213"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2001.977436"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1080\/07408170208928860"},{"key":"ref18","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1109\/66.484296","article-title":"Minimum Inventory Variability Schedule with Applications in Semiconductor Fabrication","volume":"9","author":"li","year":"1996","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1080\/09537280500110623"},{"key":"ref28","first-page":"3","article-title":"Bottleneck Management Strategies in Semiconductor Wafer Fabrication Facilities","author":"shirley","year":"2011","journal-title":"Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2003.815201"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2006.04.002"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2016.7822310"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1109\/TSM.2004.840535","article-title":"Dynamic Load Balancing Among Multiple Fabrication Lines Through Estimation of Minimum Inter-Operation Time","volume":"18","author":"hiroyasu","year":"2005","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"ref29","first-page":"750","article-title":"A Heuristic Load Balancing Scheduling Approach for Dedicated Machine Constraint","author":"shr","year":"2006","journal-title":"Proceedings of the 19th International Conference on Industrial Engineering & Other Applications of Applied Intelligent Systems(IEA\/AIE&#x2019;06)"},{"journal-title":"Measurement and improvement of manufacturing capacities (MIMAC) Final report","year":"1995","author":"fowler","key":"ref5"},{"key":"ref8","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1109\/66.999607","article-title":"Understanding a Semiconductor Process using a Full-Scale Model","volume":"15","author":"jerald","year":"2002","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"ref7","first-page":"69","article-title":"An Integer Linear Programming Approach for Dedicated Machine Constraint","author":"huy","year":"2008","journal-title":"Proceedings of the Seventh IEEE\/ACIS International Conference on Computer and Information Science"},{"key":"ref2","first-page":"1986","article-title":"An Optimization Approach for Parallel Machine Problems with Dedication Constraints: Combining Simulation and Capacity Planning","author":"andreas","year":"2011","journal-title":"Proceedings of the 2011 Winter Simulation Conference"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/0278-6125(93)90344-S"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/66.909654"},{"key":"ref20","article-title":"A Fuzzy Scheduling System for Dedicated Machine Constraint","author":"liu","year":"2006","journal-title":"Proceedings of the 2006 Joint Conference on Information Sciences"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/9.106156"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/66.311341"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2001.977430"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2005.858472"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/ICIS.2008.48"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721743"}],"event":{"name":"2017 Winter Simulation Conference (WSC)","start":{"date-parts":[[2017,12,3]]},"location":"Las Vegas, NV","end":{"date-parts":[[2017,12,6]]}},"container-title":["2017 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8232982\/8247314\/08248069.pdf?arnumber=8248069","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,9]],"date-time":"2019-10-09T00:13:33Z","timestamp":1570580013000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8248069\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":39,"URL":"https:\/\/doi.org\/10.1109\/wsc.2017.8248069","relation":{},"subject":[],"published":{"date-parts":[[2017,12]]}}}