{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,15]],"date-time":"2026-03-15T02:44:28Z","timestamp":1773542668963,"version":"3.50.1"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1109\/wsc.2017.8248080","type":"proceedings-article","created":{"date-parts":[[2018,1,8]],"date-time":"2018-01-08T17:43:13Z","timestamp":1515433393000},"page":"3679-3690","source":"Crossref","is-referenced-by-count":5,"title":["Scheduling strategy of semiconductor production lines with remaining cycle time prediction"],"prefix":"10.1109","author":[{"given":"Li","family":"Li","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qingyun","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/ASMC.2011.5898218"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ISSM.2005.1513369"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2011.2118775"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.3724\/SP.J.1004.2009.00807"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721749"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022521428870"},{"key":"ref4","first-page":"493","article-title":"Research on Dynamic Dispatching Rule for Semiconductor Assembly Production Line","author":"haizan","year":"2012","journal-title":"Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/ICNSC.2014.6819600"},{"key":"ref6","article-title":"A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory","author":"wu","year":"2014","journal-title":"Mathematical Problems in Engineering 2013"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2014.7020102"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/CSCWD.2012.6221901"},{"key":"ref7","first-page":"1545","article-title":"Difference Priority Algorithm in Semiconductor Scheduling Problems","author":"yu","year":"2014","journal-title":"Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management"},{"key":"ref2","doi-asserted-by":"crossref","first-page":"1891","DOI":"10.1007\/s00170-012-4468-6","article-title":"Data-based Scheduling Framework and Adaptive Dispatching Rule of Complex Manufacturing Systems","volume":"66","author":"li","year":"2012","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2002.807743"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/CSCWD.2012.6221902"}],"event":{"name":"2017 Winter Simulation Conference (WSC)","location":"Las Vegas, NV","start":{"date-parts":[[2017,12,3]]},"end":{"date-parts":[[2017,12,6]]}},"container-title":["2017 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8232982\/8247314\/08248080.pdf?arnumber=8248080","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,9]],"date-time":"2019-10-09T00:13:22Z","timestamp":1570580002000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8248080\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/wsc.2017.8248080","relation":{},"subject":[],"published":{"date-parts":[[2017,12]]}}}