{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,11,19]],"date-time":"2024-11-19T17:26:24Z","timestamp":1732037184219},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1109\/wsc.2017.8248084","type":"proceedings-article","created":{"date-parts":[[2018,1,8]],"date-time":"2018-01-08T17:43:13Z","timestamp":1515433393000},"page":"3714-3725","source":"Crossref","is-referenced-by-count":4,"title":["Robustness analysis of an MIP for production areas with time constraints and tool interruptions in semiconductor manufacturing"],"prefix":"10.1109","author":[{"given":"Christian","family":"Maleck","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gerald","family":"Weigert","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Detlef","family":"Pabst","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marcel","family":"Stehli","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1002\/9781118307656"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ISSE.2017.8000944"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/70.678447"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1201\/CHBIOSTATIS"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721724"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1287\/moor.1.2.117"},{"key":"ref3","article-title":"Production Scheduling with Queue-Time Constraints: Alternative Formulations","author":"cho","year":"2014","journal-title":"Proceedings of the 2014 Industrial and Systems Engineering Research Conference"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-54439-2"},{"key":"ref5","article-title":"Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey","author":"graham","year":"1979","journal-title":"Annals of Discrete Mathematics Volume 5 of Discrete Optimization II 287326 Proceedings of the Advanced Research Institute on Discrete Optimization and Systems Applications of the Systems Science Panel of NATO and of the Discrete Optimization Symposium co-sponsored by IBM Canada and SIAM Banff Aha"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2012.6465235"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-8348-1994-9"},{"key":"ref2","first-page":"2007","author":"brucker","year":"0","journal-title":"Scheduling Algorithms"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4614-7894-2"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/IWACI.2011.6160098"}],"event":{"name":"2017 Winter Simulation Conference (WSC)","start":{"date-parts":[[2017,12,3]]},"location":"Las Vegas, NV","end":{"date-parts":[[2017,12,6]]}},"container-title":["2017 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8232982\/8247314\/08248084.pdf?arnumber=8248084","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,2,5]],"date-time":"2018-02-05T17:33:17Z","timestamp":1517851997000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8248084\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/wsc.2017.8248084","relation":{},"subject":[],"published":{"date-parts":[[2017,12]]}}}