{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,24]],"date-time":"2026-01-24T19:35:44Z","timestamp":1769283344562,"version":"3.49.0"},"reference-count":18,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,12]]},"DOI":"10.1109\/wsc.2018.8632290","type":"proceedings-article","created":{"date-parts":[[2019,2,5]],"date-time":"2019-02-05T02:10:15Z","timestamp":1549332615000},"page":"2025-2036","source":"Crossref","is-referenced-by-count":8,"title":["MACHINE LEARNING BASED CONSTRUCTION SIMULATION AND OPTIMIZATION"],"prefix":"10.1109","author":[{"given":"Kailun","family":"Feng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shiwei","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Weizhuo","family":"Lu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/MHS.1995.494215"},{"issue":"4","key":"ref2","first-page":"2813","article-title":"Cost-loaded Production Model for Planning and Control","volume":"8","author":"Fischer","year":"1999","journal-title":"Durability of Building Materials and Components"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:2(174)"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1061\/9780784413135.030"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.10.108"},{"issue":"4","key":"ref6","first-page":"04015097-1-12","article-title":"Discrete Event Simulation Analysis of Product and Process Platforms: A Bridge Construction Case Study","volume":"142","author":"Larsson","year":"2015","journal-title":"Journal of Construction Engineering and Management"},{"key":"ref7","volume-title":"Simulation Modelling and Analysis","author":"Law","year":"2007"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.enbuild.2016.12.030"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.04.001"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.enbuild.2013.07.033"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)62138-6"},{"key":"ref12","volume-title":"Provincial Greenhouse Gas Inventory Guidelines","year":"2011"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1108\/13598541011068260"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.11.021"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.11.097"},{"issue":"3","key":"ref16","first-page":"1","article-title":"A Simulation-optimization Approach for the Consideration of Well Clogging During In-situ Bioremediation System Cost Estimation","volume":"23","author":"Yadav","year":"2017","journal-title":"Journal of Hydraulic Engineering"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.artmed.2017.10.002"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2003.12.005"}],"event":{"name":"2018 Winter Simulation Conference (WSC)","location":"Gothenburg, Sweden","start":{"date-parts":[[2018,12,9]]},"end":{"date-parts":[[2018,12,12]]}},"container-title":["2018 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8625401\/8632166\/08632290.pdf?arnumber=8632290","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,1,24]],"date-time":"2024-01-24T00:26:03Z","timestamp":1706055963000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8632290\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12]]},"references-count":18,"URL":"https:\/\/doi.org\/10.1109\/wsc.2018.8632290","relation":{},"subject":[],"published":{"date-parts":[[2018,12]]}}}