{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T01:15:53Z","timestamp":1740100553217,"version":"3.37.3"},"reference-count":40,"publisher":"IEEE","license":[{"start":{"date-parts":[[2021,12,12]],"date-time":"2021-12-12T00:00:00Z","timestamp":1639267200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2021,12,12]],"date-time":"2021-12-12T00:00:00Z","timestamp":1639267200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021,12,12]]},"DOI":"10.1109\/wsc52266.2021.9715426","type":"proceedings-article","created":{"date-parts":[[2022,2,23]],"date-time":"2022-02-23T20:38:43Z","timestamp":1645648723000},"page":"1-12","source":"Crossref","is-referenced-by-count":1,"title":["Evaluating Supply-And Reverse Logistics Alternatives in Building Construction Using Simulation"],"prefix":"10.1109","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2297-2906","authenticated-orcid":false,"given":"Christina","family":"Gschwendtner","sequence":"first","affiliation":[{"name":"Chair of Materials Handling, Material Flow, Logistics, Technical University of Munich,Department of Mechanical Engineering,Garching,GERMANY,85748"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2106-3735","authenticated-orcid":false,"given":"Anne","family":"Fischer","sequence":"additional","affiliation":[{"name":"Chair of Materials Handling, Material Flow, Logistics, Technical University of Munich,Department of Mechanical Engineering,Garching,GERMANY,85748"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9941-6596","authenticated-orcid":false,"given":"Johannes","family":"Fottner","sequence":"additional","affiliation":[{"name":"Chair of Materials Handling, Material Flow, Logistics, Technical University of Munich,Department of Mechanical Engineering,Garching,GERMANY,85748"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6392-0371","authenticated-orcid":false,"given":"Iris D.","family":"Tommelein","sequence":"additional","affiliation":[{"name":"University of California,Department of Civil and Environmental Engineering,Berkeley,CA,USA,94720-1712"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.3390\/buildings11030105"},{"journal-title":"Simulation baulogistischer Prozesse im Ausbau [Simulation of Construction Logistics Processes in Outfitting]","year":"2014","author":"voigtmann","key":"ref35"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.24928\/2019\/0226"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1994.717501"},{"journal-title":"Development and Analysis of Process Simulation in Building Construction","year":"2021","author":"gschwendtner","key":"ref15"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2010.5679012"},{"key":"ref14","article-title":"Scenario Simulations for Improved Production Planning in Construction Engineering using Standard Simulation Software","author":"feine","year":"2016","journal-title":"Proceedings of the 16th International Conference on Computing in Civil and Building Engineering"},{"key":"ref36","article-title":"Simulation von Baulogistikprozessen im Ausbau&#x201D; [Simulation of Construction Logistics Processes in Outfitting]","author":"voigtmann","year":"2008","journal-title":"Advances in Simulation for Production and Logistics Applications"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:7(808)"},{"journal-title":"Tecnomatix Plant Simulation Help and Tutorial","year":"2019","key":"ref30"},{"journal-title":"&#x201C;Entwicklung eines Berechnungsmodells zur Simulation und Optimierung der Materiallogistik im Hochbau&#x201D; [Development of a Calculation Model for the Simulation and Optimization of Material Logistics in Building Construction]","year":"2020","author":"dengler","key":"ref11"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.24928\/2020\/0076"},{"journal-title":"Construction Logistics Models for Consolidation","year":"2004","key":"ref10"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1007\/s12159-013-0105-5"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1080\/014461998372420"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000220"},{"key":"ref17","article-title":"Takt Time Planning: Lessons for Construction Industry from a Cruise Ship Cabin Refurbishment Case Study","author":"heinonen","year":"2016","journal-title":"24th Annual Conference of the International Group for Lean Construction"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00034-7"},{"key":"ref16","first-page":"181","article-title":"Logistics Centers to Support Project-Based Production in the Construction Industry","author":"hamzeh","year":"2007","journal-title":"15th Annual Conference of the International Group for Lean Construction"},{"journal-title":"Simulation von Logistikprozessen auf Baustellen auf Basis von 3D-CAD Daten [Simulation of Logistics Processes on Construction Sites based on 3D CAD Data]","year":"2007","author":"weber","key":"ref38"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.05.029"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1177\/0734242X15584842"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1002\/bate.199902650"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1108\/17260531311309152"},{"key":"ref26","first-page":"198","article-title":"Lean logistics: Helping to Create Value by Bringing People, Information, Plant, Equipment and Materials Together at the Workface","author":"mossman","year":"2007","journal-title":"Proceedings of the 15th Annual Conference of the International Group of Lean Construction"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:11(1212)"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1145\/256562.256959"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000604"},{"key":"ref21","article-title":"CAD-integrierte Modellierung von agentenbasierten Simulationsmodellen f&#x00FC;r die Bauablaufsimulation im Hochbau","author":"kugler","year":"2012","journal-title":"CAD-integrated Modeling of Agent-Based Simulation Models for Construction Process Simulation in Structural Engineering"},{"key":"ref28","first-page":"63","article-title":"The Role of Conceptual Modeling in Lean Construction Simulation","author":"poshdar","year":"2016","journal-title":"Proceedings of the 24th Annual Conference of the International Group for Lean Construction"},{"key":"ref27","first-page":"11","article-title":"Simulation von Unikatprozessen - Herausforderung fiir kommerzielle Simulationswerkzeuge&#x201D; [Simulation of unique Processes - Challenges for Commercial Simulation Tools]","author":"pitsch","year":"2011","journal-title":"Simulation von Unikatprozessen"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.24928\/2018\/0414"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721695"},{"key":"ref7","first-page":"1","article-title":"Enabling Real Time Simulation of Architecture, Engineering, Construction, and Facility Management (AEC\/FM) Systems: a Review of Formalism, Model Architecture, and Data Representation","volume":"20","author":"behzadan","year":"2015","journal-title":"Journal of Information Technology in Construction"},{"key":"ref9","first-page":"29","article-title":"Kostensenkung durch ein zentrales Logistikmanagement&#x201D; [Cost Reduction through Centralized Logistics Management]","author":"boenert","year":"2006","journal-title":"Baulogistik - Konzepte f&#x00FC;r eine bessere Ver- und Entsorgung im Bauwesen"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/JERA.29.118"},{"key":"ref3","article-title":"Lean Supply Systems in Construction","author":"arbulu","year":"2004","journal-title":"The 12th Annual Conference in the International Group for Lean Construction"},{"key":"ref6","first-page":"501","article-title":"Performing Scenario Simulations in Construction by using Standard Software","author":"bargst\u00e4dt","year":"2015","journal-title":"Modern Production Logistics and Simulation"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001654"},{"key":"ref40","first-page":"537","article-title":"Methodik f&#x00FC;r ein simulationsgest&#x00FC;tztes logistikintegriertes Projektmanagement im Anlagenbau&#x201D; [Methodology for Simulation-based Logistics-integrated Project Management in Plant Construction]","author":"wenzel","year":"2013","journal-title":"Simulation in Produktion und Logistik"}],"event":{"name":"2021 Winter Simulation Conference (WSC)","start":{"date-parts":[[2021,12,12]]},"location":"Phoenix, AZ, USA","end":{"date-parts":[[2021,12,15]]}},"container-title":["2021 Winter Simulation Conference (WSC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9715283\/9715284\/09715426.pdf?arnumber=9715426","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,1]],"date-time":"2023-02-01T19:59:46Z","timestamp":1675281586000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9715426\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,12,12]]},"references-count":40,"URL":"https:\/\/doi.org\/10.1109\/wsc52266.2021.9715426","relation":{},"subject":[],"published":{"date-parts":[[2021,12,12]]}}}