{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,6]],"date-time":"2024-09-06T04:22:57Z","timestamp":1725596577372},"reference-count":10,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"},{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,9]]},"DOI":"10.1109\/eem.2019.8916499","type":"proceedings-article","created":{"date-parts":[[2019,11,29]],"date-time":"2019-11-29T12:45:16Z","timestamp":1575031516000},"page":"1-5","source":"Crossref","is-referenced-by-count":0,"title":["Investigation on the Relation between the Level of Wind and PV Generation and the Contracted and Mobilized FRR and RR Reserves in Portugal"],"prefix":"10.1109","author":[{"given":"Goncalo","family":"Barrias","sequence":"first","affiliation":[]},{"given":"Joao Tome","family":"Saraiva","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.888963"},{"key":"ref3","article-title":"A Comprehensive Assessment of Markets for Frequency and Voltage Control Ancillary Services","author":"rebours","year":"2008","journal-title":"PhD Thesis School of Electrical and Electronic Engineering University of Manchester"},{"journal-title":"Results for the Secondary and Tertiary Reserves Technical Constraints Imbalances and Cross Border Balancing","year":"0","key":"ref10"},{"year":"0","key":"ref6","article-title":"Operation Procedures no. 3.3, 3.9, 7.1, 7.2, 7.3 and 7.4 for management of deviations, primary, secondary and tertiary reserves and voltage control"},{"key":"ref5","article-title":"Ancillary Service Provision by RES and DSM Connected at Distribution Level in the Future Power System","author":"merino","year":"0","journal-title":"Technical Report D1 1 SmartNet Tecnalia"},{"year":"0","key":"ref8","article-title":"Ancillary Services Report 2017"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/EEM.2016.7521345"},{"journal-title":"P1 &#x2013; Policy 1 Load-Frequency Control and Performance","year":"2009","key":"ref2"},{"journal-title":"Manual of Procedures for the Global Management of the System (in Portuguese)","year":"2014","key":"ref9"},{"key":"ref1","article-title":"Investigation on the aFRR and RR Contracted and Mobilized Reserves in Portugal Mainland and Analysis of their Relation with the Wind and PV Generation in 2016 (in Portuguese)","author":"barrias","year":"2018","journal-title":"MSc Thesis Faculty of Engineering of University of Porto"}],"event":{"name":"2019 16th International Conference on the European Energy Market (EEM)","start":{"date-parts":[[2019,9,18]]},"location":"Ljubljana, Slovenia","end":{"date-parts":[[2019,9,20]]}},"container-title":["2019 16th International Conference on the European Energy Market (EEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8907675\/8916211\/08916499.pdf?arnumber=8916499","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,19]],"date-time":"2022-07-19T20:25:21Z","timestamp":1658262321000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8916499\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/eem.2019.8916499","relation":{},"subject":[],"published":{"date-parts":[[2019,9]]}}}