{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T06:00:52Z","timestamp":1730268052055,"version":"3.28.0"},"reference-count":22,"publisher":"IEEE","license":[{"start":{"date-parts":[[2021,8,15]],"date-time":"2021-08-15T00:00:00Z","timestamp":1628985600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2021,8,15]],"date-time":"2021-08-15T00:00:00Z","timestamp":1628985600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021,8,15]]},"DOI":"10.1109\/induscon51756.2021.9529450","type":"proceedings-article","created":{"date-parts":[[2021,9,10]],"date-time":"2021-09-10T21:35:46Z","timestamp":1631309746000},"page":"31-37","source":"Crossref","is-referenced-by-count":1,"title":["Active Power Saturation for Full-Scale Renewable Power Converters during Voltage Ride Through Operation"],"prefix":"10.1109","author":[{"given":"Rafael M.","family":"Silva","sequence":"first","affiliation":[{"name":"Federal University of Minas Gerais (UFMG),Graduate Program in Electrical Engineering,Belo Horizonte,MG,Brazil"}]},{"given":"Clodualdo V.","family":"Sousa","sequence":"additional","affiliation":[{"name":"Federal University of Itajub&#x00E1; (Unifei),Graduate Program in Electrical Engineering,Itabira,MG,Brazil"}]},{"given":"Victor F.","family":"Mendes","sequence":"additional","affiliation":[{"name":"Federal University of Minas Gerais (UFMG),Graduate Program in Electrical Engineering,Belo Horizonte,MG,Brazil"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2012.2191306"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2014.2347266"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2016.2522511"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2017.2733481"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1049\/iet-pel.2017.0210"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2018.2792478"},{"key":"ref16","first-page":"3449","article-title":"Current reference strategy with explicit negative sequence component for voltage equalization contribution during asymmetric fault ride through","volume":"25","author":"c\u00e9sar","year":"2014","journal-title":"Int Trans Electr Energy Syst"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2012.2185016"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/19.481350"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2020.106279"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2007.899914"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1049\/iet-pel.2015.0804"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/IECON.2011.6119490"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2009.2014650"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2010.2070081"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2010.2052289"},{"journal-title":"REE","article-title":"Requisitos de respuesta trente a huecos de tensi&#x00F3;n de las instalaciones e&#x00F3;lica","year":"2006","key":"ref2"},{"journal-title":"ONS","article-title":"Requisitos t&#x00E9;cnico m&#x00ED;nimos para a conex&#x00E3;o &#x00E0;s instala&#x00E7;&#x00F5;es de transmiss&#x00E3;o","year":"2015","key":"ref1"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/ECCE.2010.5617794"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2018.10.014"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1049\/ip-epa:20060008"},{"key":"ref21","first-page":"1","article-title":"New positive-sequence voltage detector for grid synchronization of power converters under faulty grid conditions","author":"rodr\u00edguez","year":"2006","journal-title":"2006 37th IEEE Power Electronics Specialists Conference PESC"}],"event":{"name":"2021 14th IEEE International Conference on Industry Applications (INDUSCON)","start":{"date-parts":[[2021,8,15]]},"location":"S\u00e3o Paulo, Brazil","end":{"date-parts":[[2021,8,18]]}},"container-title":["2021 14th IEEE International Conference on Industry Applications (INDUSCON)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9529350\/9529354\/09529450.pdf?arnumber=9529450","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,8,3]],"date-time":"2022-08-03T00:18:51Z","timestamp":1659485931000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9529450\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,8,15]]},"references-count":22,"URL":"https:\/\/doi.org\/10.1109\/induscon51756.2021.9529450","relation":{},"subject":[],"published":{"date-parts":[[2021,8,15]]}}}