{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T03:25:57Z","timestamp":1729653957128,"version":"3.28.0"},"reference-count":25,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1109\/isatp.2005.1511465","type":"proceedings-article","created":{"date-parts":[[2006,10,4]],"date-time":"2006-10-04T10:52:00Z","timestamp":1159959120000},"page":"150-155","source":"Crossref","is-referenced-by-count":0,"title":["A hybrid constraint approach for a real batch sizing and job sequencing problem"],"prefix":"10.1109","author":[{"given":"N.","family":"Gomes","sequence":"first","affiliation":[]},{"given":"Z.","family":"Vale","sequence":"additional","affiliation":[]},{"given":"C.","family":"Ramos","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.1007\/s002910050098"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-48035-8_51"},{"journal-title":"Complex Sequencing Problems and Local Search Heuristics","year":"1996","author":"hurink","key":"18"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1080\/002075498193679"},{"key":"16","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/S0377-2217(96)90056-9","article-title":"Multi-level, single-machine lot sizing and scheduling (with initial inventory)","volume":"89","author":"alf","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1016\/0166-218X(93)90085-3"},{"journal-title":"Genetic Algorithms and Scheduling Problems","year":"1992","author":"mason","key":"14"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1016\/0167-6377(85)90011-2"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1007\/BF02248589"},{"key":"21","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-51649-8","article-title":"Deterministic lot sizing models for production planning","author":"salomon","year":"1991","journal-title":"Lecture Notes in Economics and Mathematical Systems"},{"key":"20","article-title":"ACAEP, A CLP based tool for the JOB Sequencing","author":"gomes","year":"1998","journal-title":"Proc 16th Workshop UK Planning Scheduling Special Interest Group"},{"key":"22","article-title":"A CLP model to the job sequencing problem","author":"gomes","year":"1997","journal-title":"Proceedings of the 6th Portuguese Conference on Artificial Intelligence"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.1016\/0895-7177(94)90127-9"},{"journal-title":"Modelling Machine Set-up Time Exclusion Constraints","year":"1995","author":"simonis","key":"24"},{"key":"25","article-title":"Hybrid constraint algorithm for the maintenance scheduling of electric power units","author":"gomes","year":"2003","journal-title":"Proceedings of Intelligent System Application to Power Systems"},{"key":"3","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","author":"baptiste","year":"2001","journal-title":"Constraint-based Scheduling Applying Constraints to Scheduling Problems"},{"key":"2","article-title":"Survey of job shop scheduling techniques","author":"jones","year":"1998","journal-title":"NISTIR"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-45193-8_65"},{"journal-title":"Introduction to Sequencing and Scheduling","year":"1974","author":"baker","key":"1"},{"key":"7","article-title":"Hybrid methods for the maintenance scheduling of generating units problems","author":"gomes","year":"2004","journal-title":"ICKEDS'04"},{"key":"6","article-title":"On integrating constraint propagation and linear programming for combinatorial optimization","author":"hooker","year":"1999","journal-title":"AAAI-99"},{"journal-title":"ECLiPSe A Platform for Constraint Logic Programming","year":"1997","author":"wallace","key":"5"},{"key":"4","first-page":"69","article-title":"Constraint-based scheduling: An introduction for newcomers","author":"barta?k","year":"2003","journal-title":"Intelligent Manufacturing Systems"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-8917-8_9"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.14.4.295.2828"}],"event":{"name":"(ISATP 2005). The 6th IEEE International Symposium on Assembly and Task Planning: From Nano to Macro Assembly and Manufacturing, 2005.","location":"Montreal, Quebec, Canada"},"container-title":["(ISATP 2005). The 6th IEEE International Symposium on Assembly and Task Planning: From Nano to Macro Assembly and Manufacturing, 2005."],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/10101\/32361\/01511465.pdf?arnumber=1511465","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,17]],"date-time":"2017-06-17T05:51:50Z","timestamp":1497678710000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/1511465\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/isatp.2005.1511465","relation":{},"subject":[]}}