{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,28]],"date-time":"2025-10-28T18:19:42Z","timestamp":1761675582871,"version":"3.28.0"},"reference-count":16,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007,7]]},"DOI":"10.1109\/pct.2007.4538393","type":"proceedings-article","created":{"date-parts":[[2008,6,10]],"date-time":"2008-06-10T20:28:46Z","timestamp":1213129726000},"page":"651-656","source":"Crossref","is-referenced-by-count":7,"title":["Using an OPF like Approach to Define the Operational Strategy of a Wind Park under a System Operator Control"],"prefix":"10.1109","author":[{"given":"C.F.","family":"Moyano","sequence":"first","affiliation":[]},{"given":"J.A. Pecas","family":"Lopes","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2005.859975"},{"key":"ref11","first-page":"194","article-title":"Modeling and control of a wind turbine driven doubly fed induction generator. Energy Conversion","volume":"18","author":"tapia","year":"2003","journal-title":"IEEE Transactions on"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/PICA.2001.932368"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20040385"},{"key":"ref14","article-title":"Adjusted OPF Solution Using Parameterized Model, Automation and Control Magazine - Brazilian Automation Society","volume":"17","author":"moyano","year":"2006"},{"key":"ref15","article-title":"New versions of nonlinear interior point methods applied to the optimal power flow","author":"castronuovo","year":"2002","journal-title":"Proc IEEE T&D Latin"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/59.496200"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2002.1009481"},{"key":"ref3","first-page":"119","volume":"7","author":"pinson","year":"2004","journal-title":"On-line assessment of prediction risk for wind power production forecasts Wind Energy"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/PESW.2002.985021"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2005.05.011"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20040581"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20050264"},{"journal-title":"Royal Decree 436\/2004","article-title":"Establishing the Methodology to Update and Organize the Legal and Economic Procedures for Electricity Generation Belonging to the Special Regime","year":"2004","key":"ref2"},{"key":"ref9","article-title":"Optimum Generation Control in Wind Parks When Carrying Out System Operator Requests","volume":"21","author":"de almeida","year":"2006","journal-title":"IEEE Transactions on Power Systems"},{"key":"ref1","article-title":"How to Prepare a Power System for 12% Wind Energy Penetration: The Portuguese Case Study","author":"estanqueiro","year":"2006","journal-title":"Nordic Wind Power Conference"}],"event":{"name":"2007 IEEE Power Tech","start":{"date-parts":[[2007,7,1]]},"location":"Lausanne, Switzerland","end":{"date-parts":[[2007,7,5]]}},"container-title":["2007 IEEE Lausanne Power Tech"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4534843\/4538278\/04538393.pdf?arnumber=4538393","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,16]],"date-time":"2017-03-16T17:53:31Z","timestamp":1489686811000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/4538393\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,7]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/pct.2007.4538393","relation":{},"subject":[],"published":{"date-parts":[[2007,7]]}}}