{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,7]],"date-time":"2026-07-07T14:35:38Z","timestamp":1783434938305,"version":"3.54.6"},"reference-count":86,"publisher":"Elsevier BV","issue":"27","license":[{"start":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T00:00:00Z","timestamp":1761955200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T00:00:00Z","timestamp":1761955200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T00:00:00Z","timestamp":1773619200000},"content-version":"vor","delay-in-days":135,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computer-Aided Civil and Infrastructure Engineering"],"published-print":{"date-parts":[[2025,11]]},"DOI":"10.1111\/mice.70100","type":"journal-article","created":{"date-parts":[[2025,10,21]],"date-time":"2025-10-21T08:13:13Z","timestamp":1761034393000},"page":"4774-4796","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":3,"title":["Probabilistic risk assessment framework for cost overruns predictions in infrastructure projects using randomized simulations"],"prefix":"10.1016","volume":"40","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5399-3582","authenticated-orcid":false,"given":"Rubina","family":"Canesi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7233-6935","authenticated-orcid":false,"given":"Laura","family":"Gabrielli","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7379-2884","authenticated-orcid":false,"given":"Giuliano","family":"Marella","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1071-3269","authenticated-orcid":false,"given":"Aurora Greta","family":"Ruggeri","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1111\/mice.70100_bb0010","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(450)","article-title":"Scheduling\/cost optimization and neural dynamics model for construction","volume":"123","author":"Adeli","year":"1997","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.1111\/mice.70100_bb0015","series-title":"Construction scheduling, cost optimization and management","author":"Adeli","year":"2001"},{"issue":"1","key":"10.1111\/mice.70100_bb0020","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1061\/(ASCE)0733-9364(1998)124:1(18)","article-title":"Regularization neural network for construction cost estimation","volume":"124","author":"Adeli","year":"1998","journal-title":"Journal of Construction Engineering and Management"},{"issue":"5","key":"10.1111\/mice.70100_bb0025","doi-asserted-by":"crossref","first-page":"1121","DOI":"10.1108\/IJMPB-07-2019-0175","article-title":"Cost\u2010risk contingency framework for managing cost overrun in metropolitan projects: Using fuzzy\u2010AHP and simulation","volume":"13","author":"Afzal","year":"2020","journal-title":"International Journal of Managing Projects in Business"},{"issue":"2","key":"10.1111\/mice.70100_bb0030","doi-asserted-by":"crossref","first-page":"487","DOI":"10.3390\/buildings14020487","article-title":"Modeling the causes and mitigation measures for cost overruns in building construction: The case of higher education projects","volume":"14","author":"Alhammadi","year":"2024","journal-title":"Buildings"},{"issue":"22","key":"10.1111\/mice.70100_bb0035","doi-asserted-by":"crossref","DOI":"10.3390\/app142210711","article-title":"Building information modeling impact on cost overrun risk factors and interrelationships","volume":"14","author":"Alnaser","year":"2024","journal-title":"Applied Sciences"},{"key":"10.1111\/mice.70100_bb0040","unstructured":"ANAC. (2021). Dataset BDNCP in open contracting data standard (OCDS). Connecting Europe Favility of EU and eNEIDE project. https:\/\/dati.anticorruzione.it\/opendata\/ocds_it"},{"key":"10.1111\/mice.70100_bb0045","unstructured":"ANAC. (2022). Linee Guida n. 9. Attuazione del DL 18 aprile 2016, n. 50. Monitoraggio delle amministrazioni aggiudicatrici sull'attivit\u00e0 dell'operatore economico nei contratti di partenariato pubblico privato. Aggiornamento 06\u201027\u20102022, Autorit\u00e0 Nazionale Anticorruzione."},{"key":"10.1111\/mice.70100_bb0050","unstructured":"ANAC. (2024). Cruscotto Appalti. Focus indicatori. https:\/\/anac\u2010c1.board.com\/#\/screen\/?capsulePath=Cruscotti\/IndicatoriAppalti.bcps&screenId=999deb39\u2010140f\u20104d64\u20108be5\u2010915f94b7b144&showMenu=false"},{"key":"10.1111\/mice.70100_bb0055","unstructured":"ANAC. (2025). Open Data Contratti Pubblici\u2014Italia\u2019, dataset disponibile su portale open data ANAC, utilizzato anche da ANCE. Portale dati aperti ANAC (Contratti pubblici). https:\/\/dati.anticorruzione.it\/opendata\/ocds_en"},{"issue":"6","key":"10.1111\/mice.70100_bb0060","doi-asserted-by":"crossref","first-page":"139","DOI":"10.3390\/infrastructures10060139","article-title":"Quantitative risk analysis framework for cost and time estimation in road infrastructure projects","volume":"10","author":"Ariza Flores","year":"2025","journal-title":"Infrastructures"},{"issue":"1","key":"10.1111\/mice.70100_bb0065","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1108\/IJMPB-09-2018-0177","article-title":"Cost overruns of public sector construction projects: A developing country perspective","volume":"13","author":"Asiedu","year":"2020","journal-title":"International Journal of Managing Projects in Business"},{"issue":"3","key":"10.1111\/mice.70100_bb0070","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1108\/JEDT-06-2019-0160","article-title":"Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo","volume":"18","author":"Asiedu","year":"2020","journal-title":"Journal of Engineering, Design and Technology"},{"issue":"3","key":"10.1111\/mice.70100_bb0075","doi-asserted-by":"crossref","first-page":"142","DOI":"10.1016\/0263-7863(83)90018-2","article-title":"Cost\u2010relevance analysis for overrun control","volume":"1","author":"Avotos","year":"1983","journal-title":"International Journal of Project Management"},{"key":"10.1111\/mice.70100_bb0080","series-title":"Risk analysis in engineering and economics","article-title":"Risk analysis in engineering and economics","author":"Ayyub","year":"2003"},{"issue":"4","key":"10.1111\/mice.70100_bb0085","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/S0263-7863(02)00017-0","article-title":"Modelling global risk factors affecting construction cost performance","volume":"21","author":"Baloi","year":"2003","journal-title":"International Journal of Project Management"},{"key":"10.1111\/mice.70100_bb0090","unstructured":"Banca d'Italia. (2011). Le infrastrutture in Italia: Dotazione, programmazione, realizzazione. https:\/\/www.bancaditalia.it\/pubblicazioni\/collana\u2010seminari\u2010convegni\/2011\u20100007\/7_infrastrutture_italia.pdf"},{"key":"10.1111\/mice.70100_bb0095","unstructured":"Banca d'Italia. (2025). Banca dati\u2014Titoli di Stato italiani: Rendimenti e prezzi (BTP, CCT, BOT). Serie storiche statistiche. Banca d'Italia. Banca d'Italia\u2014Banche dati statistiche (bancaditalia.it). https:\/\/infostat.bancaditalia.it\/inquiry\/home?spyglass\/taxo:CUBESET=&ITEMSELEZ=&OPEN=false\/&ep:LC=IT&COMM=BANKITALIA&ENV=LIVE&CTX=DIFF&IDX=1&\/view:CUBEIDS=BMK0100"},{"issue":"8","key":"10.1111\/mice.70100_bb0100","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1111\/mice.12279","article-title":"Predicting cost escalation pathways and deviation severities of infrastructure projects using risk\u2010based econometric models and Monte Carlo simulation","volume":"32","author":"Bhargava","year":"2017","journal-title":"Computer\u2010Aided Civil and Infrastructure Engineering"},{"key":"10.1111\/mice.70100_bb0105","doi-asserted-by":"crossref","unstructured":"Bordat, C., McCullouch, B., & Sinha, K. (2004). An analysis of cost overruns and time delays of INDOT projects. Report FHWA\/IN\/JTRP\u20102004\/07. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University.","DOI":"10.5703\/1288284313134"},{"issue":"2","key":"10.1111\/mice.70100_bb0110","doi-asserted-by":"crossref","first-page":"293","DOI":"10.2495\/SAFE-V6-N2-293-300","article-title":"Using Monte Carlo simulation to mitigate the risk of project cost overruns","volume":"6","author":"Bouayed","year":"2016","journal-title":"International Journal of Safety and Security Engineering"},{"issue":"3\u20104","key":"10.1111\/mice.70100_bb0115","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1002\/cend.201900014","article-title":"Calculation of risk costs in construction projects","volume":"1","author":"Brokbals","year":"2019","journal-title":"Civil Engineering Design"},{"key":"10.1111\/mice.70100_bb0120","doi-asserted-by":"crossref","unstructured":"Bruzzone, F., Cavallaro, F., & Nocera, S. (2023). Comparison of preliminary, initial, and final construction costs of Italian high\u2010speed railways. In F. Pagliara (Ed.), Socioeconomic Impacts of high\u2010speed rail system. IW\u2010HSR 2022. (pp. 39\u201357). Springer International Publishing. Springer, Cham. https:\/\/doi.org\/10.1007\/978\u20103\u2010031\u201026340\u20108_3","DOI":"10.1007\/978-3-031-26340-8_3"},{"key":"10.1111\/mice.70100_bb0125","unstructured":"Busetti, F., et\u00a0al. (2019). Questioni di Economia e Finanza. Capitale e investimenti pubblici in Italia: Effetti macroeconomici, misurazione e debolezze regolamentari. https:\/\/www.sipotra.it\/wp\u2010content\/uploads\/2019\/10\/Capitale\u2010e\u2010investimenti\u2010pubblici\u2010in\u2010Italia\u2010effetti\u2010macroeconomici\u2010misurazione\u2010e\u2010debolezze\u2010regolamentari.pdf"},{"issue":"9","key":"10.1111\/mice.70100_bb0130","doi-asserted-by":"crossref","first-page":"3015","DOI":"10.3390\/buildings14093015","article-title":"A fuzzy logic application to manage construction\u2010cost escalation","volume":"14","author":"Canesi","year":"2024","journal-title":"Buildings"},{"issue":"1","key":"10.1111\/mice.70100_bb0135","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1061\/(ASCE)CO.1943-7862.0001207","article-title":"New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks","volume":"143","author":"Chang","year":"2017","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.1111\/mice.70100_bb0140","unstructured":"CNI. (2018). Onorari professionali e pareri di congruit\u00e0: Indicazioni del CNI. Circolare CNI (Consiglio Nazionale Ingegneri). n. 258, 4 luglio 2018. CNI."},{"key":"10.1111\/mice.70100_bb0145","unstructured":"Commissioni Provinciali Espropri. (2025). Valori Agricoli Medi (VAM)\u2014annualit\u00e0 2010\u20132025, Regione del Veneto\u2019, Bilancio\/Bollettini ufficiali pubblicati sul Bollettino Ufficiale della Regione del Veneto (BURV). Bollettino Ufficiale della Regione del Veneto\u2014BURV (sezione VAM). https:\/\/bur.regione.veneto.it\/BurvServices\/pubblica\/DettaglioAvviso.aspx?id=552539"},{"key":"10.1111\/mice.70100_bb0150","unstructured":"Confartigianato Imprese. (2021). STUDI\u2014Tempi per appalti in Italia. https:\/\/www.confartigianato.it\/2021\/01\/studi\u2010tempi\u2010per\u2010appalti\u2010in\u2010italia\u2010375\u2010rispetto\u2010a\u2010ue\u201027\u2010il\u2010543\u2010del\u2010tempo\u2010per\u2010passaggi\u2010burocratici\/"},{"key":"10.1111\/mice.70100_bb0155","doi-asserted-by":"crossref","unstructured":"Eke, G., & Elgy, J. (2017). Testing the value of best value: Evidence from educational facilities projects. IGLC 2017\u2013Proceedings of the 25th Annual Conference of the International Group for Lean Construction, Crete, Greece (pp. 19\u201326). https:\/\/doi.org\/10.24928\/2017\/0090","DOI":"10.24928\/2017\/0090"},{"issue":"2","key":"10.1111\/mice.70100_bb0160","doi-asserted-by":"crossref","first-page":"241","DOI":"10.3846\/13923730.2015.1068846","article-title":"Measuring the impact of lean construction practices on project duration and variability: A simulation\u2010based study on residential buildings","volume":"23","author":"Erol","year":"2017","journal-title":"Journal of Civil Engineering and Management"},{"key":"10.1111\/mice.70100_bb0165","unstructured":"European Central Bank. (2025). MIR\u2014MFI interest rate statistics: Composite indicator of average interest rates on new business loans to non\u2010financial corporations in Italy. ECB Data Portal\u2014MIR dataset. ECB Data Portal (MIR data for Italy). https:\/\/data.ecb.europa.eu\/data\/datasets\/MIR\/data\u2010information"},{"key":"10.1111\/mice.70100_bb0170","unstructured":"European Commission. (2023). Report on large transport infrastructure projects in the EU\u2014implementation of projects and monitoring and control of EU funds. https:\/\/www.europarl.europa.eu\/doceo\/document\/A\u20109\u20102023\u20100181_EN.html"},{"key":"10.1111\/mice.70100_bb0175","unstructured":"Eurostat. (2024). Harmonized Index of Consumer Prices (HICP)\u2014Energy for Italy (base 2015 = 100). Eurostat. Eurostat HICP energy database. https:\/\/ec.europa.eu\/eurostat\/web\/hicp\/database"},{"key":"10.1111\/mice.70100_bb0180","doi-asserted-by":"crossref","DOI":"10.1016\/j.apenergy.2025.126496","article-title":"Cost analysis comparison of reference and near\u2010zero energy office building design in Indonesia: A life cycle approach and its sensitivity analysis","volume":"399","author":"Fajar","year":"2025","journal-title":"Applied Energy"},{"key":"10.1111\/mice.70100_bb0185","unstructured":"Falorsi, P., & Alleva, G. (2009). Indicatori e modelli statistici per la valutazione degli squilibri territoriali. Milano: Franco Angeli CN\u2014QA (Economia\u00a0; 720). http:\/\/digital.casalini.it\/9788856818376"},{"key":"10.1111\/mice.70100_bb0190","doi-asserted-by":"crossref","unstructured":"Ford, K.M., Arman, M.H.R., Labi, S., Sinha, K.C., Thompson, P.D., Shirole, A.M., & Li, Z. (2012). Estimating life expectancies of highway assets (Vol. 2). The National Academies Press. https:\/\/doi.org\/10.17226\/22783","DOI":"10.17226\/22783"},{"issue":"6","key":"10.1111\/mice.70100_bb0195","doi-asserted-by":"crossref","first-page":"1248","DOI":"10.3390\/land12061248","article-title":"Location, location, location\u201d: Fluctuations in real estate market values after COVID\u201019 and the war in Ukraine based on econometric and spatial analysis, random forest, and multivariate regression","volume":"12","author":"Gabrielli","year":"2023","journal-title":"Land"},{"issue":"10","key":"10.1111\/mice.70100_bb0200","doi-asserted-by":"crossref","first-page":"1107","DOI":"10.1080\/15623599.2023.2252288","article-title":"Causes of time and cost overruns in construction projects: a scoping review","volume":"24","author":"G\u00f3mez\u2010Cabrera","year":"2024","journal-title":"International Journal of Construction Management"},{"key":"10.1111\/mice.70100_bb0205","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1016\/j.enconman.2018.03.043","article-title":"Techno\u2010economic analysis of a solar photovoltaic\/thermal (PV\/T) concentrator for building application in Sweden using Monte Carlo method","volume":"165","author":"Gu","year":"2018","journal-title":"Energy Conversion and Management"},{"key":"10.1111\/mice.70100_bb0210","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1016\/j.ejpoleco.2014.01.010","article-title":"Do local governments do it better? Analysis of time performance in the execution of public works","volume":"34","author":"Guccio","year":"2014","journal-title":"European Journal of Political Economy"},{"issue":"16","key":"10.1111\/mice.70100_bb0215","doi-asserted-by":"crossref","first-page":"5506","DOI":"10.3390\/app10165506","article-title":"Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis","volume":"10","author":"Herrera","year":"2020","journal-title":"Applied Sciences (Switzerland)"},{"issue":"10","key":"10.1111\/mice.70100_bb0220","doi-asserted-by":"crossref","first-page":"2798","DOI":"10.1016\/j.enbuild.2011.06.034","article-title":"Uncertainty analysis in building performance simulation for design support","volume":"43","author":"Hopfe","year":"2011","journal-title":"Energy and Buildings"},{"issue":"5","key":"10.1111\/mice.70100_bb0225","doi-asserted-by":"crossref","first-page":"93","DOI":"10.3390\/infrastructures8050093","article-title":"Minimizing cost overrun in rail projects through 5D\u2010BIM: A systematic literature review","volume":"8","author":"Hussain","year":"2023","journal-title":"Infrastructures"},{"issue":"3","key":"10.1111\/mice.70100_bb0230","first-page":"243","article-title":"Factors for time and cost overrun in public projects","volume":"11","author":"Idrees","year":"2021","journal-title":"Journal of Engineering, Project, and Production Management"},{"issue":"1","key":"10.1111\/mice.70100_bb0235","doi-asserted-by":"crossref","first-page":"13","DOI":"10.31940\/logic.v22i1.13-21","article-title":"Risk analysis of investment costs in PPP projects using Monte Carlo simulation","volume":"22","author":"Iqbal","year":"2022","journal-title":"Logic: Jurnal Rancang Bangun dan Teknologi"},{"issue":"8","key":"10.1111\/mice.70100_bb0240","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1061\/(ASCE)CO.1943-7862.0002327","article-title":"A coupled genetic programming Monte Carlo simulation\u2013based model for cost overrun prediction of thermal power plant projects","volume":"148","author":"Islam","year":"2022","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.1111\/mice.70100_bb0245","unstructured":"ISTAT. (2024). Indici dei costi di costruzione di un fabbricato residenziale (base 2021 = 100): Serie storica e dati medi annui. Nota informativa. 28 marzo 2024. ISTAT. https:\/\/www.istat.it\/wp\u2010content\/uploads\/2024\/03\/NotaInformativa_PPC_28\u2010marzo_2024.pdf"},{"key":"10.1111\/mice.70100_bb0250","unstructured":"ITACA. (2023). Dimensione, dinamica e caratteristiche della disarticolazione regionale del mercato dei contratti pubblici. https:\/\/www.itaca.org\/nuovosito\/primopiano.asp?id=599"},{"issue":"12","key":"10.1111\/mice.70100_bb0255","doi-asserted-by":"crossref","first-page":"2173","DOI":"10.3390\/buildings12122173","article-title":"Estimating construction project duration and costs upon completion using Monte Carlo simulations and improved earned value management","volume":"12","author":"Jie","year":"2022","journal-title":"Buildings"},{"issue":"4","key":"10.1111\/mice.70100_bb0260","first-page":"1","article-title":"Uncertainties\u2010based potential time and cost overrun assessment while planning a hydropower project","volume":"8","author":"Kansal","year":"2022","journal-title":"ASCE\u2010ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering"},{"issue":"3","key":"10.1111\/mice.70100_bb0265","first-page":"408","article-title":"Application of Monte Carlo simulation and PERT\/CPM techniques in planning of construction projects: A case study","volume":"5","author":"Karabulut","year":"2017","journal-title":"Periodicals of Engineering and Natural Sciences"},{"key":"10.1111\/mice.70100_bb0270","series-title":"Risk, uncertainty, and profit","author":"Knight","year":"1921"},{"key":"10.1111\/mice.70100_bb0275","doi-asserted-by":"crossref","DOI":"10.1016\/j.evalprogplan.2024.102436","article-title":"Examining the causes and effects of time overruns in construction projects promoted by rural municipalities in Nepal","volume":"105","author":"Koirala","year":"2024","journal-title":"Evaluation and Program Planning"},{"issue":"4","key":"10.1111\/mice.70100_bb0280","doi-asserted-by":"crossref","first-page":"2291","DOI":"10.1080\/13467581.2022.2116940","article-title":"Comparative analysis of managers\u2019 perception in overseas construction project risks and cost overrun in actual cases: A perspective of the Republic of Korea","volume":"22","author":"Lee","year":"2023","journal-title":"Journal of Asian Architecture and Building Engineering"},{"issue":"10","key":"10.1111\/mice.70100_bb0285","doi-asserted-by":"crossref","first-page":"67","DOI":"10.35940\/ijmh.J0965.0641020","article-title":"Estimation of rate and time delay for underground Mumbai metro corridor by using Monte Carlo simulation","volume":"4","author":"Lowe","year":"2020","journal-title":"International Journal of Management and Humanities"},{"issue":"3","key":"10.1111\/mice.70100_bb0290","doi-asserted-by":"crossref","first-page":"2022","DOI":"10.1108\/ECAM-07-2023-0774","article-title":"Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks","volume":"32","author":"Madihi","year":"2025","journal-title":"Engineering, Construction and Architectural Management"},{"key":"10.1111\/mice.70100_bb0295","unstructured":"Mattera, G., et\u00a0al. (2023). Do local court inefficiencies delay public works\u00a0? Evidence from Italian municipalities. OECD Regional Development Papers, 43, OECD. https:\/\/dx.doi.org\/10.1787\/fe4dd331\u2010en"},{"issue":"2","key":"10.1111\/mice.70100_bb0300","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1680\/jinam.21.00004","article-title":"Modelling the uncertainty of cost and time in highway projects","volume":"9","author":"Moghayedi","year":"2022","journal-title":"Infrastructure Asset Management"},{"key":"10.1111\/mice.70100_bb0305","doi-asserted-by":"crossref","DOI":"10.1016\/j.tust.2024.106013","article-title":"Probabilistic time estimation of tunnels constructed with multiple headings","volume":"153","author":"Mohammadi","year":"2024","journal-title":"Tunnelling and Underground Space Technology"},{"issue":"10","key":"10.1111\/mice.70100_bb0310","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1061\/(ASCE)CO.1943-7862.0001161","article-title":"Construction cost and duration uncertainty model: Application to high\u2010speed rail line project","volume":"142","author":"Moret","year":"2016","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"10.1111\/mice.70100_bb0315","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1108\/BEPAM-01-2023-0027","article-title":"Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam","volume":"14","author":"Nguyen","year":"2024","journal-title":"Built Environment Project and Asset Management"},{"issue":"2","key":"10.1111\/mice.70100_bb0320","first-page":"163","article-title":"Risk consideration and cost estimation in construction projects using Monte Carlo simulation","volume":"10","author":"Peleskei","year":"2015","journal-title":"Management (18544223)"},{"issue":"19","key":"10.1111\/mice.70100_bb0325","doi-asserted-by":"crossref","DOI":"10.3390\/su131910563","article-title":"Adequate housing and COVID\u201019: Assessing the potential for value creation through the project","volume":"13","author":"Quaglio","year":"2021","journal-title":"Sustainability"},{"issue":"2","key":"10.1111\/mice.70100_bb0330","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1038\/jes.2008.13","article-title":"Separation of uncertainty and interindividual variability in human exposure modeling","volume":"19","author":"Ragas","year":"2009","journal-title":"Journal of Exposure Science and Environmental Epidemiology"},{"issue":"1","key":"10.1111\/mice.70100_bb0335","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1080\/15623599.2023.2210476","article-title":"Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran)","volume":"24","author":"Rezaee Arjroody","year":"2024","journal-title":"International Journal of Construction Management"},{"issue":"1","key":"10.1111\/mice.70100_bb0340","doi-asserted-by":"crossref","first-page":"36","DOI":"10.4038\/faruj.v11i1.312","article-title":"Simulation modelling of cost overruns in building projects: A panel data analysis","volume":"11","author":"Sachchithananthan","year":"2024","journal-title":"FARU Journal"},{"issue":"6","key":"10.1111\/mice.70100_bb0345","doi-asserted-by":"crossref","first-page":"624","DOI":"10.1080\/15623599.2024.2344892","article-title":"An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects","volume":"25","author":"Sadat","year":"2024","journal-title":"International Journal of Construction Management"},{"issue":"4","key":"10.1111\/mice.70100_bb0350","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1111\/j.1467-8667.2009.00632.x","article-title":"Fuzzy Monte Carlo simulation and risk assessment in construction","volume":"25","author":"Sadeghi","year":"2010","journal-title":"Computer\u2010Aided Civil and Infrastructure Engineering"},{"key":"10.1111\/mice.70100_bb0355","doi-asserted-by":"crossref","DOI":"10.1016\/j.compind.2020.103227","article-title":"An approach based on Bayesian network for improving project management maturity: An application to reduce cost overrun risks in engineering projects","volume":"119","author":"Sanchez","year":"2020","journal-title":"Computers in Industry"},{"issue":"18","key":"10.1111\/mice.70100_bb0360","doi-asserted-by":"crossref","first-page":"2852","DOI":"10.3390\/math12182852","article-title":"Predicting extension of time and increasing contract price in road infrastructure projects using a sugeno fuzzy logic model","volume":"12","author":"Seni\u0107","year":"2024","journal-title":"Mathematics"},{"issue":"3","key":"10.1111\/mice.70100_bb0365","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1061\/JPSEA2.PSENG-1382","article-title":"Analyzing contingency cost risks in a pipeline EPC project using a Monte Carlo simulation","volume":"14","author":"Sihombing","year":"2023","journal-title":"Journal of Pipeline Systems Engineering and Practice"},{"key":"10.1111\/mice.70100_bb0370","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1016\/j.enbuild.2014.03.001","article-title":"Uncertainty analysis of user behaviour and physical parameters in residential building performance simulation","volume":"76","author":"Silva","year":"2014","journal-title":"Energy and Buildings"},{"issue":"3","key":"10.1111\/mice.70100_bb0375","doi-asserted-by":"crossref","first-page":"1044","DOI":"10.3390\/app12031044","article-title":"Project risk in the context of construction schedules\u2014Combined Monte Carlo simulation and time at risk (TaR) approach: Insights from the Fort Bema Housing estate complex","volume":"12","author":"Sobieraj","year":"2022","journal-title":"Applied Sciences"},{"key":"10.1111\/mice.70100_bb0380","doi-asserted-by":"crossref","DOI":"10.1016\/j.erss.2025.104057","article-title":"Beyond economies of scale: Learning from construction cost overrun risks and time delays in global energy infrastructure projects","volume":"123","author":"Sovacool","year":"2025","journal-title":"Energy Research & Social Science"},{"issue":"3","key":"10.1111\/mice.70100_bb0385","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1108\/JPIF-11-2019-0144","article-title":"Cost overruns and delays in infrastructure projects: The case of Stuttgart 21","volume":"39","author":"Steininger","year":"2020","journal-title":"Journal of Property Investment & Finance"},{"key":"10.1111\/mice.70100_bb0390","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.rser.2018.05.029","article-title":"A review of uncertainty analysis in building energy assessment","volume":"93","author":"Tian","year":"2018","journal-title":"Renewable and Sustainable Energy Reviews"},{"key":"10.1111\/mice.70100_bb0395","doi-asserted-by":"crossref","DOI":"10.1016\/j.frl.2022.103236","article-title":"Short\u2010run impact of the Ukrainian refugee crisis on the housing market in Poland","volume":"50","author":"Trojanek","year":"2022","journal-title":"Finance Research Letters"},{"issue":"5","key":"10.1111\/mice.70100_bb0400","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1061\/(ASCE)ME.1943-5479.0001064","article-title":"Project risk costs: Estimation overruns caused when using only expected value for contingency calculations","volume":"38","author":"Vegas\u2010Fern\u00e1ndez","year":"2022","journal-title":"Journal of Management in Engineering"},{"key":"10.1111\/mice.70100_bb0405","series-title":"Risk analysis: A quantitative guide","author":"Vose","year":"2008"},{"issue":"1","key":"10.1111\/mice.70100_bb0410","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1111\/j.1467-8667.2007.00520.x","article-title":"Re: Influence of rate stability on project cost simulation","volume":"23","author":"Wang","year":"2008","journal-title":"Computer\u2010Aided Civil and Infrastructure Engineering"},{"key":"10.1111\/mice.70100_bb0415","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.rser.2012.12.014","article-title":"A review of sensitivity analysis methods in building energy analysis","volume":"20","author":"Wei","year":"2013","journal-title":"Renewable and Sustainable Energy Reviews"},{"issue":"PD","key":"10.1111\/mice.70100_bb0420","article-title":"Financial feasibility analysis for different retrofit strategies on an institutional building","volume":"52","author":"Youssefi","year":"2022","journal-title":"Sustainable Energy Technologies and Assessments"},{"issue":"4","key":"10.1111\/mice.70100_bb0425","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/j.ijproman.2007.05.012","article-title":"Assessing risk and uncertainty inherent in Chinese highway projects using AHP","volume":"26","author":"Zayed","year":"2008","journal-title":"International journal of project management"},{"issue":"3","key":"10.1111\/mice.70100_bb0430","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1111\/j.1539-6924.2005.00620.x","article-title":"Quantitative analysis of variability and uncertainty with known measurement error: Methodology and case study","volume":"25","author":"Zheng","year":"2005","journal-title":"Risk Analysis"},{"key":"10.1111\/mice.70100_bb0435","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1016\/j.enbuild.2012.08.039","article-title":"A comparison of deterministic and probabilistic life cycle cost analyses of ground source heat pump (GSHP) applications in hot and humid climate","volume":"55","author":"Zhu","year":"2012","journal-title":"Energy and Buildings"}],"container-title":["Computer-Aided Civil and Infrastructure Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1093968726015239?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S1093968726015239?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/pdf\/10.1111\/mice.70100","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T09:22:49Z","timestamp":1773652969000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S1093968726015239"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,11]]},"references-count":86,"journal-issue":{"issue":"27","published-print":{"date-parts":[[2025,11]]}},"alternative-id":["S1093968726015239"],"URL":"https:\/\/doi.org\/10.1111\/mice.70100","relation":{},"ISSN":["1093-9687"],"issn-type":[{"value":"1093-9687","type":"print"}],"subject":[],"published":{"date-parts":[[2025,11]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Probabilistic risk assessment framework for cost overruns predictions in infrastructure projects using randomized simulations","name":"articletitle","label":"Article Title"},{"value":"Computer-Aided Civil and Infrastructure Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1111\/mice.70100","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2025 The Author(s). Computer\u2010Aided Civil and Infrastructure Engineering published by Wiley Periodicals LLC on behalf of Editor. Published by Elsevier Inc.","name":"copyright","label":"Copyright"}]}}