{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T05:20:10Z","timestamp":1734499210969,"version":"3.30.2"},"reference-count":21,"publisher":"ASME International","issue":"2","content-domain":{"domain":["asmedigitalcollection.asme.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2004,6,1]]},"abstract":"<jats:p>A CAD assembly model is a collection of components, comprised recursively of various levels of individual parts and sub-assembly models. Although the overall geometry in the CAD assembly model accurately represents the final finished product, this model is often meaningless from a manufacturing planning and simulation point of view. The grouping of the components into sub-assemblies and the assembly sequence implied by the CAD model does not accurately represent the manufacturing\/assembly sequence or process. Reordering, regrouping, and modifying existing sub-assemblies, or creating new sub-assemblies in the CAD model may be needed to ensure this correspondence for simulation or assembly planning tools that derive the manufacturing sequence directly from the CAD system. Although this task can be performed using the existing functionality of the CAD system, it quickly becomes unwieldy for large industry-grade models due to the assembly constraints and relationships in place during the model creation. In industry today, there are several digital mockup and assembly planning tools that greatly outstrip the ability of CAD systems in loading complete models and creating assembly plans. Methods to organize the CAD model assembly quickly and easily for use in these systems, and to record the \u201cas manufactured\u201d assembly in the CAD data format are needed to close the loop and ease the transfer, storage, and maintenance of model data between the CAD systems, PDM systems, and these new age planning and mockup systems. In this paper, a new hybrid method is proposed to provide this functionality. Of key significance is the fact that using this approach, polygonal representations of any new or modified sub-assemblies designated in the reorganized hierarchy can be produced and that the original constraints used in the original assembly are transformed in a consistent manner to the new components. In addition, corresponding property files for the new components can be created for use in the assembly planning tool. In order to validate this hybrid approach, the time required to rearrange the assembly hierarchy and output the required information using both methods are compared\u20131) the traditional method using the CAD system alone, and 2) the new hybrid system. A statistical analysis using three treatment factors indicates that if the number of components is more than 15, then it is far more efficient to use the hybrid method over the CAD system by itself. This hybrid method implementation has now been used very successfully in virtual assembly simulations of many industry models, some with several hundred components, provided by various industry partners.<\/jats:p>","DOI":"10.1115\/1.1737772","type":"journal-article","created":{"date-parts":[[2004,5,28]],"date-time":"2004-05-28T22:01:28Z","timestamp":1085781688000},"page":"98-108","update-policy":"https:\/\/doi.org\/10.1115\/crossmarkpolicy-asme","source":"Crossref","is-referenced-by-count":15,"title":["Reorganizing CAD Assembly Models (as-Designed) for Manufacturing Simulations and Planning (as-Built)"],"prefix":"10.1115","volume":"4","author":[{"given":"Uma","family":"Jayaram","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"YoungJun","family":"Kim","sequence":"additional","affiliation":[{"name":"VRCIM laboratory, School of Mechanical and Materials Engineering"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sankar","family":"Jayaram","sequence":"additional","affiliation":[{"name":"VRCIM laboratory, School of Mechanical and Materials Engineering"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Venkata K.","family":"Jandhyala","sequence":"additional","affiliation":[{"name":"Department of Statistics, Washington State University, Pullman, WA\u200999164-2920"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tatsuki","family":"Mitsui","sequence":"additional","affiliation":[{"name":"Komatsu Ltd. Japan"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"33","published-online":{"date-parts":[[2004,5,28]]},"reference":[{"key":"2019100610360377500_r1","doi-asserted-by":"crossref","unstructured":"Jayaram, S., Jayaram, U., Wang, Y., Tirumali, H., Lyons, K., and Hart, P., 1999, \u201cVADE: A Virtual Assembly Design Environment,\u201d IEEE Comput. Graphics Appl., 19(6), pp. 44\u201350.","DOI":"10.1109\/38.799739"},{"key":"2019100610360377500_r2","doi-asserted-by":"crossref","unstructured":"Kim, G. J., Lee, S., and Bekey, G. A., 1996, \u201cInterleaving Assembly Planning and Design,\u201d IEEE J. Rob. Autom., 12(2), pp. 246\u2013251.","DOI":"10.1109\/70.488944"},{"key":"2019100610360377500_r3","doi-asserted-by":"crossref","unstructured":"Zha, X. F., and Du, H., 2002, \u201cA PDES\/STEP-based Model and System for Concurrent Integrated Design and Assembly Planning,\u201d Comput.-Aided Des., 34(14), pp. 1087\u20131110.","DOI":"10.1016\/S0010-4485(01)00186-5"},{"key":"2019100610360377500_r4","doi-asserted-by":"crossref","unstructured":"Gupta, S. K., Paredis, C. J., and Sinha, R., 2001, \u201cIntelligent Assembly Modeling and Simulation,\u201d Assembly Automation, 21(3), pp. 215\u2013235.","DOI":"10.1108\/01445150110399151"},{"key":"2019100610360377500_r5","doi-asserted-by":"crossref","unstructured":"Hsu, S., Lee, G. S. G., and Su, S. F., 1992, \u201cFeedback Evaluation of Assembly Plans,\u201d Proc. of IEEE International Conference of Robotics and Automation, Nice, France, pp. 2419\u20132424.","DOI":"10.1109\/ROBOT.1992.220102"},{"key":"2019100610360377500_r6","doi-asserted-by":"crossref","unstructured":"Pu, P., 1992, \u201cAn Assembly Sequence Generation Algorithm using Case-based Search Techniques,\u201d Proc. of the IEEE International Conference on Robotics and Automation, pp. 2425\u20132430.","DOI":"10.1109\/ROBOT.1992.220101"},{"key":"2019100610360377500_r7","doi-asserted-by":"crossref","unstructured":"Romney, B., Godard, C., Goldwasser, M., and Ramkumar, G., 1995, \u201cAn Efficient System for Geometric Assembly Sequence Generation and Evaluation,\u201d In Proceedings of the 15th ASME International Computers in Engineering Conference (CIE), Boston, Massachusetts, pp. 699\u2013712.","DOI":"10.1115\/CIE1995-0800"},{"key":"2019100610360377500_r8","doi-asserted-by":"crossref","unstructured":"Wolter, J., 1992, \u201cMating Constraint Languages for Assembly Sequence Planning,\u201d Proc. of the IEEE International Conference on Robotics and Automation, Nice, France, pp. 2367\u20132374.","DOI":"10.1109\/ROBOT.1992.220109"},{"key":"2019100610360377500_r9","doi-asserted-by":"crossref","unstructured":"Wilson, R. , 1995, \u201cTwo-Handed Assembly Sequencing,\u201d Int. J. Robot. Res., 14(4), pp. 335\u2013350.","DOI":"10.1177\/027836499501400403"},{"key":"2019100610360377500_r10","doi-asserted-by":"crossref","unstructured":"Fujimoto, H., and Sebaaly, M. F., 2000, \u201cA New Sequence Evolution Approach to Assembly Planning,\u201d J. Manuf. Sci. Eng., 122, pp. 198\u2013205.","DOI":"10.1115\/1.538897"},{"key":"2019100610360377500_r11","doi-asserted-by":"crossref","unstructured":"Lazzerini, B., Marcelloni, F., Dini, G., and Failli, F., 1999, \u201cAssembly Planning Based on Genetic Algorithms,\u201d Fuzzy Information Processing Society, NAFIPS. 18th International Conference of the North American, pp. 482\u2013486.","DOI":"10.1109\/NAFIPS.1999.781740"},{"key":"2019100610360377500_r12","doi-asserted-by":"crossref","unstructured":"Chen, S., and Liu, Y., 2001, \u201cAn Adaptive Genetic Assembly Sequence Planner,\u201d International Journal of Computer Integrated Manufacturing, 14, pp. 489\u2013500.","DOI":"10.1080\/09511920110034987"},{"key":"2019100610360377500_r13","doi-asserted-by":"crossref","unstructured":"Smith, S. S. F., Smith, G. G., and Xiaoyun, Liao, 2001, \u201cAutomatic Stable Assembly Sequence Generation and Evaluation,\u201d J. Manuf. Syst., 20, pp. 225\u2013235.","DOI":"10.1016\/S0278-6125(01)80043-1"},{"key":"2019100610360377500_r14","unstructured":"Banerjee, P., 1998, \u201cVirtual Manufacturing,\u201d 1998 Yearbook of Science and Technology, McGraw-Hill, New York."},{"key":"2019100610360377500_r15","unstructured":"Guan, Q., Liu, J., Zhong, Y., and Zhou, J., 2001, \u201cDesign for Assembly System under Virtual Environment,\u201d Journal of Computer Aided Design and Computer Graphics, 13, pp. 514\u2013520."},{"key":"2019100610360377500_r16","doi-asserted-by":"crossref","unstructured":"Ye, N., Banerjee, P., Banerjee, A., and Dech, F., 1999, \u201cA Comparative Study of Assembly Planning in Traditional and Virtual Environments,\u201d IEEE Trans. Syst. Man Cybern., Part C, 29, pp. 546\u2013555.","DOI":"10.1109\/5326.798768"},{"key":"2019100610360377500_r17","doi-asserted-by":"crossref","unstructured":"Sun, H., and Hujun, B., 2002, \u201cTwo-handed Assembly with Immersive Task Planning in Virtual Reality,\u201d Virtual Reality (UK), 6, pp. 11\u201320.","DOI":"10.1007\/BF01408565"},{"key":"2019100610360377500_r18","unstructured":"Mitsui, T., 2000, \u201cApplying Virtual Reality to the Manufacturing Process of Large Press Machines,\u201d Thesis, Washington State University, Pullman, WA."},{"key":"2019100610360377500_r19","doi-asserted-by":"crossref","unstructured":"Taylor, F., Jayaram, S., Jayaram, U., and Mitsui, T., 2000, \u201cFunctionality to Facilitate Assembly of Heavy Machines in a Virtual Environment,\u201d Proc. Design Engineering Technical Conferences, Baltimore, Maryland.","DOI":"10.1115\/DETC2000\/CIE-14590"},{"key":"2019100610360377500_r20","unstructured":"Wang, Y., 1998, \u201cPhysically Based Modeling in Virtual Assembly,\u201d Ph.D. Dissertation, Washington State University, Pullman, WA."},{"key":"2019100610360377500_r21","doi-asserted-by":"crossref","unstructured":"Wang, Y., Jayaram, U., Jayaram, S., and Imtiyaz, S., 2003, \u201cMethods and Algorithms for Constraint-base Virtual Assembly,\u201d Virtual Reality, 6(4), pp. 229\u2013243.","DOI":"10.1007\/s10055-003-0106-9"}],"container-title":["Journal of Computing and Information Science in Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/asmedigitalcollection.asme.org\/computingengineering\/article-pdf\/4\/2\/98\/5553187\/98_1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"http:\/\/asmedigitalcollection.asme.org\/computingengineering\/article-pdf\/4\/2\/98\/5553187\/98_1.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,12,17]],"date-time":"2024-12-17T05:49:28Z","timestamp":1734414568000},"score":1,"resource":{"primary":{"URL":"https:\/\/asmedigitalcollection.asme.org\/computingengineering\/article\/4\/2\/98\/445297\/Reorganizing-CAD-Assembly-Models-asDesigned-for"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,5,28]]},"references-count":21,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2004,6,1]]}},"URL":"https:\/\/doi.org\/10.1115\/1.1737772","relation":{},"ISSN":["1530-9827","1944-7078"],"issn-type":[{"type":"print","value":"1530-9827"},{"type":"electronic","value":"1944-7078"}],"subject":[],"published":{"date-parts":[[2004,5,28]]}}}