{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,30]],"date-time":"2026-07-30T09:16:11Z","timestamp":1785402971374,"version":"3.56.0"},"reference-count":40,"publisher":"ASME International","issue":"3","license":[{"start":{"date-parts":[[2024,12,13]],"date-time":"2024-12-13T00:00:00Z","timestamp":1734048000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.asme.org\/publications-submissions\/publishing-information\/legal-policies"}],"content-domain":{"domain":["asmedigitalcollection.asme.org"],"crossmark-restriction":true},"short-container-title":[],"published-print":{"date-parts":[[2025,3,1]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>The increasing demand for new energy sources in China, coupled with the abundant waste, has prompted the exploration of converting excess renewable energy into hydrogen through electrolyzers. However, the uncertainty surrounding renewable energy supply, its remote distribution, and regional imbalance with demand pose significant challenges for designing and planning an integrated hydrogen supply chain. This paper addresses this challenge by proposing a two-stage robust optimization model based on ellipsoidal uncertainty sets. We derive a robust approximation model and develop an algorithm using generalized Benders decomposition to solve the resulting model. Extensive numerical experiments demonstrate the superior performance of the proposed algorithm compared to CPLEX. Additionally, a case study utilizing real data from China is presented to showcase the practicality and effectiveness of the proposed model. Finally, we draw conclusions and highlight potential avenues for future research.<\/jats:p>","DOI":"10.1115\/1.4067214","type":"journal-article","created":{"date-parts":[[2024,11,21]],"date-time":"2024-11-21T10:23:47Z","timestamp":1732184627000},"update-policy":"https:\/\/doi.org\/10.1115\/crossmarkpolicy-asme","source":"Crossref","is-referenced-by-count":2,"title":["A Robust Model for Hydrogen Supply Chain Network Design in China Under Renewable Energy Uncertainty"],"prefix":"10.1115","volume":"25","author":[{"given":"Jiaqi","family":"Xu","sequence":"first","affiliation":[{"name":"Tsinghua University Department of Industrial Engineering, , , ;","place":["Beijing, China, 100084"]},{"name":"China Waterborne Transport Research Institute Economic Policy and Development Strategy Research Center, , ,","place":["Beijing, China, 100088"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Qiaofeng","family":"Li","sequence":"additional","affiliation":[{"name":"Beijing Jiaotong University School of Systems Science, , ,","place":["Beijing, China, 100044"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Li","family":"Zheng","sequence":"additional","affiliation":[{"id":[{"id":"https:\/\/ror.org\/03cve4549","id-type":"ROR","asserted-by":"publisher"}],"name":"Tsinghua University Department of Industrial Engineering, , ,","place":["Beijing, China, 100084"]},{"name":"Tsinghua University Department of Industrial Engineering, , ,","place":["Beijing, China, 100084"]}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"33","published-online":{"date-parts":[[2024,12,13]]},"reference":[{"issue":"6","key":"2024121313591767400_CIT0001","doi-asserted-by":"publisher","first-page":"060809","DOI":"10.1115\/1.4062545","article-title":"Carbon Neutrality: A Review","volume":"23","author":"He","year":"2023","journal-title":"ASME J. Comput. Inf. Sci. Eng."},{"issue":"2","key":"2024121313591767400_CIT0002","doi-asserted-by":"publisher","first-page":"399","DOI":"10.1016\/j.ejor.2017.10.036","article-title":"Opportunities and Challenges in Sustainable Supply Chain: An Operations Research Perspective","volume":"268","author":"Barbosa-P\u00f3voa","year":"2018","journal-title":"Eur. J. Oper. Res."},{"key":"2024121313591767400_CIT0003","doi-asserted-by":"publisher","first-page":"107128","DOI":"10.1016\/j.cie.2021.107128","article-title":"Industry 4.0 and Demand Forecasting of the Energy Supply Chain: A Literature Review","volume":"154","author":"Roozbeh Nia","year":"2021","journal-title":"Comput. Ind. Eng."},{"key":"2024121313591767400_CIT0004","doi-asserted-by":"publisher","first-page":"342","DOI":"10.1016\/j.rser.2018.12.060","article-title":"Hydrogen Supply Chain Network Design: An Optimization-Oriented Review","volume":"103","author":"Li","year":"2019","journal-title":"Renew. Sustain. Energy Rev."},{"issue":"6","key":"2024121313591767400_CIT0005","doi-asserted-by":"publisher","first-page":"5318","DOI":"10.1016\/j.ijhydene.2011.08.041","article-title":"Models, Methods and Approaches for the Planning and Design of the Future Hydrogen Supply Chain","volume":"37","author":"Dagdougui","year":"2012","journal-title":"Int. J. Hydrogen Energy"},{"issue":"47","key":"2024121313591767400_CIT0006","doi-asserted-by":"publisher","first-page":"24149","DOI":"10.1016\/j.ijhydene.2021.05.025","article-title":"Hydrogen Supply Chain and Challenges in Large-Scale LH2 Storage and Transportation","volume":"46","author":"Ratnakar","year":"2021","journal-title":"Int. J. Hydrogen Energy"},{"key":"2024121313591767400_CIT0007","doi-asserted-by":"publisher","first-page":"108674","DOI":"10.1016\/j.ijpe.2022.108674","article-title":"Renewable Hydrogen Supply Chains: A Planning Matrix and an Agenda for Future Research","volume":"255","author":"Sgarbossa","year":"2023","journal-title":"Int. J. Prod. Econ."},{"issue":"26","key":"2024121313591767400_CIT0008","doi-asserted-by":"publisher","first-page":"11189","DOI":"10.1016\/j.ijhydene.2013.06.071","article-title":"The Importance of Economies of Scale, Transport Costs and Demand Patterns in Optimising Hydrogen Fuelling Infrastructure: An Exploration With SHIPMod (Spatial Hydrogen Infrastructure Planning Model)","volume":"38","author":"Agnolucci","year":"2013","journal-title":"Int. J. Hydrogen Energy"},{"issue":"19","key":"2024121313591767400_CIT0009","doi-asserted-by":"publisher","first-page":"7883","DOI":"10.1016\/j.ijhydene.2009.07.109","article-title":"Design and Operation of a Future Hydrogen Supply Chain: Multi-period Model","volume":"34","author":"Almansoori","year":"2009","journal-title":"Int. J. Hydrogen Energy"},{"issue":"5","key":"2024121313591767400_CIT0010","doi-asserted-by":"publisher","first-page":"3965","DOI":"10.1016\/j.ijhydene.2011.11.091","article-title":"Design and Operation of a Stochastic Hydrogen Supply Chain Network Under Demand Uncertainty","volume":"37","author":"Almansoori","year":"2012","journal-title":"Int. J. Hydrogen Energy"},{"issue":"1","key":"2024121313591767400_CIT0011","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/j.ejor.2013.02.036","article-title":"Design and Dimensioning of Hydrogen Transmission Pipeline Networks","volume":"229","author":"Andr\u00e9","year":"2013","journal-title":"Eur. J. Oper. Res."},{"issue":"13","key":"2024121313591767400_CIT0012","doi-asserted-by":"publisher","first-page":"6789","DOI":"10.1016\/j.ijhydene.2014.02.132","article-title":"Planning Sustainable Hydrogen Supply Chain Infrastructure With Uncertain Demand","volume":"39","author":"Dayhim","year":"2014","journal-title":"Int. J. Hydrogen Energy"},{"issue":"59","key":"2024121313591767400_CIT0013","doi-asserted-by":"publisher","first-page":"34503","DOI":"10.1016\/j.ijhydene.2020.05.276","article-title":"Design of a Sustainable and Reliable Hydrogen Supply Chain Network Under Mixed Uncertainties: A Case Study","volume":"45","author":"Fazli-Khalaf","year":"2020","journal-title":"Int. J. Hydrogen Energy"},{"issue":"18","key":"2024121313591767400_CIT0014","doi-asserted-by":"publisher","first-page":"4715","DOI":"10.1016\/j.ijhydene.2008.06.007","article-title":"Optimization of a Hydrogen Supply Chain Under Demand Uncertainty","volume":"33","author":"Kim","year":"2008","journal-title":"Int. J. Hydrogen Energy"},{"key":"2024121313591767400_CIT0015","doi-asserted-by":"publisher","first-page":"106683","DOI":"10.1016\/j.compchemeng.2019.106683","article-title":"Integrated Optimization Model for Hydrogen Supply Chain Network Design and Hydrogen Fueling Station Planning","volume":"134","author":"Li","year":"2020","journal-title":"Comput. Chem. Eng."},{"issue":"46","key":"2024121313591767400_CIT0016","doi-asserted-by":"publisher","first-page":"16408","DOI":"10.1016\/j.ijhydene.2015.10.015","article-title":"Design of a Hydrogen Supply Chain With Uncertainty","volume":"40","author":"Nunes","year":"2015","journal-title":"Int. J. Hydrogen Energy"},{"issue":"21","key":"2024121313591767400_CIT0017","doi-asserted-by":"publisher","first-page":"17587","DOI":"10.1021\/acssuschemeng.9b02620","article-title":"Optimal Design of a Sustainable Hydrogen Supply Chain Network: Application in an Airport Ecosystem","volume":"7","author":"Ochoa Robles","year":"2019","journal-title":"ACS Sustain. Chem. Eng."},{"key":"2024121313591767400_CIT0018","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.cherd.2017.12.032","article-title":"A Multi-objective Optimization for the Design and Operation of a Hydrogen Network for Transportation Fuel","volume":"131","author":"Ogumerem","year":"2018","journal-title":"Chem. Eng. Res. Des."},{"issue":"1","key":"2024121313591767400_CIT0019","doi-asserted-by":"publisher","first-page":"447","DOI":"10.1016\/j.ijhydene.2015.10.032","article-title":"Optimal Design and Operation of Integrated Wind-Hydrogen-Electricity Networks for Decarbonising the Domestic Transport Sector in Great Britain","volume":"41","author":"Samsatli","year":"2016","journal-title":"Int. J. Hydrogen Energy"},{"key":"2024121313591767400_CIT0020","doi-asserted-by":"publisher","first-page":"114452","DOI":"10.1016\/j.apenergy.2019.114452","article-title":"Design and Optimization of a Hydrogen Supply Chain Using a Centralized Storage Model","volume":"262","author":"Seo","year":"2020","journal-title":"Appl. Energy"},{"issue":"47","key":"2024121313591767400_CIT0021","doi-asserted-by":"publisher","first-page":"25939","DOI":"10.1016\/j.ijhydene.2019.07.218","article-title":"Spatial and Temporal Optimization of Hydrogen Fuel Supply Chain for Light Duty Passenger Vehicles in British Columbia","volume":"44","author":"Talebian","year":"2019","journal-title":"Int. J. Hydrogen Energy"},{"key":"2024121313591767400_CIT0022","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1016\/j.energy.2016.05.123","article-title":"Design of Optimization Model for a Hydrogen Supply Chain Under Emission Constraints\u2014A Case Study of Germany","volume":"111","author":"Almansoori","year":"2016","journal-title":"Energy"},{"key":"2024121313591767400_CIT0023","doi-asserted-by":"publisher","first-page":"106493","DOI":"10.1016\/j.compchemeng.2019.06.018","article-title":"Balancing Costs, Safety and CO2 Emissions in the Design of Hydrogen Supply Chains","volume":"129","author":"Bique","year":"2019","journal-title":"Comput. Chem. Eng."},{"key":"2024121313591767400_CIT0024","doi-asserted-by":"publisher","first-page":"118482","DOI":"10.1016\/j.energy.2020.118482","article-title":"Life-Cycle Energy Consumption and Greenhouse-Gas Emissions of Hydrogen Supply Chains for Fuel-Cell Vehicles in China","volume":"209","author":"Ren","year":"2020","journal-title":"Energy"},{"key":"2024121313591767400_CIT0025","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.compchemeng.2015.05.019","article-title":"A General Spatio-temporal Model of Energy Systems With a Detailed Account of Transport and Storage","volume":"80","author":"Samsatli","year":"2015","journal-title":"Comput. Chem. Eng."},{"key":"2024121313591767400_CIT0026","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/j.apenergy.2017.05.050","article-title":"Seasonal Storage and Alternative Carriers: A Flexible Hydrogen Supply Chain Model (vol 200, 290, 2017)","volume":"256","author":"Reuss","year":"2019","journal-title":"Appl. Energy"},{"issue":"3","key":"2024121313591767400_CIT0027","doi-asserted-by":"publisher","first-page":"1773","DOI":"10.1109\/TSTE.2019.2940604","article-title":"Optimal Investment of Electrolyzers and Seasonal Storages in Hydrogen Supply Chains Incorporated With Renewable Electric Networks","volume":"11","author":"Li","year":"2020","journal-title":"IEEE Trans. Sustain. Energy"},{"issue":"5","key":"2024121313591767400_CIT0028","doi-asserted-by":"publisher","first-page":"2222","DOI":"10.1111\/poms.13674","article-title":"Integrated Production and Renewable Energy Generation in the Presence of Hydrogen Energy Storage","volume":"31","author":"Feng","year":"2022","journal-title":"Prod. Oper. Manage."},{"key":"2024121313591767400_CIT0029","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1016\/j.cherd.2018.03.037","article-title":"An Outlook Towards Hydrogen Supply Chain Networks in 2050-Design of Novel Fuel Infrastructures in Germany","volume":"134","author":"Bique","year":"2018","journal-title":"Chem. Eng. Res. Des."},{"key":"2024121313591767400_CIT0030","doi-asserted-by":"publisher","first-page":"592","DOI":"10.1016\/j.energy.2018.04.089","article-title":"Modelling the Integrated Power and Transport Energy System: The Role of Power-to-Gas and Hydrogen in Long-Term Scenarios for Italy","volume":"154","author":"Colbertaldo","year":"2018","journal-title":"Energy"},{"issue":"4","key":"2024121313591767400_CIT0031","doi-asserted-by":"publisher","first-page":"767","DOI":"10.1287\/trsc.2014.0519","article-title":"Strategic Hydrogen Refueling Station Locations With Scheduling and Routing Considerations of Individual Vehicles","volume":"49","author":"Kang","year":"2015","journal-title":"Transp. Sci."},{"key":"2024121313591767400_CIT0032","first-page":"1","volume-title":"Handbooks in Operations Research and Management Science","author":"Ruszczy\u0144ski","year":"2003"},{"issue":"6","key":"2024121313591767400_CIT0033","doi-asserted-by":"publisher","first-page":"741","DOI":"10.1515\/psr-2020-0052","article-title":"Design of Hydrogen Supply Chains Under Demand Uncertainty\u2014A Case Study of Passenger Transport in Germany","volume":"8","author":"Bique","year":"2023","journal-title":"Phys. Sci. Rev."},{"key":"2024121313591767400_CIT0034","doi-asserted-by":"publisher","first-page":"106853","DOI":"10.1016\/j.compchemeng.2020.106853","article-title":"Optimization of a Hydrogen Supply Chain Network Design Under Demand Uncertainty by Multi-objective Genetic Algorithms","volume":"140","author":"Robles","year":"2020","journal-title":"Comput. Chem. Eng."},{"key":"2024121313591767400_CIT0035","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1109\/TASE.2024.3381449","article-title":"Robust Design of a Green Hydrogen Supply Chain Under Spatiotemporal Imbalance","author":"Xu","year":"2024","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"issue":"36","key":"2024121313591767400_CIT0036","doi-asserted-by":"publisher","first-page":"15982","DOI":"10.1016\/j.ijhydene.2022.03.073","article-title":"Pilot-Scale Hydrogen Energy Utilization System Demonstration: A Commercial Building Case Study on On-Site Green Hydrogen Production and Use","volume":"47","author":"Segawa","year":"2022","journal-title":"Int. J. Hydrogen Energy"},{"issue":"2","key":"2024121313591767400_CIT0037","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1287\/mnsc.1120.1641","article-title":"Robust Solutions of Optimization Problems Affected by Uncertain Probabilities","volume":"59","author":"Ben-Tal","year":"2013","journal-title":"Manage. Sci."},{"issue":"5","key":"2024121313591767400_CIT0038","doi-asserted-by":"publisher","first-page":"772","DOI":"10.1111\/j.1937-5956.2010.01194.x","article-title":"Facility Location: A Robust Optimization Approach","volume":"20","author":"Baron","year":"2011","journal-title":"Prod. Oper. Manage."},{"issue":"9","key":"2024121313591767400_CIT0039","doi-asserted-by":"publisher","first-page":"838","DOI":"10.1080\/0740817X.2016.1167287","article-title":"Risk-Averse Stochastic Unit Commitment With Incomplete Information","volume":"48","author":"Ruiwei Jiang","year":"2016","journal-title":"IIE Trans."},{"issue":"4","key":"2024121313591767400_CIT0040","doi-asserted-by":"publisher","first-page":"1594","DOI":"10.1109\/TSTE.2015.2457917","article-title":"Modeling Dynamic Spatial Correlations of Geographically Distributed Wind Farms and Constructing Ellipsoidal Uncertainty Sets for Optimization-Based Generation Scheduling","volume":"6","author":"Li","year":"2015","journal-title":"IEEE Trans. Sustain. Energy"}],"container-title":["Journal of Computing and Information Science in Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/asmedigitalcollection.asme.org\/computingengineering\/article-pdf\/25\/3\/031001\/7415604\/jcise_25_3_031001.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/asmedigitalcollection.asme.org\/computingengineering\/article-pdf\/25\/3\/031001\/7415604\/jcise_25_3_031001.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,12,13]],"date-time":"2024-12-13T08:59:26Z","timestamp":1734080366000},"score":1,"resource":{"primary":{"URL":"https:\/\/asmedigitalcollection.asme.org\/computingengineering\/article\/25\/3\/031001\/1209811\/A-Robust-Model-for-Hydrogen-Supply-Chain-Network"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,12,13]]},"references-count":40,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2025,3,1]]}},"URL":"https:\/\/doi.org\/10.1115\/1.4067214","relation":{},"ISSN":["1530-9827","1944-7078"],"issn-type":[{"value":"1530-9827","type":"print"},{"value":"1944-7078","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,12,13]]},"article-number":"031001"}}