{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T17:08:42Z","timestamp":1730308122014,"version":"3.28.0"},"reference-count":7,"publisher":"SPIE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,9,8]]},"DOI":"10.1117\/12.2188257","type":"proceedings-article","created":{"date-parts":[[2015,9,8]],"date-time":"2015-09-08T19:34:54Z","timestamp":1441740894000},"page":"960710","source":"Crossref","is-referenced-by-count":6,"title":["JPSS-1 VIIRS pre-launch radiometric performance"],"prefix":"10.1117","volume":"9607","author":[{"given":"Hassan","family":"Oudrari","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jeff","family":"McIntire","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoxiong","family":"Xiong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"James","family":"Butler","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Boryana","family":"Efremova","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiang","family":"Ji","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shihyan","family":"Lee","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tom","family":"Schwarting","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"189","reference":[{"issue":"20","key":"c1","article-title":"NPP\/NPOESS Joint Government SSPR Contractor Calibration and Validation program: system perspective, cooperative strategy and path to NPP","volume":"5549","author":"Lottman","year":"2004"},{"key":"c2","doi-asserted-by":"publisher","DOI":"10.1109\/TGRS.2014.2357678"},{"key":"c3","doi-asserted-by":"crossref","DOI":"10.1109\/IGARSS.2013.6721207","article-title":"VIIRS on-orbit calibration activities and performance","author":"Xiong","year":"2013"},{"article-title":"A robust method for determining quadratic calibration coefficients for VIIRS reflective solar bands","year":"2015","author":"Ji","key":"c4"},{"key":"c5","unstructured":"Joint Polar Satellite System (JPSS) VIIRS Reflective Solar Bands - Performance Verification Report (PVR), Goddard Space Flight Center, Greenbelt, MD, USA, 2011."},{"article-title":"Analysis of JPSS J1 VIIRS Polarization Sensitivity Using the NIST T-SIRCUS","year":"2015","author":"McIntire","key":"c6"},{"article-title":"J1 VIIRS polarization narrative: testing and performance","year":"2015","author":"Waluschka","key":"c7"}],"event":{"name":"SPIE Optical Engineering + Applications","location":"San Diego, California, United States"},"container-title":["SPIE Proceedings","Earth Observing Systems XX"],"original-title":[],"deposited":{"date-parts":[[2018,9,29]],"date-time":"2018-09-29T02:49:04Z","timestamp":1538189344000},"score":1,"resource":{"primary":{"URL":"http:\/\/proceedings.spiedigitallibrary.org\/proceeding.aspx?doi=10.1117\/12.2188257"}},"subtitle":[],"editor":[{"given":"James J.","family":"Butler","sequence":"first","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]},{"given":"Xiaoxiong (Jack)","family":"Xiong","sequence":"additional","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]},{"given":"Xingfa","family":"Gu","sequence":"additional","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]}],"short-title":[],"issued":{"date-parts":[[2015,9,8]]},"references-count":7,"URL":"https:\/\/doi.org\/10.1117\/12.2188257","relation":{},"ISSN":["0277-786X"],"issn-type":[{"type":"print","value":"0277-786X"}],"subject":[],"published":{"date-parts":[[2015,9,8]]}}}