{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,21]],"date-time":"2026-08-21T18:38:03Z","timestamp":1787337483470,"version":"build-2736575974"},"reference-count":14,"publisher":"Society for Industrial & Applied Mathematics (SIAM)","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["SIAM J. Comput."],"published-print":{"date-parts":[[1998,1]]},"abstract":"<jats:p>Consider a system of independent tasks to be scheduled without preemption on a parallel computer. For each task the number of processors required, the execution time, and a weight are known. The problem is to find a schedule with minimum weighted average response time. We present an algorithm called SMART (which stands for scheduling to minimize average response time) for this problem that produces solutions that are within a factor of 8.53 of optimal. To our knowledge this is the first polynomial-time algorithm for the minimum weighted average response time problem that achieves a constant bound. In addition, for the unweighted case (that is, where all the weights are unity) we describe a variant of SMART that produces solutions that are within a factor of 8 of optimal, improving upon the best known bound of 32 for this special case.<\/jats:p>","DOI":"10.1137\/s0097539795286831","type":"journal-article","created":{"date-parts":[[2003,6,11]],"date-time":"2003-06-11T11:12:06Z","timestamp":1055329926000},"page":"237-253","source":"Crossref","is-referenced-by-count":28,"title":["Smart SMART Bounds for Weighted Response Time Scheduling"],"prefix":"10.1137","volume":"28","author":[{"given":"Uwe","family":"Schwiegelshohn","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Walter","family":"Ludwig","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Joel L.","family":"Wolf","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"John","family":"Turek","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Philip S.","family":"Yu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"351","published-online":{"date-parts":[[2006,7,28]]},"reference":[{"key":"R1","doi-asserted-by":"publisher","DOI":"10.1137\/0209064"},{"key":"R2","doi-asserted-by":"publisher","DOI":"10.1016\/0166-218X(83)90012-4"},{"key":"R3","doi-asserted-by":"publisher","DOI":"10.1137\/0209062"},{"key":"R4","doi-asserted-by":"publisher","DOI":"10.1137\/0204015"},{"key":"R5","unstructured":"M. Garey and D. Johnson,\n                      Computers and Intractability: A Guide to the Theory of NP\u2010Completeness\n                      , W. H. Freeman and Company, San Francisco, CA, 1979."},{"key":"R6","unstructured":"D. Johnson,\n                      Near\u2010Optimal Bin\u2010Packing Algorithms\n                      , Tech. Report MAC TR\u2010109, MIT, Cambridge, MA, June 1973."},{"key":"R7","doi-asserted-by":"publisher","DOI":"10.1016\/S0022-0000(74)80026-7"},{"key":"R8","unstructured":"W. Ludwig and P. Tiwari,\n                      The Power of Choice in Scheduling Parallel Tasks\n                      , Technical Report 1190, Computer Sciences Department, University of Wisconsin\u2013Madison, November 1993."},{"key":"R9","doi-asserted-by":"publisher","DOI":"10.1016\/0020-0190(80)90121-0"},{"key":"R10","doi-asserted-by":"publisher","DOI":"10.1002\/nav.3800030106"},{"key":"R11","doi-asserted-by":"crossref","unstructured":"J. Turek, W. Ludwig, J. Wolf, L. Fleischer, P. Tiwari, J. Glasgow, U. Schwiegelshohn, and P. Yu,\n                      Scheduling parallelizable tasks to minimize average response time\n                      , in Proceedings of the 6th Annual Symposium on Parallel Algorithms and Architectures, Cape May, NJ, June 1994, pp. 200\u2013209.","DOI":"10.1145\/181014.181331"},{"key":"R12","unstructured":"John Turek, Uwe Schwiegelshohn, Joel Wolf, Philip Yu, Scheduling parallel tasks to minimize average response time, ACM, New York, 1994, 112\u201312195c:68032"},{"key":"R13","doi-asserted-by":"crossref","unstructured":"J. Turek, J. Wolf, K. Pattipati, and P. Yu,\n                      Scheduling parallelizable tasks: Putting it all on the shelf\n                      , in Proceedings of the ACM Sigmetrics Conference, Newport, RI, June 1992, pp. 225\u2013236.","DOI":"10.1145\/133057.133111"},{"key":"R14","doi-asserted-by":"crossref","unstructured":"J. Turek, J. Wolf, and P. Yu,\n                      Approximate algorithms for scheduling parallelizable tasks\n                      , in Proceedings of the 4th Annual Symposium on Parallel Algorithms and Architectures, San Diego, CA, June 1992, pp. 323\u2013332.","DOI":"10.1145\/140901.141909"}],"container-title":["SIAM Journal on Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/epubs.siam.org\/doi\/pdf\/10.1137\/S0097539795286831","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,8,21]],"date-time":"2026-08-21T18:13:20Z","timestamp":1787336000000},"score":1,"resource":{"primary":{"URL":"https:\/\/epubs.siam.org\/doi\/10.1137\/S0097539795286831"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,1]]},"references-count":14,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1998,1]]}},"alternative-id":["10.1137\/S0097539795286831"],"URL":"https:\/\/doi.org\/10.1137\/s0097539795286831","relation":{},"ISSN":["0097-5397","1095-7111"],"issn-type":[{"value":"0097-5397","type":"print"},{"value":"1095-7111","type":"electronic"}],"subject":[],"published":{"date-parts":[[1998,1]]}}}