{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T04:06:15Z","timestamp":1768449975380,"version":"3.49.0"},"reference-count":27,"publisher":"World Scientific Pub Co Pte Ltd","issue":"06","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Asia Pac. J. Oper. Res."],"published-print":{"date-parts":[[2009,12]]},"abstract":"<jats:p>This paper focuses on scheduling problem of a pipe-processing flowshop in a shipyard. The flowshop composes of five stages, including cutting, bending, welding preprocessing, argon-welding and CO<jats:sub>2<\/jats:sub>-welding, and each stage consists of identical parallel machines. Since thousands of pipes are mounted on the hull block before erection, the pipe-processing scheduling is a critical task for shipbuilding to meet the due date of the block erection. A tabu search algorithm is developed for the scheduling problem with the objective of minimizing total tardiness. Computational experiments are performed on the collected real data. Results show that the proposed algorithm is efficient for this problem.<\/jats:p>","DOI":"10.1142\/s0217595909002493","type":"journal-article","created":{"date-parts":[[2010,1,22]],"date-time":"2010-01-22T10:59:05Z","timestamp":1264157945000},"page":"817-829","source":"Crossref","is-referenced-by-count":3,"title":["A TABU SEARCH ALGORITHM FOR A PIPE-PROCESSING FLOWSHOP SCHEDULING PROBLEM MINIMIZING TOTAL TARDINESS IN A SHIPYARD"],"prefix":"10.1142","volume":"26","author":[{"given":"XIAOFENG","family":"HU","sequence":"first","affiliation":[{"name":"School of Mechanical Engineering, Shanghai Jiao Tong University, 800 Dong Chuan Road, Shanghai 200240, People's Republic of China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"JINGSONG","family":"BAO","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Shanghai Jiao Tong University, 800 Dong Chuan Road, Shanghai 200240, People's Republic of China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"YE","family":"JIN","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Shanghai Jiao Tong University, 800 Dong Chuan Road, Shanghai 200240, People's Republic of China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"219","published-online":{"date-parts":[[2011,11,20]]},"reference":[{"key":"rf1","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(02)00198-3"},{"key":"rf2","first-page":"210","volume":"23","author":"Bao J.","journal-title":"Journal of Ship Production"},{"key":"rf3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.06.033"},{"key":"rf4","first-page":"203","volume":"61","author":"Cho K.-K.","journal-title":"International Journal of Production Economics"},{"key":"rf5","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)62865-0"},{"key":"rf6","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)62135-0"},{"key":"rf7","first-page":"30","volume":"23","author":"Duck Y. Y.","journal-title":"Journal of Ship Production"},{"key":"rf8","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00224-6"},{"key":"rf9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.05.027"},{"key":"rf10","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2002.tb00492.x"},{"key":"rf11","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.12.025"},{"key":"rf12","doi-asserted-by":"publisher","DOI":"10.1080\/09511920500064789"},{"key":"rf13","doi-asserted-by":"publisher","DOI":"10.1080\/0020754041233127044"},{"key":"rf14","doi-asserted-by":"publisher","DOI":"10.1080\/00207540310001602892"},{"key":"rf15","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(96)00205-6"},{"key":"rf16","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(03)00011-2"},{"key":"rf17","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00644-6"},{"key":"rf18","doi-asserted-by":"crossref","first-page":"134","DOI":"10.5957\/jsp.2005.21.2.134","volume":"21","author":"Okumoto Y.","journal-title":"Journal of Ship Production"},{"key":"rf19","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2006.01.068"},{"key":"rf20","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(96)00004-6"},{"key":"rf21","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.06.038"},{"key":"rf22","first-page":"985","volume":"33","author":"Soewandi H.","journal-title":"IIE Transactions"},{"key":"rf23","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2007.09.013"},{"key":"rf24","doi-asserted-by":"crossref","first-page":"139","DOI":"10.5957\/jsp.2006.22.3.139","volume":"22","author":"Varghese R.","journal-title":"Journal of Ship Production"},{"key":"rf25","author":"Wang X.","journal-title":"Computers and Operations Research"},{"key":"rf26","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00873-1"},{"key":"rf27","doi-asserted-by":"crossref","first-page":"17","DOI":"10.5957\/jsp.2007.23.1.17","volume":"23","author":"Xu A.","journal-title":"Journal of Ship Production"}],"container-title":["Asia-Pacific Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.worldscientific.com\/doi\/pdf\/10.1142\/S0217595909002493","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,20]],"date-time":"2021-10-20T17:21:03Z","timestamp":1634750463000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.worldscientific.com\/doi\/abs\/10.1142\/S0217595909002493"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,12]]},"references-count":27,"journal-issue":{"issue":"06","published-online":{"date-parts":[[2011,11,20]]},"published-print":{"date-parts":[[2009,12]]}},"alternative-id":["10.1142\/S0217595909002493"],"URL":"https:\/\/doi.org\/10.1142\/s0217595909002493","relation":{},"ISSN":["0217-5959","1793-7019"],"issn-type":[{"value":"0217-5959","type":"print"},{"value":"1793-7019","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,12]]}}}